Well Details

Well ID: 34-169-25284
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: JENTES ROBERT E
License Status: Producing
License Date: 1999-05-06
Spud Date: 1999-06-01
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 1999-06-08
Well Total Depth: 5520.00 ft
Configuration: Vertical
Latitude: 40.870000
Longitude: -81.990000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1999-05-06 337 HARLEY DRILLING & PRODUCI Proposed Formation CLINTON/TPLA Issued Date 5/6/99 Expired Date 5/5/00 6:00:00 AM
Original Spud 1999-06-01 RBDMS Rec
Completed 1999-06-08 RBDMS Rec
Reached Total Depth 1999-06-08 RBDMS Rec
Completion Report Received 2000-02-10 RBDMS Rec
Construction Permit Expires 2000-05-05 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-05-11 5433 5438 11
2000-05-11 5456 5481 51
5433 5438 11
5456 5481 51
5433 5438 11

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 1500 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1999 HARLEY DRILLING & PRODUCING LT 25790.00 3329.00 365
2000 HARLEY DRILLING & PRODUCING LT 90630.00 7018.00 365
2001 HARLEY DRILLING & PRODUCING LT 67671.00 3598.00 365
2002 HARLEY DRILLING & PRODUCING LT 39116.00 1189.00 365
2003 HARLEY DRILLING & PRODUCING LT 27082.00 673.00 365
2004 HARLEY DRILLING & PRODUCING LT 12443.00 674.00 365
2005 HARLEY DRILLING & PRODUCING LT 12633.00 513.00 365
2006 HARLEY DRILLING & PRODUCING LT 6162.00 847.00 365
2007 HARLEY DRILLING & PRODUCING LT 3927.00 667.00 365
2008 HARLEY DRILLING & PRODUCING LT 2774.00 651.00 365
2009 HARLEY DRILLING & PRODUCING LT 14302.00 3441.00 365
2010 HARLEY DRILLING & PRODUCING LT 11176.00 2444.00 365
2011 HARLEY DRILLING & PRODUCING LT 4613.00 1254.00 365
2012 HARLEY DRILLING & PRODUCING LT 3428.00 614.00 366
2013 HARLEY DRILLING & PRODUCING LT 3245.00 1528.00 365
2014 HARLEY DRILLING & PRODUCING LT 4080.00 688.00 365
2015 HARLEY DRILLING & PRODUCING LT 1259.00 165.00 365
2016 HARLEY DRILLING & PRODUCING LT 1586.00 2418.00 365
2017 HARLEY DRILLING & PRODUCING LT 1465.00 2432.00 365
2018 HARLEY DRILLING & PRODUCING LT 1530.00 1879.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1999 HARLEY DRILLING & PRODUCING LT Brine 0 365
2000 HARLEY DRILLING & PRODUCING LT Brine 0 365
2001 HARLEY DRILLING & PRODUCING LT Brine 0 365
2002 HARLEY DRILLING & PRODUCING LT Brine 0 365
2003 HARLEY DRILLING & PRODUCING LT Brine 0 365
2004 HARLEY DRILLING & PRODUCING LT Brine 0 365
2005 HARLEY DRILLING & PRODUCING LT Brine 0 365
2006 HARLEY DRILLING & PRODUCING LT Brine 0 365
2007 HARLEY DRILLING & PRODUCING LT Brine 0 365
2008 HARLEY DRILLING & PRODUCING LT Brine 746 365
2009 HARLEY DRILLING & PRODUCING LT Brine 2815 365
2010 HARLEY DRILLING & PRODUCING LT Brine 1768 365
2011 HARLEY DRILLING & PRODUCING LT Brine 1459 365
2012 HARLEY DRILLING & PRODUCING LT Brine 533 366
2013 HARLEY DRILLING & PRODUCING LT Brine 508 365
2014 HARLEY DRILLING & PRODUCING LT Brine 835 365
2015 HARLEY DRILLING & PRODUCING LT Brine 675 365
2016 HARLEY DRILLING & PRODUCING LT Brine 983 365
2017 HARLEY DRILLING & PRODUCING LT Brine 480 365
2018 HARLEY DRILLING & PRODUCING LT Brine 235 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1298676473 2011-3-14 0:00: PW No Violations 1.00
-1546578761 2016-10-19 0:00 PW No Violations
-1733094024 2020-4-8 0:00:0 PW No Violations
0130304188 2012-11-30 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0524516357 2015-10-29 Production Wells No Violations Inspected production well on 10/29/2015. The tank battery consists of 2-210 bbl steel tanks, 1-2,500 gal plastic tank, 1-horizontal separator, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
0683061099 2014-07-14 Production Wells No Violations This pumping unit well appears to have no problems at this time.
0688409743 2018-03-07 Production Wells No Violations Inspected production well on 03/07/2018. The tank battery consists of 1-210 bbl steel tank, 1-2,500 gal plastic tank (shared), 1-horizontal separator with a drip (shared), 1-meter box (shared), and 1-compressor with a drip (shared), located within an earthen dike; the diked area and noted equipment are shared with the Jentes #H-2 well (PN: 169-25380). The well is equipped with a pump jack with an electric motor, and a compressor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0760507824 2017-02-01 Preliminary Restoration No Violations Inspected production well on 02/01/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
1298676473 2011-03-14 Production Wells No Violations
130304188 2012-11-30 0:00 PW No Violations
1420724427 2017-02-01 Production Wells No Violations Inspected production well on 02/01/2017. The tank battery consists of 2-210 bbl steel tanks, 1-2,500 gal plastic tank, 1-horizontal separator, and 1-compressor, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor, and a compressor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
1546578761 2016-10-19 Production Wells No Violations Inspected production well on 10/19/2016. The tank battery consists of 2-210 bbl steel tanks, 1-3,000 gal plastic tank, 1-horizontal separator, and 1-compressor, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor and a compressor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
2132610604 2016-10-19 Preliminary Restoration No Violations Inspected production well on 10/19/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
524516357 2015-10-29 0:00 PW No Violations
683061099 2014-7-14 0:00: PW No Violations 0.50
688409743 2018-3-7 0:00:0 PW No Violations
760507824 2017-2-1 0:00:0 PL No Violations
iDIAN00217 1999-10-04 Preliminary Restoration No Violations
iDIAN002179 1999-10-4 0:00: PL No Violations
iDIAN00362 1999-11-10 Preliminary Restoration No Violations
iDIAN003620 1999-11-10 0:00 PL No Violations

For data sources see[9]