X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25687

Well Details

Well ID: 34-169-25687
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Milton Township
Operator Name: MORTON SALT INC
Well Pad ID:
Farm/Lease Name: MORTON SALT (SMP #5)
License Status: Well Drilled
License Date: 2016-12-22
Spud Date: 2016-12-27
Spud Drilling Contractor: H A D INC
Final Drill Date: 2017-01-10
Well Total Depth: 5050.00 ft
Configuration: Horizontal
Latitude: 40.950000
Longitude: -81.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-22 Proposed Formations:SALINA, Issued Date:12/22/2016, Expired Date:12/22/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2017-01-10
Completion Report Received 2017-02-10
Record Last Modified 2017-10-23
Construction Permit Expires 2018-12-22

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-124530390 2020-1-24 0:00: SM No Violations 0.30
-1686339305 2019-5-2 0:00:0 SM No Violations 0.20
-1824479450 2018-8-30 0:00: SM No Violations 0.30
-1834357181 2016-12-29 0:00 CS No Violations
-1866203405 2017-1-3 0:00:0 DD No Violations
-237534582 2016-12-28 0:00 CS No Violations
-417640496 2017-11-30 0:00 SM No Violations 0.30
-557141684 2017-1-9 0:00:0 DD No Violations
-634726920 2017-2-6 0:00:0 CS No Violations
-951967048 2016-12-30 0:00 CS No Violations
0237534582 2016-12-28 Casing String Witnessed No Violations Visited location on 12/27/2016 to witness the conductor casing cement job at the Morton Salt #62 well; the cement job extended from 12/27/2016-12/28/2016. A 24 hole was drilled to 130, and 118 of 18 conductor casing was run downhole. Rigged up Petroset, broke circulation, and pumped and displaced cement to surface. Good cement was seen at surface, and there were approximately 18 bbls of cement returns. Rigged down Petroset. Will wait on cement 8 hours prior to drilling out.
0372332631 2017-01-05 Casing String Witnessed No Violations Arrived on location on 01/05/2017 to witness the long string cement job at the Morton Salt #62 well. The curve was landed at 3,088 and 9 5/8 casing ran to 3,051. For the first 21 joints, centralizers were ran every 3 joints, and then every 5 for the remaining joints. Rigged up Petroset. Broke circulation with freshwater, then began pumping cement. Dropped plug and continued pumping. Plug landed at 9:00 PM. No cement was returned to surface. Pressured well up to 1,100# at 9:03 PM for 15 minute MIT. At 9:18 PM, the pressure remained at 1,100#. Long string MIT passed. As a bond log is required after drilling, the decision was made to finish drilling the lateral, and then determine a plan forward after logging the well and determining the top of the long string cement. Rigged down, moved out Petroset. Will wait 20 hours for cement to set up, and then will resume drilling operations.
0394356430 2017-01-05 Drill / Deepen / Reopen No Violations Visited location on 01/05/2017 to check on the status of operations at the Morton Salt #62 well. HAD Rig #249 had landed the curve at 3,088, tripped out of the hole and laid down the directional BHA, and were waiting on tongs.
0417640496 2017-11-30 Solution Mining Project No Violations I observed no spills or leaks. There is a structure covering the well. There are no violations at this time.
0557141684 2017-01-09 Drill / Deepen / Reopen No Violations Arrived on location on 01/09/2017 to witness the logging job at the Morton Salt #62 well. Cement was noted from curve landing to somewhere above 70 (the pressure was too low up hole for the tools to be effective any further). Will run 1 joint of 1 tubing and grout the annulus after tubing is run and the rig has moved out.
0634726920 2017-02-06 Casing String Witnessed No Violations Arrived on location on 02/06/2017 to witness the grout job on the Morton Salt #62 long string. Rigged up Petroset and J-Hawk water hauling. Ran several joints of 2 plastic tubing down hole until it sat down. Pumped fresh water ahead to circulate water out of the annulus, then grouted the annular space to surface. Good cement was seen at surface. Rigged down, moved out Petroset and J-Hawk.
0903337326 2017-01-20 Casing String Witnessed No Violations Arrived on location on 01/20/2017 to witness the topping off of the long string annulus with cement. Waited on Petroset. After scouting out the lease road upon Petrosets arrival, it was determined that lease road conditions were too poor to attempt to move in the cement trucks without a dozer. The job will be postponed until either the weather or lease road conditions improve.
0951967048 2016-12-30 Casing String Witnessed No Violations Visited location on 12/30/2016 to witness the surface casing MIT at the Morton Salt #62 well. Pressured well up to 550# at 7:47 AM. After waiting 15 minutes, the pressure was at 530# at 8:02 AM. Surface casing MIT passed.
1018610509 2016-12-27 Drill / Deepen / Reopen No Violations Visited location on 12/27/2016 to check on the status of operations at the Morton Salt #62 well. HAD Rig #249 was drilling ahead at ~59.
1732393927 2016-12-22 Administrative Inspection No Violations Visited location on 12/22/2016 at the request of Andrew Adgate to evaluate the earthen sound barrier mound constructed along the eastern edge of the location. The mound is approximately 12-15 high, extending north-south along the entire eastern edge of the location, approximately 500 from the homes located to the east. Photos were also taken and provided to Andrew for his evalutation also. It was determined that the earthen mound is a sufficient sound barrier. Rig move in will proceed over the holiday weekend.
1824479450 2018-08-30 Solution Mining Project No Violations I found the injection well in good repair. There is a wooden structure over the well. I observed no leaks or spills.
1834357181 2016-12-29 Casing String Witnessed No Violations Visited location on 12/29/2016 to witness the surface casing cement job at the Morton Salt #62 well. A 17 1/2 hole was drilled to 601, and 597 of 13.625 surface casing was run downhole with 4 centralizers. Rigged up Petroset, broke circulation, and pumped and displaced cement to surface. Good cement was seen at surface, and there were approximately 39 bbls of cement returns. Rigged down Petroset. Will wait on cement 8 hours prior to pressure testing and drilling out.
1866203405 2017-01-03 Drill / Deepen / Reopen No Violations Visited location on 01/03/2017 to check on the status of operations at the Morton Salt #62 well. HAD Rig #249 was drilling ahead in the curve at 2,802.
1887179992 2017-06-15 Preliminary Restoration No Violations Visited location on 06/15/2017 with UIC Geologist Dominique Haneberg-Diggs to approve the preliminary restoration for the well. All drilling equipment and debris have been removed, pits closed, and production lines laid to the well. Preliminary restoration passes.
372332631 2017-1-5 0:00:0 CS No Violations
394356430 2017-1-5 0:00:0 DD No Violations
514244341 2020-5-22 0:00: SM No Violations 0.30
903337326 2017-1-20 0:00: CS No Violations

For data sources see[3]

References