X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25664

Well Details

Well ID: 34-169-25664
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Wayne Township
Operator Name: CUTTER OIL LLC
Well Pad ID:
Farm/Lease Name: MAXWELL
License Status: Producing
License Date: 2011-07-19
Spud Date: 2011-07-29
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2011-08-03
Well Total Depth: 5587.00 ft
Configuration: Vertical
Latitude: 40.860000
Longitude: -81.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-07-19 Proposed Formations:OHIO SHALE THRU TREMPEALEAU, Issued Date:7/19/2011, Expired Date:7/18/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-08-03
Completion Report Received 2011-12-30
Construction Permit Expires 2013-07-18
Change of Owner 2013-09-03 Operator changed from 1249, CUTTER OIL CO to 9178, CUTTER OIL LLC
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-03-21 5440 5447 21
2012-03-21 5476 5499 69
5440 5447 21
5476 5499 69
5440 5447 21

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-09-30 H2O 15 37419 Gal 229000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 CUTTER OIL COMPANY 0.00 0.00 81
2012 CUTTER OIL COMPANY 15680.00 5876.00 366
2013 CUTTER OIL COMPANY 14441.00 3740.00 212
2014 CUTTER OIL LLC 426.00 158.00 22
2015 CUTTER OIL LLC 0.00 0.00 0
2016 CUTTER OIL LLC 0.00 0.00 0
2017 CUTTER OIL LLC 0.00 0.00 0
2018 CUTTER OIL LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 CUTTER OIL COMPANY Brine 1490 81
2012 CUTTER OIL COMPANY Brine 0 366
2013 CUTTER OIL COMPANY Brine 0 212
2014 CUTTER OIL LLC Brine 0 22
2015 CUTTER OIL LLC Brine 0 0
2016 CUTTER OIL LLC Brine 0 0
2017 CUTTER OIL LLC Brine 0 0
2018 CUTTER OIL LLC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1096454553 2012-11-30 0:00 PW No Violations
-1319822510 2017-1-13 0:00: PW No Violations
-587938190 2018-2-8 0:00:0 PW No Violations
0068669639 2016-07-14 Production Wells No Violations Inspected production well on 07/14/2016. The tank battery consists of 4-210 bbl steel tanks, 1-100 bbl steel tank, and 2-horizontal separators, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
0077113543 2015-11-19 Production Wells No Violations Inspected production well on 11/19/2015. The tank battery consists of 4-210 bbl steel tanks, 1-100 bbl steel tank, and 2-horizontal separators located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection.
0271134629 2011-08-29 Preliminary Restoration No Violations Pits are closed and area graded but not seeded.
0587938190 2018-02-08 Production Wells No Violations Inspected production well on 02/08/2018. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank (shared), and 1-horizontal separator with a drip and meter box, located within an earthen dike (shared). The 100 bbl steel tank and diked area are shared with the Maxwell #5 well (PN: 169-25217). The well is equipped with a pump jack with an electric motor; the wellhead is located within a small earthen dike. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0760237509 2011-08-08 Preliminary Restoration No Violations Pits are closed. Area graded but not seeded. Rig has moved.
0955584840 2018-11-14 Production Wells No Violations Inspected production well on 11/14/2018. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank (shared), and 1-horizontal separator with a drip and meter box, located within an earthen dike; the diked area and noted equipment are shared with the tank battery for the Maxwell #5 well (PN: 169-25217). The well is equipped with a pump jack with an electric motor; the wellhead is located within a small earthen dike. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0978431078 2011-08-01 Drill / Deepen / Reopen No Violations Wildcat Drilling set 836 ft of 8 5/8 casing. Cemented with 350 sks. Wildcat is at 3376 ft and soaping on 7 7/8 hole.
1096454553 2012-11-30 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
1173119063 2019-7-16 0:00: PW No Violations
1319822510 2017-01-13 Production Wells No Violations Inspected production well on 01/13/2017. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank (shared with the Maxwell #5 well; PN: 169-25217), and 1-horizontal separator, located within an earthen dike; the diked area is shared with the tank battery for the Maxwell #5 well (PN: 169-25217). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1560377707 2017-01-13 Preliminary Restoration No Violations Inspected production well on 01/13/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
1658767352 2014-07-14 Production Wells No Violations This is a pumping unit well. No apparent problems at time of inspection.
1707850294 2011-08-04 Drill / Deepen / Reopen No Violations Rig has finished drilling but will not be moving today. Pit level and liners are good .
1926478004 2011-08-29 Preliminary Restoration No Violations Pits are closed and area is graded but not seeded. There is a topsoil pile which remains and needs spread before restoration can be passed.
1933291758 2012-03-13 Preliminary Restoration No Violations Meets requirements for Preliminary Restoration.
271134629 2011-8-29 0:00: PL No Violations 0.50
635516799 2020-4-8 0:00:0 PW No Violations
68669639 2016-7-14 0:00: PW No Violations
760237509 2011-8-8 0:00:0 PL No Violations 0.70
77113543 2015-11-19 0:00 PW No Violations
955584840 2018-11-14 0:00 PW No Violations
978431078 2011-8-1 0:00:0 DD No Violations 1.50

For data sources see[9]

References