If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25465 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.91,"lon":-81.96,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Canaan Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: WEINMAN | |
License Status: Producing | |
License Date: 2003-03-18 | |
Spud Date: 2003-04-28 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2003-05-02 | |
Well Total Depth: 3436.00 ft | |
Configuration: Vertical | |
Latitude: 40.910000 | |
Longitude: -81.960000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-03-18 | Proposed Formations:CLINTON, Issued Date:3/18/2003, Expired Date:3/17/2004 6:00:00 AM, Drilling unit acres:51, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2003-04-28 | RBDMS Rec |
Completed | 2003-05-02 | RBDMS Rec |
Reached Total Depth | 2003-05-02 | RBDMS Rec |
Completion Report Received | 2003-07-07 | RBDMS Rec |
Construction Permit Expires | 2004-03-17 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-08-20 | 3266 | 3310 | 33 |
3266 | 3310 | 33 | |
3266 | 3310 | 33 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | KENOIL LLC | 2534.00 | 192.00 | 0 |
2004 | KENOIL LLC | 2268.00 | 155.00 | 365 |
2005 | KENOIL LLC | 1534.00 | 149.00 | 365 |
2006 | KENOIL LLC | 1565.00 | 166.00 | 365 |
2007 | KENOIL LLC | 1136.00 | 73.00 | 365 |
2008 | KENOIL LLC | 734.00 | 94.00 | 365 |
2009 | KENOIL LLC | 702.00 | 171.00 | 365 |
2010 | KENOIL LLC | 1081.00 | 118.00 | 365 |
2011 | KENOIL LLC | 1037.00 | 104.00 | 0 |
2012 | KENOIL LLC | 537.00 | 52.00 | 366 |
2013 | KENOIL LLC | 1004.00 | 148.00 | 365 |
2014 | KENOIL LLC | 951.00 | 109.00 | 365 |
2015 | KENOIL LLC | 726.00 | 90.00 | 365 |
2016 | KENOIL LLC | 481.00 | 63.00 | 365 |
2017 | KENOIL LLC | 546.00 | 58.00 | 365 |
2018 | KENOIL LLC | 970.00 | 58.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | KENOIL LLC | Brine | 65 | |
2004 | KENOIL LLC | Brine | 26 | 365 |
2005 | KENOIL LLC | Brine | 13 | 365 |
2006 | KENOIL LLC | Brine | 0 | 365 |
2007 | KENOIL LLC | Brine | 0 | 365 |
2008 | KENOIL LLC | Brine | 0 | 365 |
2009 | KENOIL LLC | Brine | 0 | 365 |
2010 | KENOIL LLC | Brine | 13 | 365 |
2011 | KENOIL LLC | Brine | 12 | |
2012 | KENOIL LLC | Brine | 0 | 366 |
2013 | KENOIL LLC | Brine | 12 | 365 |
2014 | KENOIL LLC | Brine | 10 | 365 |
2015 | KENOIL LLC | Brine | 0 | 365 |
2016 | KENOIL LLC | Brine | 11 | 365 |
2017 | KENOIL LLC | Brine | 6 | 365 |
2018 | KENOIL LLC | Brine | 13 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1082583095 | 2003-5-5 0:00:0 | PW | No Violations | 1.20 |
-1472586827 | 2020-4-23 0:00: | PW | No Violations | |
-259821233 | 2007-1-31 0:00: | PL | No Violations | 0.70 |
-34262055 | 2017-1-30 0:00: | PL | No Violations | |
0034262055 | 2017-01-30 | Preliminary Restoration | No Violations | Inspected production well on 01/30/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0174096952 | 2017-01-30 | Production Wells | No Violations | Inspected production well on 01/30/2017. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-underground brine vault, and 1-compressor, located within an earthen dike; the diked area is shared with the tank battery for the Weinman #2W (PN: 169-25101). The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0259821233 | 2007-01-31 | Preliminary Restoration | No Violations | Meets requirements for Primary Restoration . |
0597207874 | 2016-12-08 | Production Wells | No Violations | Inspected production well on 12/08/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, 1-horizontal separator, 1-underground brine vault, and 1-compressor, located within an earthen dike. The tank battery is used by multiple wells (4); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0666239105 | 2003-06-09 | Drill / Deepen / Reopen | No Violations | Well just finished being drilled and pits are pumped off ready to close . Liner still in place . |
0823345387 | 2014-05-16 | Production Wells | No Violations | Producing pumping unit well with no apparent problems at time of inspection. |
1082583095 | 2003-05-05 | Production Wells | No Violations | Move rig over hole today to begin frac . |
1447400574 | 2003-04-30 | Drill / Deepen / Reopen | No Violations | Return to check on possilbe arteasion of surface casing . It appeared that maybe it had started to flow on its own when plug was pumped down . It has not appeard after cement job was complete . The rig is dusting at this inspection at 1400 ft. |
1579407824 | 2003-04-29 | Drill / Deepen / Reopen | No Violations | Capstar Drilling set 473 ft. of 8 5/8 casing c/w 180 sks regular cement .Cemented by Petroset Cementing service - witnessed by Inspector 3.25 hrs. Cement remained at surface after job was complete . Cement basket at 58 ft. - set 4/29/2003 11 hole to 512ft. -- 11 3/4 conductor set at 85 ft. on 4/28/2003 surface drilled on fluid only . |
1714429290 | 2018-02-22 | Production Wells | No Violations | Inspected production well on 02/22/2018. The tank battery consists of 2-100 bbl steel tanks, 1-vertical separator, 1-drip, 1-meter with 2-regulators, 1-meter box, and 1-compressor (shared), located within an earthen dike; the diked area and compressor are shared with the Weinman #2W well (PN: 169-25101). The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
174096952 | 2017-1-30 0:00: | PW | No Violations | |
1915971227 | 2016-12-08 | Preliminary Restoration | No Violations | Inspected production well on 12/08/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
2009324704 | 2003-07-21 | Production Wells | No Violations | Pits are closed and area is graded but needs seeded before restoration can be passed. |
2020220506 | 2015-12-03 | Production Wells | No Violations | Inspected production well on 12/03/2015. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, 1-horizontal separator, 1-compressor, and 1-underground brine vault located within an earthen dike. The tank battery is used by multiple wells (4); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
597207874 | 2016-12-8 0:00: | PW | No Violations | |
666239105 | 2003-6-9 0:00:0 | DD | No Violations | 0.70 |
823345387 | 2014-5-16 0:00: | PW | No Violations | 0.50 |
For data sources see[9]