If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-21994 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.657901,"lon":-79.781085,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Fawn Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 147046 | |
Farm/Lease Name: FAWN DEVELOPERS INC 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-11-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.657901 | |
Longitude: -79.781085 |
Date | Event |
---|---|
2008-11-21 | New Permit Application |
2008-12-05 | Performed Spud Operation |
2008-12-22 | Drilling Completion |
2009-01-22 | Perforation |
2010-02-18 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 248.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 60,336.00 | 243 | 0.00 | 59 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 36,465.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 28,097.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 33,862.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 25,254.00 | 279 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 29,535.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 47,119.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 51,933.80 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 31,740.00 | 279 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 24,225.00 | 296 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 4,868.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,714.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,092.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 625.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 364.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 248.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 2,417.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2012 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | XTO ENERGY INC | Produced Fluid | 229.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 690.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 123.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Produced Fluid | 114.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2013 | XTO ENERGY INC | Produced Fluid | 199.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 380.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 796.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 380.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 1,511.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 1,052.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 95.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 1,056.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 894.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | 945.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 | |
2017 | XTO ENERGY INC | Produced Fluid | 1,410.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 996.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Servicing Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 103.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 254.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 5.15 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 798.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1765919 | Primary Facility | 2009-01-29 | Routine/Complete Inspection | No Violations Noted | Well drilled, not equipped. No issues at site. |
1785044 | Primary Facility | 2009-04-16 | Complaint Inspection | Violation(s) Noted | |
1800142 | Primary Facility | 2009-05-08 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
1808534 | Primary Facility | 2009-06-19 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Met onsite with operator representative Dan Rice. large above grade onsite pit was empty at the time of the inspection. The runoff collection ditch and subsequent sediment basin implemented onsite required maintenance after the most recent rain/storm event. Agreed that the following actions should be taken: 1)The exposed hillsides should be temporarily seeded & mulched, 2) The ditches should be stabilized with rock, 3) The sediment basin should have a portion of the deposited sedimented pulled out so as to insure that the basin continues to function properly, and 4) The sediment basin outlet should be re-rocked to insure it continues to function properly. Mr. Rice stated that these actions will be undertaken as soon as possible. |
1851521 | Primary Facility | 2009-12-02 | Drilling/Alteration | No Violations Noted | COMPLETE AND ON LINE. SITE NOT RESTORED. |
1865636 | Primary Facility | 2010-02-24 | Drilling/Alteration | No Violations Noted | WELL HEAD EQUIPTMENT INSTALLED. TANKS ON SITE. ACCESS STONED. |
1879868 | Primary Facility | 2010-04-22 | Routine/Complete Inspection | No Violations Noted | On April 22, 2010 I visited this site as a routine inspection. Drilling was completed 12/22/2008. The well site appeared to be in compliance. A well tag was present. The access road was in good condition. The site was partially restored; the frac pit was still in use to provide service for wells 3H and 4H. There was no evidence of spills or leaks around the tanks and no accelerated erosion was observed at the time of inspection. Some excess material (pallets, bags of cement etc) was being stored on site and should be removed soon. The operator should contiune to inspect the E&S controls routinely and after each runoff event until the site is fully restored |
1882737 | Primary Facility | 2010-04-05 | Routine/Complete Inspection | No Violations Noted | THIS MARCELLUS WELL IS COMPLETE AND ON LINE. SITE IS STONED, AND E&S, OK. |
1894365 | Primary Facility | 2010-06-23 | Routine/Complete Inspection | No Violations Noted | On June 23rd, 2010 I visited this site as a routine inspection. Drilling was completed 12/22/2008. The well site appeared to be in compliance. A well tag was present. The access road was in good condition. There was no evidence of spills or leaks. Some accelerated erosion was beginning along the fill slope. At this time no sediment was leaving site as it was contained by the interceptor channel at the toe of the slope. The operator should contiune to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored. |
1904647 | Primary Facility | 2010-07-21 | Routine/Complete Inspection | No Violations Noted | On July 21st, 2010 I visited this site as a routine inspection. Drilling was completed 12/22/2008. A well tag was present. The access road was in good condition. There was no evidence of spills or leaks. More rock was brought onto the pad and some effort was made to slow the erosion on the fill slope. At this time no sediment was leaving site as it was contained by the interceptor channel at the toe of the slope. The operator should contiune to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored. |
1913786 | Primary Facility | 2010-09-02 | Routine/Complete Inspection | No Violations Noted | On September 2nd, 2010 I visited this site as a routine inspection. Drilling was completed 12/22/2008. A well tag was present. The access road was in good condition. There was no evidence of spills or leaks. Site restoration was beginning to take place. The interceptor channels had been repaired and lined with straw mat. The impoundment had been filled and closed. The site was graded but not yet seeded or mulched. The operator should contiune to inspect and maintain the E&S controls routinely and after each runoff event until the site is fully restored. |
1930584 | Primary Facility | 2010-11-10 | Routine/Complete Inspection | No Violations Noted | THIS MARCELLUS WELL IS PROTECTED BY A FENCE MADE OF PIPE. HEATER IS FENCED SEPERATLY. TANKS ARE ALSO FENCED. |
1993486 | Primary Facility | 2011-07-26 | Routine/Complete Inspection | No Violations Noted | On July 26th, 2011 I visited this site as a routine inspection. Drilling was completed 12/22/2008. The well was in production. A well tag was present. The access road was in good condition. There was no evidence of spills or leaks. The site was restored. 3 tanks were on site. |
2102502 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | John Ley , WQS, SWRO was on site to conduct a routine inspection. There was a security gate located at the entrance to the access road and fencing surrounding the well pad. At the time of the inspection, the well sign, well ID tag and inspections copies were on site. |
2728868 | Primary Facility | 2018-05-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production.
There does not appear to be an ESCGP associated with this location. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1785044 | 561139 | 04/16/2009 | 2009-04-16 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1785044 | 561140 | 04/16/2009 | 2009-04-16 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
561139 | 245137 | NOV - Notice of Violation | Comply/Closed | 2009-07-21 | |||
561140 | 245137 | NOV - Notice of Violation | Comply/Closed | 2009-07-21 |
For data sources see[7]