X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-003-22367

Well Details

Well ID: 37-003-22367
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Forward Township
Operator Name: EQT PROD CO
Well Pad ID: 153071
Farm/Lease Name: ROSTOSKY 593713
License Status:
Spud Date:
Permit Date: 2015-11-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.202356
Longitude: -79.888567

For data sources see[1][2][3]

Well History

Date Event
2015-11-24 New Permit Application
2017-02-01 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2590397 Primary Facility 2017-05-04 Incident- Response to Accident or Event In Compliance with Policy On 5/3/17 a INCDT inspection of the Rostosky site was conducted in response to CTS ID ???. The following was observed:

>>An ant colony has taken up residence in the mailbox at the site entrance containing site plans. Eviction of these tenants is recommended.

>>Sections of perimeter CFS can be removed in areas sufficiently protected by permanent stabilization.

>>Perimeter CFS can be removed in areas sufficiently protected by permanent stabilization.

>>The reported incident involved to portable toilets being blown over during windstorms on 5/2/17. No visible impact was observed at time of inspection. Affected material was reportedly removed by toilet vendor.

>>An area of containment on the pad near the site access road was partially collapsed, remediation recommended.

2626271 Primary Facility 2017-06-01 Complaint Inspection No Violations Noted On 6/1/2017 I performed a complaint inspection related to the Rostosky well site in response to complaint ID 327246. The following was observed:

>>The complainant reported excessive noise from the site every night as well as concerns about the future possibility of impact to their water supply. No current impact to their water supply was reported. The complainant stated that the overnight noise had stopped roughly a week prior but expressed concern that it would begin again.

>>Communications with the operator resulted in the operator providing contact information for their community advisor staff person and an agreement to make efforts to reduce overnight site noise when possible.

For data sources see[5]

References