X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-01260

Well Details

Well ID: 37-003-01260
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Kennedy Township
Operator Name: UNKNOWN OPR
Well Pad ID:
Farm/Lease Name: RICHARD STREET
License Status: Abandoned
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.494222
Longitude: -80.105806

For data sources see[1][2][3]

Well History

Date Event
1901-01-01 Drilling Completion
2014-09-04 OLD WELL

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2428470 Primary Facility 2015-11-30 Plugging(Includes Plugged/Mined Through) No Adverse Event or Action Reported Wellhead consists of 8" casing swaged to 2 1/2" vent, ~8 feet high & venting gas. Well is scheduled to be plugged by Hydrocarbon Well Services. GPS'd well & revised location on file.
2432102 Primary Facility 2015-12-09 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon dozed road into well, prepared well site for rig.
2433804 Primary Facility 2015-12-16 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon finished rigging up, removed vent from wellhead, found well had 5 1/4" casing, 6 5/8" casing and 8 5/8" casing. Well is gassing from the 5 1/4" -- 6 5/8" annulus.
2434575 Primary Facility 2015-12-21 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon began pulling 5" casing, got 1st joint out.
2436207 Primary Facility 2015-12-28 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon preparing to top-off final cement plug. Spotted plug to surface last week, but cement level sank to ~130 feet before setting.
2436760 Primary Facility 2015-12-30 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule Hydrocarbon topped off plug to surface, set monument, graded, seeded and mulched location and access road.
2483551 Primary Facility 2016-04-19 Plugging(Includes Plugged/Mined Through) No Adverse Event or Action Reported Visited site to check identification plate, not installed yet. Talked to Hydrocarbon.
2495541 Primary Facility 2016-05-31 Plugging(Includes Plugged/Mined Through) No Adverse Event or Action Reported Visited site to check identification plate, still not installed. Talked to Hydrocarbon again.
2773898 Primary Facility 2018-08-31 Routine/Partial Inspection No Viols - Permanently Shut Down Met representative from First City Company to walk site and discuss plans for future development around plugged well. Hydrocarbon will need to construct a subsurface ID plate for this well.

This well was named the Sipe 4 ( with erroneous latitude and longitude) on the NOI to plug and Plugging Certificate. Sipe 4 and Richard Street 1 are the same well for future reference.

For data sources see[5]

References