37-005-30201

Well Details

Well ID: 37-005-30201
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Plumcreek Township
Operator Name: EQT PROD CO
Well Pad ID: 149401
Farm/Lease Name: T A MCKEE 590270
License Status:
Spud Date:
Permit Date: 2009-02-05
Well Type: COMB. OIL&GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.705878
Longitude: -79.409259

For data sources see[1][2][3]

Well History

Date Event
2009-02-05 New Permit Application
2009-08-27 Performed Spud Operation
2009-10-07 Drilling Completion
2009-11-23 Perforation
2010-04-21 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EQT PROD CO 0.00 0 0.00 0 0.00 0
2010 EQT PROD CO 44,451.00 85 0.00 85 0.00 23
2011 EQT PROD CO 157,760.00 365 0.00 181 0.00 181
2012 EQT PROD CO 149,427.00 366 0.00 0 0.00 0
2013 EQT PROD CO 127,402.00 365 0.00 0 0.00 0
2014 EQT PROD CO 88,423.00 365 0.00 0 0.00 0
2015 EQT PROD CO 64,229.00 361 0.00 0 0.00 0
2016 EQT PROD CO 64,671.00 342 0.00 0 0.00 0
2017 EQT PROD CO 63,858.00 359 0.00 0 0.00 0
2018 EQT PROD CO 54,268.00 360 0.00 0 0.00 0
2019 EQT PROD CO 45,599.00 294 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 EQT PROD CO Drilling Fluid Waste 500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 EQT PROD CO Produced Fluid 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2010 EQT PROD CO Produced Fluid 484.00 Bbl IDENTIFY METHOD IN COMMENTS
2010 EQT PROD CO Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-23390
2011 EQT PROD CO Produced Fluid 671.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2011 EQT PROD CO Produced Fluid 420.00 Bbl INJECTION DISPOSAL WELL 34-009-22704
2011 EQT PROD CO Produced Fluid 619.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011 EQT PROD CO Produced Fluid 453.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 EQT PROD CO Produced Fluid 445.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Fracing Fluid Waste 30.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Produced Fluid 1,200.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2011 EQT PROD CO Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-23390
2011 EQT PROD CO Produced Fluid 231.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2012 EQT PROD CO Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 EQT PROD CO Produced Fluid 414.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2012 EQT PROD CO Produced Fluid 501.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2012 EQT PROD CO Produced Fluid 138.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 26.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012 EQT PROD CO Fracing Fluid Waste 146.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 82.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2013 EQT PROD CO Produced Fluid 1,668.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 81.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 EQT PROD CO Produced Fluid 99.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2014 EQT PROD CO Produced Fluid 1,391.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 97.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 EQT PROD CO Produced Fluid 108.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2014 EQT PROD CO Produced Fluid 335.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2014 EQT PROD CO Produced Fluid 91.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3097
2015 EQT PROD CO Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2015 EQT PROD CO Produced Fluid 544.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 35.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 EQT PROD CO Produced Fluid 463.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 63.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 197.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 EQT PROD CO Produced Fluid 174.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Other Oil & Gas Wastes 110.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 440.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO 330.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO 134.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Other Oil & Gas Wastes 59.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 42.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 482.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 EQT PROD CO Produced Fluid 49.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Produced Fluid 353.23 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Other Oil & Gas Wastes 95.04 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 387.54 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1826800 Primary Facility 2009-09-09 Routine/Complete Inspection No Violations Noted E&S plan and ESCGP-1 located onsite during site inspection. Drilling was ongoing at the time of the inspection. Belwo grade pit located onsite and it had more than the required two feet of lined freeboard. One of the completion pits shown on the E&S plan had been constructed at the time of the inspection and it appeared to have been constructed properly. All E&S control measures on the well-site and access road appeared to have been properly implemented. In addition all exposed earth area had been mulched, and many of the areas had been seeded and had temporary grass cover.
1827778 Primary Facility 2009-08-28 Complaint Inspection Pending Witness casing and cementing of 13 3/8" casing; No circulation Pit & E&S OK
1827807 Primary Facility 2009-08-27 Drilling/Alteration No Violations Noted drilling/ID&pit ok/E&S ok
1832124 Primary Facility 2009-10-01 Routine/Complete Inspection No Violations Noted E&S plan and ESCGP-1 located onsite during site inspection. Drill rig was located onsite at the time of the inspection, however it did not appear that drilling was ongoing. Below grade drill pit located onsite and it had more than the two feet of lined freeboard. Above grade frac pit located onsite, and it also had more than the two feet of required freeboard and it appeared to contain only freshwater. Erosion control measures that had been implemented on the site had been maintained properly and no evidence of accelerated erosion & sedimenation was observed.
1835946 Primary Facility 2009-10-06 Drilling/Alteration Violation(s) Noted @9970' Tripping NOV for discharge of mine water
1836843 Primary Facility 2009-10-16 Routine/Complete Inspection No Violations Noted EQT cemented 13 3/8" casing annulus to 60ft
1844866 Primary Facility 2009-11-17 Routine/Complete Inspection No Violations Noted E&S plan and ESCGP-1 located onsite during site inspection. Drilling appeared to have been completed at the time of the inspection, and the equipment was being brought in to stimulate the well. Freshwater impoundment located onsite had 15 feet of water according to the depth stick placed in the impoundment, and it had more than the two feet of required freeboard. Noted that the majority of the disturbed soil had been planted with vegetation and had been greened, or it had been mulched so as to minimize accelerated erosion & sedimentation until the well is stimulated and the site is ready to be restored. Observed no accelerated erosion & sedimentation with respect to either the well-site or access road.
1859105 Primary Facility 2010-01-26 Routine/Complete Inspection No Violations Noted E&S plan and ESCGP-1 located onsite during site inspection. Drilling had been completed at the time of the inspection. Below grade drill pit and well stimulation pit both had more than the required two feet of lined freeboard. All implemented erosion control measures appeared to be functioning properly and no accelerated erosion & sedimentation was observed in relation to the access road or well-site. The operator should continue to monitor the site until final restoration activities are completed.
1880025 Primary Facility 2010-04-27 Routine/Complete Inspection No Violations Noted Drilling had been completed at the time of the inspection. Below grade drill pit and well stimulation pit both had more than the required two feet of lined freeboard. Noted that it appeared that the well bore for permit number 005-30453 had been spudded and conductor pipe had been set. Noted that the side of the access road as it approaches Wright Road and the stream crossing for the UNT to Cherry Run had begun to develop erosion ditches and transport sediment towards the UNT. The operator should repair the erosion controls relating to the access road (i.e. rock lined and erosion control matting lined ditches) implemented to minimize the generation and transport of sediment relating to the access road.
1888382 Primary Facility 2010-06-01 Routine/Complete Inspection No Violations Noted Drilling for the above listed well had been completed. Drilling was ongoing for well 005-30453, which is located on the same well pad. Site inspection found no accelerated erosion & sedimentation issues in relation to the access road or well-site. Noted that the fresh water impoundment and below grade drill pits onsite had more than the required two feet of lined freeboard.
1903490 Primary Facility 2010-07-13 Routine/Complete Inspection No Violations Noted drilling/frac complete - plumbing for production/E&S ok/ID&tanks ok
1911689 Primary Facility 2010-09-07 Routine/Complete Inspection No Violations Noted Drilling was completed at the time of the inspection. All erosion controls appeared to be functioning properly and no accelerated erosion & sedimentation was observed in relation to the access road or well-site. At the time of the inspection the drill pit was in the process of being closed out and the frac impoundment located onsite was noted as empty.
1929873 Primary Facility 2010-11-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed at the time of the inspection. Noted that the access road erosion controls had been enhanced with rerocking of the collection ditches, and the installation of culverts and stabilized outlets. The area where the frac pit was had been regraded. This area required temporary erosion controls to insure that erosion & sedimentation is minimized through the winter months until the spring growing season.
2086159 Primary Facility 2012-07-24 Site Restoration No Violations Noted Drilling was completed on 10/07/09. Wells onsite appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The Department recommends increasing the height of the diked area where the brine tanks are located. There was no accelerated erosion or sedimentation observed in relation to the reclaimed well pad or the access road. It was noted that the access road erosion controls required maintenance so that the controls continue to effectively minimize erosion and sedimentation.
2101390 Primary Facility 2012-09-20 Routine/Complete Inspection No Violations Noted Drilling was completed on 10/07/09. Wells onsite appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The Department recommends increasing the height of the diked area where the brine tanks are located. There was no accelerated erosion or sedimentation observed in relation to the reclaimed well pad or the access road.
2170539 Primary Facility 2013-05-30 Routine/Complete Inspection No Violations Noted rilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Earthen brine tank containment had been replaced with a metallic constructed containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. The site had been stabilized and the vegetative cover met the 70% uniform coverage criteria.
2434331 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted Unconventional well tagged-in production. Equipment-tanks-dike-E&S controls-well site good.
2555186 Primary Facility 2017-01-25 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located on site within containment. Both tanks and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1835946 573560 10/06/2009 2009-10-06 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
573560 251276 NOV - Notice of Violation Comply/Closed 2009-10-19
573560 254688 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-01-29 2010-01-29 $4,000.00 $4,000.00

For data sources see[7]

References