X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25573

Well Details

Well ID: 34-169-25573
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Plain Township
Operator Name: KENOIL LLC
Well Pad ID:
Farm/Lease Name: BOWER UNIT
License Status: Final Restoration
License Date: 2007-07-05
Spud Date: 2007-07-22
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2007-07-30
Well Total Depth: 5515.00 ft
Configuration: Vertical
Latitude: 40.780000
Longitude: -82.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-07-05 Proposed Formations:CLINTON THRU TREMPEALEAU, Issued Date:7/5/2007, Expired Date:7/4/2008 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Completed 2007-07-30
Plugged/Abandoned 2007-07-30
Reached Total Depth 2007-07-30
Completion Report Received 2007-10-10
Construction Permit Expires 2008-07-04
Record Last Modified 2013-03-14

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1068712776 2007-10-18 0:00 FR No Violations 0.70
-1786917384 2007-7-30 0:00: DD No Violations 1.50
-1799076634 2007-7-31 0:00: DD No Violations 1.50
-198572903 2007-7-30 0:00: DD No Violations 5.70
-31523884 2007-7-23 0:00: DD No Violations 4.50
0031523884 2007-07-23 Drill / Deepen / Reopen No Violations Capstar Drilling set 945 ft 8 5/8 casing c/w 320 sks. - Petroset - Rich - 11 inch hole to 977 ft. 80 f.t of 12 1/4 conductor
0198572903 2007-07-30 Drill / Deepen / Reopen No Violations Plug dry hole to surface today with Petroset - John
0207530495 2007-07-23 Drill / Deepen / Reopen No Violations Capstar is at 905 ft. on surface hole and should be ready tonight .
1068712776 2007-10-18 Final Restoration No Violations Meets requirements for restoration final.
1786917384 2007-07-30 Drill / Deepen / Reopen No Violations Capstar Drilling has dry hole and schedule plug for later today .
1799076634 2007-07-31 Drill / Deepen / Reopen No Violations Check plug after plugging to surface on Monday and found cement at 3 ft. and no leaks.Check on rig which is moving today also.
1874095543 2007-07-26 Drill / Deepen / Reopen No Violations Capstar Drilling at 2800 ft. soaping on 7 7/8 hole .
207530495 2007-7-23 0:00: DD No Violations 1.50

For data sources see[3]

References