If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25532 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.89,"lon":-81.97,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: CARSON DAVID & SUSAN | |
License Status: Producing | |
License Date: 2005-12-29 | |
Spud Date: 2005-12-31 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2006-01-06 | |
Well Total Depth: 3504.00 ft | |
Configuration: Vertical | |
Latitude: 40.890000 | |
Longitude: -81.970000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-12-29 | Proposed Formations:CLINTON, Issued Date:12/29/2005, Expired Date:12/29/2006 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-12-31 | RBDMS Rec |
Completed | 2006-01-06 | RBDMS Rec |
Reached Total Depth | 2006-01-06 | RBDMS Rec |
Completion Report Received | 2006-06-12 | RBDMS Rec |
Construction Permit Expires | 2006-12-29 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-08-25 | 3282 | 3337 | 52 |
3282 | 3337 | 52 | |
3282 | 3337 | 52 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2200 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 0 |
2006 | HARLEY DRILLING & PRODUCING LT | 1834.00 | 177.00 | 365 |
2007 | HARLEY DRILLING & PRODUCING LT | 2465.00 | 177.00 | 365 |
2008 | HARLEY DRILLING & PRODUCING LT | 2766.00 | 171.00 | 365 |
2009 | HARLEY DRILLING & PRODUCING LT | 2585.00 | 172.00 | 365 |
2010 | HARLEY DRILLING & PRODUCING LT | 2242.00 | 0.00 | 365 |
2011 | HARLEY DRILLING & PRODUCING LT | 2677.00 | 75.00 | 365 |
2012 | HARLEY DRILLING & PRODUCING LT | 1542.00 | 0.00 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | 846.00 | 85.00 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | 831.00 | 29.00 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | 796.00 | 0.00 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | 673.00 | 0.00 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 0 |
2006 | HARLEY DRILLING & PRODUCING LT | Brine | 40 | 365 |
2007 | HARLEY DRILLING & PRODUCING LT | Brine | 61 | 365 |
2008 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2009 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2010 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2011 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2012 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | Brine | 70 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | Brine | 10 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1620872884 | 2006-1-5 0:00:0 | DD | No Violations | 1.50 |
-1928766314 | 2015-12-31 0:00 | PW | No Violations | |
-341679456 | 2006-1-30 0:00: | PL | No Violations | 0.70 |
0105913747 | 2017-05-15 | Preliminary Restoration | No Violations | Inspected production well on 05/15/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0341679456 | 2006-01-30 | Preliminary Restoration | No Violations | Check on site and found that pits are closed but area needs graded and seeded. |
0439986046 | 2015-05-19 | Production Wells | No Violations | This pumping unit well has no evident issues at time of inspection. |
0586544482 | 2005-12-28 | Field Inspected, Well Not Found | No Violations | Met with Mark Beitzel on rush permit for location construction and pits.Next Contact Columbus and talk with Permitting on info for permit. |
105913747 | 2017-5-15 0:00: | PL | No Violations | |
1099013192 | 2006-08-14 | Preliminary Restoration | No Violations | Meets requirements for P. restoration. |
1141822437 | 2006-01-04 | Drill / Deepen / Reopen | No Violations | Capstar Drilling set 860 ft. of 85/8 casing c/w 280 sks.Also met with operator on site to review permit requirements. |
1539756314 | 2017-05-15 | Production Wells | No Violations | Inspected production well on 05/15/2017. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, and 1-compressor (shared), located within an earthen dike; the diked area is shared with the tank batteries for the Chittenden #H-2 and Chittenden-Carson #H-1 wells (PN: 169-25482/25306). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1620872884 | 2006-01-05 | Drill / Deepen / Reopen | No Violations | Check on Capstar rig and found rig at 3065ft. Fell down doghouse stairs,dumb???? Hurts just the same. |
1790944855 | 2006-03-22 | Preliminary Restoration | No Violations | Pits are closed area needs graded and seeded. |
1928766314 | 2015-12-31 | Production Wells | No Violations | Inspected production well on 12/31/2015; the tank battery was inspected previously on 12/23/2015. The tank battery consists of 3-210 bbl steel tanks, 1-100 bbl steel tank, 1-2,500 gal plastic tank, 3-vertical separators, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
439986046 | 2015-5-19 0:00: | PW | No Violations | 0.50 |
586544482 | 2005-12-28 0:00 | NF | No Violations | 3.00 |
For data sources see[9]