If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25597 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.82,"lon":-81.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: DERBY OPERATING CORP | |
Well Pad ID: | |
Farm/Lease Name: VARNS D | |
License Status: Producing | |
License Date: 2008-06-03 | |
Spud Date: 2008-07-23 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2008-08-02 | |
Well Total Depth: 5478.00 ft | |
Configuration: Vertical | |
Latitude: 40.820000 | |
Longitude: -81.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-06-03 | Proposed Formations:TREMPEALEAU, Issued Date:6/3/2008, Expired Date:6/3/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-08-02 | |
Completion Report Received | 2008-11-20 | |
Construction Permit Expires | 2009-06-03 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 | NOT PERFED OR TREATED; PRODUCED NATURAL OPEN HOLE… NO RESERVOIR PRESSURE REPORTED… GM |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | DERBY OPERATING CORP | 13963.00 | 1982.00 | 142 |
2009 | DERBY OPERATING CORP | 36797.00 | 3965.00 | 365 |
2010 | DERBY OPERATING CORP | 32054.00 | 2810.00 | 365 |
2011 | DERBY OPERATING CORP | 31560.00 | 2337.00 | 365 |
2012 | DERBY OPERATING CORP | 28865.00 | 2032.00 | 366 |
2013 | DERBY OPERATING CORP | 17774.00 | 1592.00 | 365 |
2014 | DERBY OPERATING CORP | 15360.00 | 1541.00 | 365 |
2015 | DERBY OPERATING CORP | 5873.00 | 1730.00 | 365 |
2016 | DERBY OPERATING CORP | 9509.00 | 2099.00 | 365 |
2017 | DERBY OPERATING CORP | 8968.00 | 1467.00 | 365 |
2018 | DERBY OPERATING CORP | 7404.00 | 1375.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | DERBY OPERATING CORP | Brine | 0 | 142 |
2009 | DERBY OPERATING CORP | Brine | 0 | 365 |
2010 | DERBY OPERATING CORP | Brine | 0 | 365 |
2011 | DERBY OPERATING CORP | Brine | 0 | 365 |
2012 | DERBY OPERATING CORP | Brine | 0 | 366 |
2013 | DERBY OPERATING CORP | Brine | 0 | 365 |
2014 | DERBY OPERATING CORP | Brine | 0 | 365 |
2015 | DERBY OPERATING CORP | Brine | 0 | 365 |
2016 | DERBY OPERATING CORP | Brine | 0 | 365 |
2017 | DERBY OPERATING CORP | Brine | 0 | 365 |
2018 | DERBY OPERATING CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1133262696 | 2017-1-13 0:00: | PW | No Violations | |
-1259591761 | 2008-8-11 0:00: | CT | No Violations | 0.70 |
-1525455074 | 2008-8-25 0:00: | PL | No Violations | 1.00 |
-1659284836 | 2008-7-24 0:00: | DD | No Violations | 1.50 |
-22631359 | 2018-2-8 0:00:0 | PW | No Violations | |
-251270419 | 2016-7-28 0:00: | PW | No Violations | |
-252678019 | 2020-4-15 0:00: | PW | No Violations | |
-267356886 | 2019-7-16 0:00: | PW | No Violations | |
-454553692 | 2013-7-3 0:00:0 | PW | No Violations | 0.50 |
-908790199 | 2008-7-25 0:00: | DD | No Violations | 6.00 |
-956748057 | 2015-10-26 0:00 | PW | No Violations | |
0022631359 | 2018-02-08 | Production Wells | No Violations | Inspected production well on 02/08/2018. The tank battery consists of 4-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, 1-drip, 1-meter, and 1-meter box, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0251270419 | 2016-07-28 | Production Wells | No Violations | Inspected production well on 07/28/2016. The tank battery consists of 4-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0430809260 | 2014-10-16 | Production Wells | No Violations | This is a pumping unit well There are no apparent problems or violations at time of inspection. |
0454553692 | 2013-07-03 | Production Wells | No Violations | This is a plunger lift well. No apparent problems at this time. |
0554623562 | 2008-07-30 | Drill / Deepen / Reopen | No Violations | Maric Drilling is at 4200 ft on 7 7/8 hole soaping.Pit level and liner good. |
0908790199 | 2008-07-25 | Drill / Deepen / Reopen | No Violations | Maric Drilling set 761 ft. of 8 5/8 casing c/w 235 sks - Petroset - Rich |
0956748057 | 2015-10-26 | Production Wells | No Violations | Inspected production well on 10/26/2015. The tank battery consists of 4-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1133262696 | 2017-01-13 | Production Wells | No Violations | Inspected production well on 01/13/2017. The tank battery consists of 4-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1232024981 | 2008-07-28 | Drill / Deepen / Reopen | No Violations | Maric Drilling at 2850 ft. on 7 7/8 hole soaping.Pit level and liner good. |
1259591761 | 2008-08-11 | Completion Testing | No Violations | Service rig over well today for completion.Pit level and liner are good. |
1418908345 | 2017-01-13 | Preliminary Restoration | No Violations | Inspected production well on 01/13/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1525455074 | 2008-08-25 | Preliminary Restoration | No Violations | Close pits on this well today and area graded.Needs seeded and vegetation established before Primary restoration can be passed. |
1659284836 | 2008-07-24 | Drill / Deepen / Reopen | No Violations | Maric Drilling at 114 ft on 11 inch surface hole. |
1809995773 | 2008-08-06 | Completion Testing | No Violations | Bishop Well has rig over well today for completion. |
430809260 | 2014-10-16 0:00 | PW | No Violations | 0.50 |
554623562 | 2008-7-30 0:00: | DD | No Violations | 1.50 |
For data sources see[8]