X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25614

Well Details

Well ID: 34-169-25614
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: JENTES BOB
License Status: Producing
License Date: 2008-08-06
Spud Date: 2008-11-18
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2008-11-26
Well Total Depth: 5620.00 ft
Configuration: Vertical
Latitude: 40.880000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-08-06 Proposed Formations:TREMPEALEAU, Issued Date:8/6/2008, Expired Date:8/6/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-11-26
Construction Permit Expires 2009-08-06
Completion Report Received 2009-11-03
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-01-11 5558 5568 21
5558 5568 21
5558 5568 21

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 150 Gal 0 TREATMENT PRESSURE NOT REPORTED

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 HARLEY DRILLING & PRODUCING LT 840.00 99.00 365
2010 HARLEY DRILLING & PRODUCING LT 4527.00 1345.00 365
2011 HARLEY DRILLING & PRODUCING LT 3027.00 968.00 365
2012 HARLEY DRILLING & PRODUCING LT 2565.00 833.00 366
2013 HARLEY DRILLING & PRODUCING LT 1766.00 499.00 365
2014 HARLEY DRILLING & PRODUCING LT 1014.00 336.00 365
2015 HARLEY DRILLING & PRODUCING LT 772.00 346.00 365
2016 HARLEY DRILLING & PRODUCING LT 598.00 169.00 365
2017 HARLEY DRILLING & PRODUCING LT 710.00 451.00 365
2018 HARLEY DRILLING & PRODUCING LT 206.00 133.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 HARLEY DRILLING & PRODUCING LT Brine 470 365
2010 HARLEY DRILLING & PRODUCING LT Brine 2947 365
2011 HARLEY DRILLING & PRODUCING LT Brine 2040 365
2012 HARLEY DRILLING & PRODUCING LT Brine 2022 366
2013 HARLEY DRILLING & PRODUCING LT Brine 545 365
2014 HARLEY DRILLING & PRODUCING LT Brine 985 365
2015 HARLEY DRILLING & PRODUCING LT Brine 1475 365
2016 HARLEY DRILLING & PRODUCING LT Brine 1238 365
2017 HARLEY DRILLING & PRODUCING LT Brine 1225 365
2018 HARLEY DRILLING & PRODUCING LT Brine 1075 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1040080037 2008-11-20 0:00 DD No Violations 1.50
-1174119858 2013-4-3 0:00:0 PL No Violations 0.50
-1194048255 2008-11-21 0:00 DD No Violations 1.50
-1321088164 2015-12-31 0:00 PW No Violations
-1503107006 2008-11-17 0:00 DD No Violations 2.00
-1927930221 2008-11-25 0:00 DD No Violations 1.50
-2110336594 2018-3-13 0:00: PW No Violations
-212679506 2008-12-1 0:00: DD No Violations 1.00
-521769104 2020-9-30 0:00: PW No Violations
-611532197 2017-5-15 0:00: PW No Violations
0119518438 2014-12-19 Production Wells No Violations This is a pumping unit well. There are no apparent problems at this time.
0144855104 2008-11-18 Drill / Deepen / Reopen No Violations Maric Drilling is at 465 ft on surface hole and should be ready tonight .Pit liners and level are both good.
0212679506 2008-12-01 Drill / Deepen / Reopen No Violations Rig has moved well not yet in production.Check pit level and liners and both are good.
0270708118 2008-11-19 Drill / Deepen / Reopen No Violations Maric Drilling set 850 ft of 8 5/8 casing c/w 350 sks - Petroset - Mark
0505146368 2017-05-15 Preliminary Restoration No Violations Inspected production well on 05/15/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes.
0611532197 2017-05-15 Production Wells No Violations Inspected production well on 05/15/2017. The tank battery consists of 2-210 bbl steel tanks and 2-100 bbl steel tanks, located within an earthen dike; 2-horizontal separators are located within a separate earthen dike nearby. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
1040080037 2008-11-20 Drill / Deepen / Reopen No Violations Maric Drilling at 1790 ft dusting on 7 7/8 hole.Pit level and liners are both good.
1174119858 2013-04-03 Preliminary Restoration No Violations Appears to be in compliance. Reclamation complete, legible signage in place.
1194048255 2008-11-21 Drill / Deepen / Reopen No Violations Maric Drilling at 2380 ft. on 7 7/8 hole.
119518438 2014-12-19 0:00 PW No Violations 0.50
1242434502 2008-11-26 Drill / Deepen / Reopen No Violations Maric Drilling 18 ft from t.d. finish well on fluid .All pit levels and liners are still in place.
1321088164 2015-12-31 Production Wells No Violations Inspected production well on 12/31/2015. The tank battery consists of 2-210 bbl steel tanks and 2-100 bbl steel tanks located within an earthen dike; 2-horizontal separators are located in a separate earthen dike nearby. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. No well identification is posted at the wellhead as required. Jim Vacha, Harley Drillings pumper, was notified of this issue and will address it promptly. No other problems were noted at the time of the inspection.
1423728127 2016-09-26 Production Wells No Violations Inspected production well on 09/26/2016. The tank battery consists of 2-210 bbl steel tanks and 2-100 bbl steel tanks, located within an earthen dike; 2-horizontal separators and 1-compressor are located within a separate earthen dike nearby. The tank battery is used by multiple wells (3); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
144855104 2008-11-18 0:00 DD No Violations 1.50
1503107006 2008-11-17 Drill / Deepen / Reopen No Violations Maric Drilling moving in today.Pits dug and lined.Had call about dirt on road and no signs on road.
1786985975 2013-06-26 Production Wells No Violations This producing pump jack well appears to have no problems at time of inspection.
1927930221 2008-11-25 Drill / Deepen / Reopen No Violations Maric Drilling at 5096 ft all safety equipment in place and pit level and liners are good.
2110336594 2018-03-13 Production Wells No Violations Inspected production well on 03/13/2018. The tank battery consists of 1-210 bbl steel tank and 1-100 bbl steel tank, located within an earthen dike; 1-horizontal separator with a drip and meter box are located within a separate earthen dike nearby. Both diked areas are shared with the tank battery for the Jentes #1 and #2 wells (PN: 169-25149/25177). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
270708118 2008-11-19 0:00 DD No Violations 4.50
505146368 2017-5-15 0:00: PL No Violations

For data sources see[9]

References