If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25365 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.85,"lon":-81.97,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: RED BIRD PRODUCING CO | |
Well Pad ID: | |
Farm/Lease Name: MORRIS JANE | |
License Status: Producing | |
License Date: 2000-10-18 | |
Spud Date: 2000-11-01 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2000-11-09 | |
Well Total Depth: 5548.00 ft | |
Configuration: Vertical | |
Latitude: 40.850000 | |
Longitude: -81.970000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2000-10-18 | 4653 RED BIRD PRODUCING CO Proposed Formation TREMPEALEAU Issued Date 10/18/00 Expired Date 10/18/01 6:00:00 AM |
Original Spud | 2000-11-01 | RBDMS Rec |
Completed | 2000-11-09 | RBDMS Rec |
Reached Total Depth | 2000-11-09 | RBDMS Rec |
Completion Report Received | 2001-06-26 | RBDMS Rec |
Construction Permit Expires | 2001-10-18 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2001-09-05 | 5510 | 5527 | 69 |
5510 | 5527 | 69 | |
5510 | 5527 | 69 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 20 | 1500 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | RED BIRD PRODUCING CO | 21349.00 | 14267.00 | 365 |
2002 | DALTON & HANNA LTD | 59467.00 | 10466.00 | 365 |
2003 | DALTON & HANNA LTD | 44402.00 | 5842.00 | 365 |
2004 | DALTON & HANNA LTD | 28184.00 | 3500.00 | 365 |
2005 | DALTON & HANNA LTD | 14629.00 | 2272.00 | 365 |
2006 | DALTON & HANNA LTD | 9459.00 | 1753.00 | 365 |
2007 | DALTON & HANNA LTD | 7202.00 | 1283.00 | 365 |
2008 | DALTON & HANNA LTD | 5617.00 | 1111.00 | 365 |
2009 | DALTON & HANNA LTD | 4250.00 | 1077.00 | 365 |
2010 | DALTON & HANNA LTD | 2832.00 | 848.00 | 365 |
2011 | DALTON & HANNA LTD | 2889.00 | 674.00 | 365 |
2012 | DALTON & HANNA LTD | 2681.00 | 664.00 | 366 |
2013 | RED BIRD PRODUCING CO | 14526.00 | 1005.00 | 365 |
2014 | RED BIRD PRODUCING CO | 11222.00 | 826.00 | 365 |
2015 | RED BIRD PRODUCING CO | 10859.00 | 1489.00 | 365 |
2016 | RED BIRD PRODUCING CO | 12151.00 | 1354.00 | 365 |
2017 | RED BIRD PRODUCING CO | 11178.00 | 1322.00 | 365 |
2018 | RED BIRD PRODUCING CO | 11658.00 | 1262.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | RED BIRD PRODUCING CO | Brine | 0 | 365 |
2002 | DALTON & HANNA LTD | Brine | 0 | 365 |
2003 | DALTON & HANNA LTD | Brine | 0 | 365 |
2004 | DALTON & HANNA LTD | Brine | 0 | 365 |
2005 | DALTON & HANNA LTD | Brine | 0 | 365 |
2006 | DALTON & HANNA LTD | Brine | 0 | 365 |
2007 | DALTON & HANNA LTD | Brine | 0 | 365 |
2008 | DALTON & HANNA LTD | Brine | 0 | 365 |
2009 | DALTON & HANNA LTD | Brine | 0 | 365 |
2010 | DALTON & HANNA LTD | Brine | 0 | 365 |
2011 | DALTON & HANNA LTD | Brine | 0 | 365 |
2012 | DALTON & HANNA LTD | Brine | 0 | 366 |
2013 | RED BIRD PRODUCING CO | Brine | 117 | 365 |
2014 | RED BIRD PRODUCING CO | Brine | 47 | 365 |
2015 | RED BIRD PRODUCING CO | Brine | 75 | 365 |
2016 | RED BIRD PRODUCING CO | Brine | 0 | 365 |
2017 | RED BIRD PRODUCING CO | Brine | 48 | 365 |
2018 | RED BIRD PRODUCING CO | Brine | 22 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1070402850 | 2003-3-21 0:00: | PL | No Violations | 0.70 |
-1537958917 | 2017-1-13 0:00: | PW | No Violations | |
-222541908 | 2013-4-16 0:00: | PW | No Violations | 0.50 |
-872912842 | 2016-7-14 0:00: | PW | No Violations | |
0020376259 | 2002-04-05 | Production Wells | No Violations | |
0222541908 | 2013-04-16 | Production Wells | No Violations | This is a producing pump unit well. There are no apparent problems at this time. |
0872912842 | 2016-07-14 | Production Wells | No Violations | Inspected production well on 07/14/2016. The tank battery consists of 4-210 bbl steel tanks and 1-100 bbl steel tank, located within an earthen dike. 2-horizontal separators are located nearby. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0958263676 | 2018-11-14 | Production Wells | No Violations | Inspected production well on 11/14/2018. The tank battery consists of 2-210 bbl steel tanks and 1-100 bbl steel tank (shared), located within an earthen dike; 1-horizontal separator with a drip is located nearby. The diked area and noted equipment are shared with the tank battery for the Rudd #3 well (PN: 169-25363). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
1052962080 | 2017-01-13 | Preliminary Restoration | No Violations | Inspected production well on 01/13/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1070402850 | 2003-03-21 | Preliminary Restoration | No Violations | |
1537958917 | 2017-01-13 | Production Wells | No Violations | Inspected production well on 01/13/2017. The tank battery consists of 2-210 bbl steel tanks and 1-100 bbl steel tank (shared with the Rudd #3 well; PN: 169-25363), located within an earthen dike; the diked area is shared with the tank battery for the Rudd #3 well (PN: 169-25363). 1-horizontal separator is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1638966970 | 2014-10-16 | Production Wells | No Violations | This pumping unit well has no apparent problems or violations at time of inspection. |
1905465103 | 2018-02-08 | Production Wells | No Violations | Inspected production well on 02/08/2018. The tank battery consists of 2-210 bbl steel tanks and 1-100 bbl steel tank (shared), located within an earthen dike (shared); 1-horizontal separator with a drip is located nearby. The 100 bbl tank and diked area are shared with the Rudd #3 well (PN: 169-25363). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
1996945485 | 2015-11-19 | Production Wells | No Violations | Inspected production well on 11/19/2015. The tank battery consists of 4-210 bbl steel tanks and 1-100 bbl steel tank located within an earthen dike; 2-horizontal separators are located nearby. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
20376259 | 2002-4-5 0:00:0 | PW | No Violations | 0.70 |
326277275 | 2019-7-16 0:00: | PW | No Violations | |
594285579 | 2020-4-2 0:00:0 | PW | No Violations | |
958263676 | 2018-11-14 0:00 | PW | No Violations |
For data sources see[9]