Well Details

Well ID: 37-005-30332
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146035
Farm/Lease Name: BVL/MUSHROOM FARM 4-1813
License Status:
Spud Date:
Permit Date: 2009-04-28
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.833988
Longitude: -79.673209

For data sources see[1][2][3]

Well History

Date Event
2009-04-28 New Permit Application
2010-03-22 Performed Spud Operation
2010-03-31 Drilling Completion
2010-04-30 Perforation
2013-06-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 22,843.00 161 0.00 0 0.00 0
2011 SNYDER BROS INC 24,931.00 297 0.00 0 0.00 0
2012 SNYDER BROS INC 21,825.00 365 0.00 0 0.00 0
2013 SNYDER BROS INC 17,157.00 365 0.00 0 0.00 0
2014 SNYDER BROS INC 14,308.00 363 0.00 0 0.00 0
2015 SNYDER BROS INC 12,292.00 353 0.00 0 0.00 0
2016 SNYDER BROS INC 10,993.00 332 0.00 0 0.00 0
2017 SNYDER BROS INC 9,720.00 359 0.00 0 0.00 0
2018 SNYDER BROS INC 745.00 54 0.00 0 0.00 0
2019 SNYDER BROS INC 12,573.00 280 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 SNYDER BROS INC Produced Fluid 1,522.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 SNYDER BROS INC Produced Fluid 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 SNYDER BROS INC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 SNYDER BROS INC Produced Fluid 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 SNYDER BROS INC Produced Fluid 280.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 SNYDER BROS INC Produced Fluid 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 SNYDER BROS INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 SNYDER BROS INC Produced Fluid 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Produced Fluid 120.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 SNYDER BROS INC Produced Fluid 42.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 SNYDER BROS INC 42.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 SNYDER BROS INC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 1,044.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 45.00 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1873428 Primary Facility 2010-03-29 Drilling/Alteration No Violations Noted MARCELLUS - drilling/E&S ok/ID&pit ok
1874957 Primary Facility 2010-03-26 Routine/Complete Inspection No Violations Noted Drill rig was on-site during the inspection. Drill pit appears to be in sound condition. Located the Site ID sign and E&S plan. E&S controls such as silt fence and rocked culverts have been installed.
1877101 Primary Facility 2010-04-01 Drilling/Alteration No Violations Noted MARCELLUS - logging/E&S ok/ID&pit ok
2048293 Primary Facility 2012-03-06 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the well site or access road.
2160841 Primary Facility 2013-04-08 Routine/Complete Inspection No Violations Noted Site was equipped for production and restored. No E & S issues were noted. Brine tanks and production equipment appeared to be in good order.
2226490 Primary Facility 2013-10-25 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2470357 Primary Facility 2016-03-31 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus plumbed-vented 10' vertical. Well head casing-production set-equipment- 2 grounded 100 bbl fiberglass tanks look ok.
2612537 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing-production set equipment-2 grounded 100 bbl fiberglass tanks look ok.