37-005-30438

Well Details

Well ID: 37-005-30438
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Kittanning Township
Operator Name: WGM GAS CO INC
Well Pad ID:
Farm/Lease Name: WILLIAM MOHNEY 2
License Status:
Spud Date:
Permit Date: 2009-08-11
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.764294
Longitude: -79.447968

For data sources see[1][2][3]

Well History

Date Event
2009-08-11 New Permit Application
2009-12-02 Performed Spud Operation
2009-12-07 Drilling Completion
2010-07-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 WGM GAS CO INC 0.00 0 0.00 0 0.00 0
2010 WGM GAS CO INC 0.00 0 0.00 0 0.00 0
2011 WGM GAS CO INC 5,421.00 365 0.00 0 0.00 0
2012 WGM GAS CO INC 2,780.00 365 0.00 0 0.00 0
2013 WGM GAS CO INC 968.00 365 0.00 0 0.00 0
2014 WGM GAS CO INC 1,212.00 365 0.00 0 0.00 0
2015 WGM GAS CO INC 502.00 365 0.00 0 0.00 0
2016 WGM GAS CO INC 99.5 365 0.00 0 0.00 0
2017 WGM GAS CO INC 406.30 365 0.00 0 0.00 0
2018 WGM GAS CO INC 1,136.00 365 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1848831 Primary Facility 2009-12-03 Drilling/Alteration No Violations Noted drilling in process - awaiting cement on 7"/E&S ok/ID&pit ok
1849048 Primary Facility 2009-12-09 Routine/Complete Inspection Violation(s) Noted Drilling had been completed at the time of the inspection, drill rig not located onsite. Below grade pit located onsite and appeared to be in sound condition. Pit contained drill cuttings and fluids and had more than the required two-feet of lined freeboard. Noted that the E&S plan located onsite was thin in that it had only plan drawing, and three typical pages. The E&S plan should also include information regarding soils and soil characteristics, in addition to details as to how the drill cuttings will be disposed of. Additionaly the plan should include information on how the site will be restored. Noted that the filter fabric fence had not been installed properly.
1953865 Primary Facility 2009-12-30 Compliance Evaluation No Violations Noted Drilling had been completed at the time of the inspection. Below grade pit had been backfilled, and the site was in the process of being regraded. The Department recommends during future site constructions that culvert inlet & outlet construction include a stabilized inlet area (i.e. clean durable rock) and the outlet be constructed to minimize sediment transport during well development activities. Once these activities are completed the rock can be left or removed in favor of a vegetative stabilized inlet and outlet, as would be appropriate in this setting. The operator should continue to monitor the well-site and access road to insure all erosion controls are functioning properly until final restoration activities are completed.
1953866 Primary Facility 2011-03-02 Site Restoration No Violations Noted Drilling was completed on 12/07/09. Well appeared to be equipped for production. Observed that the well-site did not have vegetative cover meeting the 70% uniform coverage criteria nor was there another BMP implemented capable of resisting accelerated erosion & sedimentation. The well-site itself was developing erosion ditches, however there was no evidence of off-site transportation of sediment. At this time the Department is requesting documentation from the operator outlining a plan of action to achieve the 70% uniform vegetative cover on the well-site to prevent the existing erosion issues from developing into a larger problem resulting in off-site sediment transport. This documentation should be forwarded to WQS Gregory Higgins at the above address and should be received no later than March 24, 2011.
2132417 Primary Facility 2013-01-22 Routine/Complete Inspection No Violations Noted ell appeared to be equipped for production. Site had been properly restored and there were no accelerated erosion or sedimentation issues observed.
2488120 Primary Facility 2016-05-27 Routine/Complete Inspection No Violations Noted Well tagged and in production. The well head casing looked ok.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1849048 577583 12/09/2009 2009-12-09 102.4INADPLN - E&S Plan not adequate Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
577583 253329 NOV - Notice of Violation Comply/Closed 2009-12-30
577583 261681 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-07-29 2010-07-29 $2,500.00 $2,500.00

For data sources see[6]