X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25376

Well Details

Well ID: 34-169-25376
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Clinton Township
Operator Name: KENOIL LLC
Well Pad ID:
Farm/Lease Name: BOLEY
License Status: Final Restoration
License Date: 2010-06-04
Spud Date: 2001-07-02
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2001-07-07
Well Total Depth: 3194.00 ft
Configuration: Vertical
Latitude: 40.690000
Longitude: -82.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2001-01-17 627 KENOIL Proposed Formation CLINTON, KNOX Issued Date 1/17/01 Expired Date 1/17/02 6:00:00 AM
Original Spud 2001-07-02 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen
Completed 2001-07-07 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen
Reached Total Depth 2001-07-07 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen
Completion Report Received 2001-11-01 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen
APP 2010-06-04 Proposed Formations:CLINTON, Issued Date:6/4/2010, Expired Date:6/4/2011 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2010-09-02 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen
Construction Permit Expires 2011-06-04 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen
Record Last Modified 2017-02-15 Capstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John PolenCapstar Drilling set 567 ft of 8 5/8 casing c/w 225 sks by Petroset cementing John Polen

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2002-01-07 3016 3084 67
3016 3084 67
3016 3084 67

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1800 Bbl 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2001 KENOIL LLC 168.00 0.00 365
2002 KENOIL LLC 1790.00 70.00 365
2003 KENOIL LLC 944.00 0.00 365
2004 KENOIL LLC 488.00 62.00 365
2005 KENOIL LLC 411.00 0.00 365
2006 KENOIL LLC 341.00 0.00 0
2007 KENOIL LLC 328.00 60.00 0
2008 KENOIL LLC 216.00 0.00 365
2009 KENOIL LLC 250.00 0.00 365
2010 KENOIL LLC 213.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2001 KENOIL LLC Brine 400 365
2002 KENOIL LLC Brine 65 365
2003 KENOIL LLC Brine 30 365
2004 KENOIL LLC Brine 17 365
2005 KENOIL LLC Brine 0 365
2006 KENOIL LLC Brine 0
2007 KENOIL LLC Brine 0
2008 KENOIL LLC Brine 0 365
2009 KENOIL LLC Brine 35 365
2010 KENOIL LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1259753032 2010-11-3 0:00: FR No Violations 0.70
-1928696000 2010-9-16 0:00: FR No Violations 1.00
-435765567 2010-9-2 0:00:0 PB No Violations 6.70
0435765567 2010-09-02 Plug / Plug Back No Violations Plug well to surface today with Moran well service .
0482773918 2010-09-27 Final Restoration No Violations Pits are closed and pipe has been cut off below grade. Need more vegetation before final restoration can be passed
1026142656 2010-09-01 Plug / Plug Back No Violations Phil Moran is plugging well and will be ready in the morning to set bottom plug.
1259753032 2010-11-03 Final Restoration No Violations Meets requirements for restoration final.
1694344919 2010-09-07 Plug / Plug Back No Violations Check to see if there are any leaks and found none. Cement down 5 ft so pipe can be cut off.
1928696000 2010-09-16 Final Restoration No Violations Pits are closed and pipe has been cut off below grade. No leaks. Area needs more vegetation before final can pass.
482773918 2010-9-27 0:00: FR No Violations 1.00

For data sources see[9]

References