X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25567

Well Details

Well ID: 34-169-25567
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: BUCHHOLZ MICHAEL ETAL
License Status: Producing
License Date: 2007-04-17
Spud Date: 2008-01-05
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2008-01-07
Well Total Depth: 3363.00 ft
Configuration: Vertical
Latitude: 40.880000
Longitude: -81.990000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-04-17 Proposed Formations:CLINTON, Issued Date:4/17/2007, Expired Date:4/16/2008 6:00:00 AM, Drilling unit acres:351.16, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-01-07
Construction Permit Expires 2008-04-16
Completion Report Received 2008-05-14
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-09-03 3182 3250 137
3182 3250 137
3182 3250 137

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 314000 Mscf 32500

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 HARLEY DRILLING & PRODUCING LT 778.00 0.00 215
2009 HARLEY DRILLING & PRODUCING LT 1481.00 175.00 365
2010 HARLEY DRILLING & PRODUCING LT 832.00 175.00 365
2011 HARLEY DRILLING & PRODUCING LT 836.00 0.00 365
2012 HARLEY DRILLING & PRODUCING LT 878.00 175.00 366
2013 HARLEY DRILLING & PRODUCING LT 627.00 177.00 365
2014 HARLEY DRILLING & PRODUCING LT 65.00 143.00 365
2015 HARLEY DRILLING & PRODUCING LT 270.00 0.00 365
2016 HARLEY DRILLING & PRODUCING LT 373.00 169.00 365
2017 HARLEY DRILLING & PRODUCING LT 317.00 50.00 365
2018 HARLEY DRILLING & PRODUCING LT 318.00 76.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 HARLEY DRILLING & PRODUCING LT Brine 0 215
2009 HARLEY DRILLING & PRODUCING LT Brine 75 365
2010 HARLEY DRILLING & PRODUCING LT Brine 0 365
2011 HARLEY DRILLING & PRODUCING LT Brine 30 365
2012 HARLEY DRILLING & PRODUCING LT Brine 0 366
2013 HARLEY DRILLING & PRODUCING LT Brine 20 365
2014 HARLEY DRILLING & PRODUCING LT Brine 0 365
2015 HARLEY DRILLING & PRODUCING LT Brine 0 365
2016 HARLEY DRILLING & PRODUCING LT Brine 0 365
2017 HARLEY DRILLING & PRODUCING LT Brine 0 365
2018 HARLEY DRILLING & PRODUCING LT Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1027303911 2020-4-8 0:00:0 PW No Violations
-1132730178 2013-9-30 0:00: PW No Violations 0.50
-1165476935 2018-3-7 0:00:0 PW No Violations
-1461109922 2012-11-30 0:00 PW No Violations
-1533529909 2008-1-3 0:00:0 DD No Violations 1.50
-289921869 2015-1-2 0:00:0 PW No Violations 0.50
-313914409 2008-1-4 0:00:0 DD No Violations 5.00
-572615631 2016-10-19 0:00 PW No Violations
-796650850 2016-10-19 0:00 PL No Violations
0059282267 2017-02-01 Preliminary Restoration No Violations Inspected production well on 02/01/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
0289921869 2015-01-02 Production Wells No Violations This pumping unit well has no evident problems at this time.
0313914409 2008-01-04 Drill / Deepen / Reopen No Violations Maric Drilling set 810 ft. of 8 5/8 casing c/w 310 sks Petroset - Rich - 11 inch hole to 874 ft
0340676652 2015-11-17 Production Wells No Violations Inspected production well on 11/17/2015. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-50 bbl steel tank, 2-vertical separators, and 1-compressor located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
0572615631 2016-10-19 Production Wells No Violations Inspected production well on 10/19/2016. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank (shared with the Mae Franks #4 well; PN: 169-24170), 1-vertical separator, and 1-compressor (shared with the Mae Franks #4 well; PN: 169-24170), located within an earthen dike. The diked area is shared with the production equipment for the Mae Franks #4 well (PN: 169-24170). No well identification is posted at the tank battery. Jason Klauss with Harley Drilling was notified of this issue and will have it addressed promptly. The well is equipped with a pump jack with an electric motor. No other problems were noted at the time of the inspection.
0796650850 2016-10-19 Preliminary Restoration No Violations Inspected production well on 10/19/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
0848118530 2017-02-01 Production Wells No Violations Inspected production well on 02/01/2017. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, 1-vertical separator, and 1-compressor, located within an earthen dike; the 50 bbl steel tank and compressor are shared with the Mae Franks #4 well (PN: 169-24170). The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. No well identification is posted at either the tank battery or the wellhead. Jason Klauss with Harley Drilling was notified of this issue and will addres it promptly. No other problems were noted at the time of the inspection.
1132730178 2013-09-30 Production Wells No Violations This producing pumping unit well has no apparent problems at time of inspection.
1165476935 2018-03-07 Production Wells No Violations Inspected production well on 03/07/2018. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank (shared), 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike; the diked area and noted equipment are shared with the Mae Franks #4 well (PN: 169-24170). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at the wellhead. No problems were noted at the time of the inspection.
1461109922 2012-11-30 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
1509637369 2008-03-24 Drill / Deepen / Reopen No Violations Pits pumped down but not closed .Well in process of being completed.
1533529909 2008-01-03 Drill / Deepen / Reopen No Violations Maric Drilling at 231 ft. on 11 hole.
1729255023 2008-04-03 Preliminary Restoration No Violations Pits closed and area somewhat graded.Needs more grading and seeded before restoration can be passed.
340676652 2015-11-17 0:00 PW No Violations
59282267 2017-2-1 0:00:0 PL No Violations
848118530 2017-2-1 0:00:0 PW No Violations

For data sources see[9]

References