X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25300

Well Details

Well ID: 34-169-25300
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: LEATHERMAN TRUST CLYDE & VIRGINIA
License Status: Producing
License Date: 1999-08-27
Spud Date: 2000-08-01
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2000-08-12
Well Total Depth: 5623.00 ft
Configuration: Vertical
Latitude: 40.900000
Longitude: -81.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1999-08-27 Proposed Formations:CLINTON/TPLU, Issued Date:8/27/99, Expired Date:8/26/00 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 1999-09-29 RBDMS Rec
Correction to Well 2000-03-03 CHANGE IN FOOTAGE LOCATION TO 1966'SL & 794'EL OF SW QTR. SEC. 31; CHANGE IN UNIT SIZE TO 80 ACRES.
Original Spud 2000-08-01 RBDMS Rec
Reached Total Depth 2000-08-12 RBDMS Rec
Construction Permit Expires 2000-08-26 RBDMS Rec
Completion Report Received 2000-10-02 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-12-15 5546 5556 21
2000-12-15 5567 5587 41
5546 5556 21
5567 5587 41
5546 5556 21

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 1600 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2000 HARLEY DRILLING & PRODUCING LT 9427.00 4045.00 365
2001 HARLEY DRILLING & PRODUCING LT 64529.00 9291.00 365
2002 HARLEY DRILLING & PRODUCING LT 47266.00 4100.00 365
2003 HARLEY DRILLING & PRODUCING LT 21529.00 1704.00 365
2004 HARLEY DRILLING & PRODUCING LT 18108.00 1383.00 365
2005 HARLEY DRILLING & PRODUCING LT 14428.00 743.00 365
2006 HARLEY DRILLING & PRODUCING LT 8591.00 690.00 365
2007 HARLEY DRILLING & PRODUCING LT 6090.00 348.00 365
2008 HARLEY DRILLING & PRODUCING LT 6207.00 515.00 365
2009 HARLEY DRILLING & PRODUCING LT 18051.00 5515.00 365
2010 HARLEY DRILLING & PRODUCING LT 25177.00 3521.00 365
2011 HARLEY DRILLING & PRODUCING LT 19949.00 3430.00 365
2012 HARLEY DRILLING & PRODUCING LT 15982.00 2765.00 366
2013 HARLEY DRILLING & PRODUCING LT 9672.00 1578.00 365
2014 HARLEY DRILLING & PRODUCING LT 7335.00 1578.00 365
2015 HARLEY DRILLING & PRODUCING LT 7261.00 1469.00 365
2016 HARLEY DRILLING & PRODUCING LT 7727.00 1838.00 365
2017 HARLEY DRILLING & PRODUCING LT 7231.00 1428.00 365
2018 HARLEY DRILLING & PRODUCING LT 5150.00 1400.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2000 HARLEY DRILLING & PRODUCING LT Brine 0 365
2001 HARLEY DRILLING & PRODUCING LT Brine 0 365
2002 HARLEY DRILLING & PRODUCING LT Brine 0 365
2003 HARLEY DRILLING & PRODUCING LT Brine 35 365
2004 HARLEY DRILLING & PRODUCING LT Brine 0 365
2005 HARLEY DRILLING & PRODUCING LT Brine 0 365
2006 HARLEY DRILLING & PRODUCING LT Brine 0 365
2007 HARLEY DRILLING & PRODUCING LT Brine 0 365
2008 HARLEY DRILLING & PRODUCING LT Brine 330 365
2009 HARLEY DRILLING & PRODUCING LT Brine 650 365
2010 HARLEY DRILLING & PRODUCING LT Brine 183 365
2011 HARLEY DRILLING & PRODUCING LT Brine 65 365
2012 HARLEY DRILLING & PRODUCING LT Brine 159 366
2013 HARLEY DRILLING & PRODUCING LT Brine 50 365
2014 HARLEY DRILLING & PRODUCING LT Brine 86 365
2015 HARLEY DRILLING & PRODUCING LT Brine 95 365
2016 HARLEY DRILLING & PRODUCING LT Brine 34 365
2017 HARLEY DRILLING & PRODUCING LT Brine 140 365
2018 HARLEY DRILLING & PRODUCING LT Brine 145 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1415621860 2018-6-29 0:00: PW No Violations
-1878000444 2013-10-10 0:00 PW No Violations 0.50
-764948482 2012-11-26 0:00 PW No Violations
-841382404 2020-7-2 0:00:0 PW No Violations
0764948482 2012-11-26 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0765440630 2017-03-09 Production Wells No Violations Inspected production well on 03/09/2017. The tank battery consists of 3-210 bbl steel tanks, 1-1,550 gal plastic tank (shared), 2-horizontal separators, and 1-compressor (shared), located within an earthen dike; the diked area is shared with the tank battery for the Leatherman-Snyder #1 (PN: 169-20767). The tank battery is used by multiple wells (2), however well identification is only posted for one of the wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. No well identification is posted at the wellhead as required. Jason Klauss with Harley Drilling was notified of these issues and will have them addressed promptly. The well is located ~400 from its RBDMS location. No other problems were noted at the time of the inspection.
1080961200 2014-10-14 Production Wells No Violations This pumping unit well has no apparent problems or violations at this time.
1260231799 2015-12-22 Production Wells No Violations Inspected production well on 12/22/2015. The tank battery consists of 3-210 bbl steel tanks, 3-100 bbl steel tanks, 1-1,550 gal plastic tank, 1-vertical separator, 2-horizontal separators, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for 2 of the 3 wells. Jim Vacha, Harleys pumper, was on-site at the time of the inspection. He was notified of this issue and will address it promptly. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No other problems were noted at the time of the inspection.
1323852479 2017-03-09 Preliminary Restoration No Violations Inspected production well on 03/09/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes.
1415621860 2018-06-29 Production Wells No Violations Inspected production well on 06/29/2018. The tank battery consists of 3-210 bbl steel tanks, 1-1,550 gal plastic tank, 2-horizontal separators with drips, 1-meter box, and 1-compressor with a drip (shared), located within an earthen dike; the diked area and noted equipment are shared with the tank battery for the Leatherman-Snyder #1 well (PN: 169-20767). The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. The well is located ~450 from its RBDMS location. A map showing the location discrepancy, as well as a request for the location to be updated in RBDMS was sent to Gregg Miler and Aaron Lantz (DOGRM Columbus). No other problems were noted at the time of the inspection.
1878000444 2013-10-10 Production Wells No Violations This is a producing pumping unit well. There are no apparent problems at time of inspection.
765440630 2017-3-9 0:00:0 PW No Violations
iDIAN00586 2001-01-25 Preliminary Restoration No Violations
iDIAN005869 2001-1-25 0:00: PL No Violations

For data sources see[9]

References