X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25051

Well Details

Well ID: 34-169-25051
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Canaan Township
Operator Name: PETRO EVALUATION SERVICES INC
Well Pad ID:
Farm/Lease Name: BEYELER LOWELL
License Status: Producing
License Date: 1995-07-03
Spud Date: 1995-08-10
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1995-08-16
Well Total Depth: 5615.00 ft
Configuration: Vertical
Latitude: 40.910000
Longitude: -81.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1995-07-03 Issued Date 7/3/95 Expired Date 7/2/96 Acres 0045126 Tool Type RTAF Proposed Formation CLINTON/TPLU Proposed Depth 05615 Proposed Drill Depth 05615
Original Spud 1995-08-11
Completed 1995-08-16
Reached Total Depth 1995-08-16
CO 1995-11-01 164 PETRO EVALUATION SERV INC GeoDate 7/3/95
Construction Permit Expires 1996-07-02
Completion Report Received 1996-07-31
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5537 0
5537 0
2006-09-11 5551 5555 33
5551 5555 33
5537 0
2006-09-11 5585 5590 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 2000 Gal 0 TREATED W/2000 GAL HCL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1995 PETRO EVALUATION SERVICES INC 6989.00 456.00 69
1996 PETRO EVALUATION SERVICES INC 28580.00 840.00 365
1997 PETRO EVALUATION SERVICES INC 16992.00 470.00 365
1998 PETRO EVALUATION SERVICES INC 14613.00 181.00 365
1999 PETRO EVALUATION SERVICES INC 10152.00 341.00 365
2000 PETRO EVALUATION SERVICES INC 8192.00 0.00 365
2001 PETRO EVALUATION SERVICES INC 5932.00 0.00 365
2002 PETRO EVALUATION SERVICES INC 7610.00 163.00 365
2003 PETRO EVALUATION SERVICES INC 5135.00 0.00 365
2004 PETRO EVALUATION SERVICES INC 3816.00 118.00 365
2005 PETRO EVALUATION SERVICES INC 2284.00 0.00 365
2006 PETRO EVALUATION SERVICES INC 2675.00 0.00 365
2007 PETRO EVALUATION SERVICES INC 2150.00 154.00 291
2008 PETRO EVALUATION SERVICES INC 758.00 0.00 275
2009 PETRO EVALUATION SERVICES INC 729.00 0.00 300
2010 PETRO EVALUATION SERVICES INC 2632.00 218.00 344
2011 PETRO EVALUATION SERVICES INC 3850.00 76.00 365
2012 PETRO EVALUATION SERVICES INC 5200.00 79.00 366
2013 PETRO EVALUATION SERVICES INC 27703.00 38.00 365
2014 PETRO EVALUATION SERVICES INC 2186.00 0.00 365
2015 PETRO EVALUATION SERVICES INC 3668.00 41.00 365
2016 PETRO EVALUATION SERVICES INC 3731.00 64.00 365
2017 PETRO EVALUATION SERVICES INC 3012.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1995 PETRO EVALUATION SERVICES INC Brine 262 69
1996 PETRO EVALUATION SERVICES INC Brine 50 365
1997 PETRO EVALUATION SERVICES INC Brine 22 365
1998 PETRO EVALUATION SERVICES INC Brine 21 365
1999 PETRO EVALUATION SERVICES INC Brine 0 365
2000 PETRO EVALUATION SERVICES INC Brine 0 365
2001 PETRO EVALUATION SERVICES INC Brine 0 365
2002 PETRO EVALUATION SERVICES INC Brine 20 365
2003 PETRO EVALUATION SERVICES INC Brine 0 365
2004 PETRO EVALUATION SERVICES INC Brine 17 365
2005 PETRO EVALUATION SERVICES INC Brine 0 365
2006 PETRO EVALUATION SERVICES INC Brine 0 365
2007 PETRO EVALUATION SERVICES INC Brine 56 291
2008 PETRO EVALUATION SERVICES INC Brine 0 275
2009 PETRO EVALUATION SERVICES INC Brine 0 300
2010 PETRO EVALUATION SERVICES INC Brine 1652 344
2011 PETRO EVALUATION SERVICES INC Brine 653 365
2012 PETRO EVALUATION SERVICES INC Brine 696 366
2013 PETRO EVALUATION SERVICES INC Brine 708 365
2014 PETRO EVALUATION SERVICES INC Brine 540 365
2015 PETRO EVALUATION SERVICES INC Brine 641 365
2016 PETRO EVALUATION SERVICES INC Brine 638 365
2017 PETRO EVALUATION SERVICES INC Brine 645 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1173348181 2015-12-9 0:00: PW No Violations
-943612900 2016-9-14 0:00: PW No Violations
0000014960 Preliminary Restoration No Violations PASSED Y WITNESSED 12/15/95 INSPECTOR MARK MORELAND DATE 12/1519/95 DATA FROM OLD VAX INFO
0943612900 2016-09-14 Production Wells No Violations Inspected production well on 09/14/2016. The tank battery consists of 2-100 bbl steel tanks and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. No problems were noted at the time of the inspection.
1049755770 2017-02-02 Production Wells No Violations Inspected production well on 02/02/2017. The tank battery consists of 2-100 bbl steel tanks and 1-horizontal separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. A small stuffing box leak was noted at the time of the inspection. Petro Evaluations office was notified of this issue, and planned to mobilize field staff immediately to correct the issue. No other problems were noted at the time of the inspection.
1173348181 2015-12-09 Production Wells No Violations Inspected production well on 12/09/2015. The tank battery consists of 2-100 bbl steel tanks and 1-horizontal separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. No problems were noted at the time of the inspection.
14960 PL No Violations
1754771827 2017-02-02 Preliminary Restoration No Violations Inspected production well on 02/02/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.

For data sources see[9]

References