X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22303

Well Details

Well ID: 37-003-22303
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Findlay Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 151012
Farm/Lease Name: ACAA 1JUD
License Status:
Spud Date:
Permit Date: 2014-06-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.473072
Longitude: -80.254828

For data sources see[1][2][3]

Well History

Date Event
2014-06-18 New Permit Application
2014-09-16 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-02 2016-12-11 5,728 11,756,500

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Quaternary ammonium compound 68424-85-1 2.5 0.00022 250
Ammonium acetate 631-61-8 13 0.00769 8890
Methanol 67-56-1 5 0.00002000 23
Hydrochloric acid 7647-01-0 7.5 0.1035 119703
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00296 3419
Distillate, petroleum, hydrotreated, light 64742-47-8 25 0.00036 418
Diethylenetriaminepenta(methylenephosphonic) acid 15827-60-8 5 0.00046 535
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00046 535
Petroleum distallate hydrotreated light 64742-47-8 30 0.01774 20516
Alcohols, (C10-16), ethoxylated 68002-97-1 3.6 0.00005000 60
Alcohols, (C10-16), ethoxylated 68002-97-1 50 0.0002 229
Ethanol 64-17-5 0.3 0.00003000 250
1,4-Dioxane-2,5-dione, 3,6-dimethyl-,(3R-cis)-,polymer
with
(3S-cis)-3,6-dimethyl-1,4-dioxane-2,5-dione
and trans-3,6-dimethyl-1,4-dioxane-2,5-dione
9051-89-2 98 0.00631 7301
Glutaraldehyde 111-30-8 14 0.00121 1400
Butoxydiglycol 112-34-5 75 0.0003 343
Alcohols, C12-14, ethoxylated 68439-50-9 5 0.00296 3419
Ammonium acetate 631-61-8 10 0.00014 167
Alcohols, C12-16, ethoxylated 68551-12-2 3.6 0.00005000 60
Thiourea 62-56-6 1 0 5
Alcohols, (C10-16), ethoxylated 68002-97-1 5 0.00296 3419
Formaldehyde 50-00-0 1 0 5
Water 7732-18-5 83 0.00718 8301
Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00185 2141
Crystalline silica quartz 14808-60-7 99.9 13.6955 15,840,000.0
Alcohols, C12-14, ethoxylated 68439-50-9 3.6 0.00005000 60
Scale Inhibitor E UWS Scale Inhibitor Listed Below
Unihib G UWS Acid Inhibitor Listed Below
ECM 7000 ECM Friction Reducer Listed Below
Sand UWS Proppant Listed Below
Sureverter UWS Diverting Agent Listed Below
Water Consol Carrier/Base Fluid Fresh 7732-18-5 84.8255
Aqucar 714 UWS Biocide Listed Below
HCL Acid (7.5%) UWS Acidizing Listed Below
Unislick ST50 UWS Friction Reducer Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2016 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2017 CNX GAS CO LLC 973,013.25 266 0.00 0 5,763.86 265
2018 CNX GAS CO LLC 763,562.42 340 0.00 0 1,797.77 337
2019 CNX GAS CO LLC 594,668.44 360 0.00 0 561.10 237

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CNX GAS CO LLC Drill Cuttings 211.65 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 750.69 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Drilling Fluid Waste 65.45 Bbl LANDFILL PAD059087072
2014 CNX GAS CO LLC Drill Cuttings 66.40 Tons LANDFILL 06-08438
2014 CNX GAS CO LLC Drilling Fluid Waste 311.32 Bbl LANDFILL 06-08438
2014 CNX GAS CO LLC Drill Cuttings 750.00 Tons LANDFILL 100620
2014 CNX GAS CO LLC Drill Cuttings 134.99 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 CNX GAS CO LLC Drill Cuttings 270.15 Tons LANDFILL PAD059087072
2015 CNX GAS CO LLC Drilling Fluid Waste 31.34 Bbl LANDFILL PAD059087072
2015 CNX GAS CO LLC Drill Cuttings 256.61 Tons LANDFILL 06-08438
2015 CNX GAS CO LLC Drilling Fluid Waste 693.20 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2015 CNX GAS CO LLC Drill Cuttings 556.86 Tons LANDFILL 100620
2016 CNX GAS CO LLC Produced Fluid 70.25 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CNX GAS CO LLC Produced Fluid 15.71 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2017 CNX GAS CO LLC Produced Fluid 547.94 Bbl INJECTION DISPOSAL WELL 34-119-28780
2017 CNX GAS CO LLC Drill Cuttings 37.03 Tons LANDFILL 06-3857
2017 CNX GAS CO LLC Produced Fluid 506.08 Bbl LANDFILL CID: 29084
2017 CNX GAS CO LLC Produced Fluid 426.25 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Synthetic Liner Materials 1.52 Tons LANDFILL 100172
2017 CNX GAS CO LLC Produced Fluid 2,255.72 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 2,385.14 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CNX GAS CO LLC 512.51 Bbl LANDFILL CID: 29084
2017 CNX GAS CO LLC Other Oil & Gas Wastes 93.71 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Other Oil & Gas Wastes 8.41 Tons LANDFILL CID: 29084
2017 CNX GAS CO LLC Drill Cuttings 44.57 Tons LANDFILL CID: 29084
2017 CNX GAS CO LLC Produced Fluid 797.42 Bbl LANDFILL 76-00-08
2017 CNX GAS CO LLC 37.03 Tons LANDFILL 06-3857
2017 CNX GAS CO LLC Produced Fluid 1,272.72 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Drill Cuttings 3.45 Tons LANDFILL CID: 38042
2017 CNX GAS CO LLC 818.49 Bbl LANDFILL 76-00-08
2017 CNX GAS CO LLC Produced Fluid 270.28 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Other Oil & Gas Wastes 55.29 Tons LANDFILL 76-00-08
2017 CNX GAS CO LLC Produced Fluid 1,484.29 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 42.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Other Oil & Gas Wastes 1.38 Tons LANDFILL UT2300249
2017 CNX GAS CO LLC Produced Fluid 62.86 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC 62,867.38 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017 CNX GAS CO LLC 0.69 Tons LANDFILL UT2300249
2017 CNX GAS CO LLC Drill Cuttings 3.02 Tons LANDFILL 76-00-08
2017 CNX GAS CO LLC Produced Fluid 76,366.37 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Produced Fluid 2.90 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Produced Fluid 8,442.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 349.00 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Produced Fluid 390.10 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Produced Fluid 199.42 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2018 CNX GAS CO LLC Other Oil & Gas Wastes 40.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 657.34 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Produced Fluid 4,899.76 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 62,793.46 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 2,089.88 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 CNX GAS CO LLC Produced Fluid 1,273.72 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 10.71 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018 CNX GAS CO LLC Produced Fluid 14.29 Bbl INJECTION DISPOSAL WELL 34-059-24202
2019 CNX GAS CO LLC Produced Fluid 5,088.42 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 38.50 Bbl INJECTION DISPOSAL WELL 34-119-28780
2019 CNX GAS CO LLC Produced Fluid 704.11 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Produced Fluid 1.25 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 25,909.45 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 122.63 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2019 CNX GAS CO LLC Produced Fluid 2,510.51 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 646.88 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 471.63 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 1,278.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Produced Fluid 3,715.14 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 206.25 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 6,298.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 10.63 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2303208 Primary Facility 2014-08-19 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58, Ch 32 § 3258 a. 1.
2307460 Primary Facility 2014-09-17 Drilling/Alteration No Violations Noted THE CELLAR IS IN. BUTCH'S IS RUNNING 80' OF 20" CONDUCTOR.
2308239 Primary Facility 2014-09-24 Routine/Complete Inspection No Violations Noted Tophole rig was on site during inspection. This inspection was conducted in the presence of operator's representative. E&S controls were installed according to plan and appeared adequate to prevent soil run-off outside limits of disturbance. Vegetation was sparse in several areas. Department recommends operator consider an alternative seed mix to gain sufficient vegetative cover if vegetation does not take root.
2331570 Primary Facility 2014-12-24 Drilling/Alteration No Violations Noted TOP HOLE RIG DRILLING 8.75" HOLE AT 3,428'. THE SITE IS OK.
2370149 Primary Facility 2015-05-12 Drilling/Alteration No Violations Noted PATTERSON 278 RAN AND CEMENTED 17,625' OF 5.5" CASING. THE RIG IS NOW MOVING.
2378793 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted
2390948 Primary Facility 2015-07-09 Drilling/Alteration No Violations Noted WELL IS DRILLED BUT NOT FRACED. THE PROTECTIVE COVER IS ON THE PAD. THE SITE IS CLEAN.
2462299 Primary Facility 2016-02-29 Drilling/Alteration No Violations Noted THIS WELL WAS DRILLED BUT NOT FRACED.

THE PAD IS FENCED AND IN GOOD CONDITION.

2464916 Primary Facility 2016-03-03 Routine/Complete Inspection No Violations Noted
2488196 Primary Facility 2016-05-20 Drilling/Alteration No Violations Noted THIS WELL WAS DRILLED BUT NOT FRACED. THE WELL IS COVERED.

THE SITE IS IN GOOD CONDITION.

2542622 Primary Facility 2016-11-15 Routine/Complete Inspection No Violations Noted
2555624 Primary Facility 2017-01-26 Routine/Complete Inspection No Violations Noted On 1/26/2016 WQS Brian MacQuarrie met onsite at unconventional well pad with Spencer Johnson and Jason Harding of CNX for site inspection. Currently stimulation activities are being conducted at Eight wells on the pad. Temporary tanks are setup on well pad within secondary containment. Production equipment setup onsite. Above ground temporary storage tank setup on tank pad adjacent to well pad. Site stabilized in previously disturbed areas.
2675627 Primary Facility 2017-12-28 Routine/Complete Inspection No Violations Noted The site had been constructed in accordance with the E&S plan contained within the ESCGP. All site and access road erosion controls had been installed and maintained properly. Cut and fill slopes had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Four brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. While WQS Higgins was onsite a tanker truck removed fluids from the production tanks without incident.
2758555 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, brine tank and GPU appear to be operational. Well tag present. No observation of accelerated erosion or sedimentation related to well site or access road.

For data sources see[8]

References