Well ID: 37-005-30453
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Plumcreek Township
Operator Name: EQT PROD CO
Well Pad ID: 149401
Farm/Lease Name: T A MCKEE 590271
License Status:
Spud Date:
Permit Date: 2009-09-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.705830
Longitude: -79.409228

For data sources see[1][2][3]

Well History

Date Event
2009-09-10 New Permit Application
2010-05-25 Performed Spud Operation
2010-06-22 Drilling Completion
2010-07-10 Perforation
2010-12-02 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EQT PROD CO 0.00 0 0.00 0 0.00 0
2010 EQT PROD CO 227,895.00 156 0.00 156 0.00 0
2011 EQT PROD CO 329,992.00 365 0.00 181 0.00 181
2012 EQT PROD CO 237,619.00 366 0.00 0 0.00 0
2013 EQT PROD CO 185,768.00 365 0.00 0 0.00 0
2014 EQT PROD CO 151,061.00 365 0.00 0 0.00 0
2015 EQT PROD CO 127,820.00 356 0.00 0 0.00 0
2016 EQT PROD CO 121,788.00 364 0.00 0 0.00 0
2017 EQT PROD CO 104,225.00 356 0.00 0 0.00 0
2018 EQT PROD CO 93,725.00 357 0.00 0 0.00 0
2019 EQT PROD CO 81,327.00 285 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 EQT PROD CO Drilling Fluid Waste 62.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 EQT PROD CO Produced Fluid 343.00 Bbl STORAGE PENDING DISPOSAL OR REUSE 34-121-2-3995
2010 EQT PROD CO Drilling Fluid Waste 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 EQT PROD CO Produced Fluid 526.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2010 EQT PROD CO Produced Fluid 4,391.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2010 EQT PROD CO Produced Fluid 182.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28462
2010 EQT PROD CO Drilling Fluid Waste 280.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 EQT PROD CO Produced Fluid 814.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2011 EQT PROD CO Produced Fluid 425.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011 EQT PROD CO Produced Fluid 112.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 EQT PROD CO Produced Fluid 685.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Produced Fluid 780.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2011 EQT PROD CO Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2011 EQT PROD CO Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2012 EQT PROD CO Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2012 EQT PROD CO Produced Fluid 306.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2012 EQT PROD CO Produced Fluid 27.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 EQT PROD CO Produced Fluid 66.00 Bbl INJECTION DISPOSAL WELL 34-167-29577
2012 EQT PROD CO Produced Fluid 1,611.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2012 EQT PROD CO Produced Fluid 757.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 51.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012 EQT PROD CO Fracing Fluid Waste 5.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid 161.00 Bbl INJECTION DISPOSAL WELL 34-167-28466
2013 EQT PROD CO Produced Fluid 1,950.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid 81.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 EQT PROD CO Produced Fluid 112.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2013 EQT PROD CO Produced Fluid 224.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 EQT PROD CO Produced Fluid 1,067.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Produced Fluid 429.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 EQT PROD CO Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3097
2015 EQT PROD CO Fracing Fluid Waste 51.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid 103.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 EQT PROD CO Produced Fluid 317.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 EQT PROD CO Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-007-23262
2015 EQT PROD CO Produced Fluid 1,301.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Other Oil & Gas Wastes 100.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 1,086.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid 102.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3097
2016 EQT PROD CO Produced Fluid 67.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 EQT PROD CO Produced Fluid 472.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 EQT PROD CO Produced Fluid 284.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Other Oil & Gas Wastes 30.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid 760.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO 360.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO Other Oil & Gas Wastes 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EQT PROD CO 284.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Other Oil & Gas Wastes 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 EQT PROD CO Produced Fluid 175.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 87.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EQT PROD CO Produced Fluid 817.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 EQT PROD CO Produced Fluid 80.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EQT PROD CO Produced Fluid 556.78 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 130.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 EQT PROD CO Other Oil & Gas Wastes 160.01 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 628.91 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid 44.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1885555 Primary Facility 2010-05-18 Drilling/Alteration Violation(s) Noted Moving on location; conductor set; no notification
1887971 Primary Facility 2010-05-21 Drilling/Alteration No Violations Noted spud called - rigging-up/E&S ok/ID&pit ok
1888023 Primary Facility 2010-05-28 Routine/Complete Inspection No Violations Noted Met onsite with operator representative Brian Welsh. Mine discharge eminating from Margaret 11 Mine Vent as a result of ongoing drilling of the above listed well was observed. After the most previous occurrence Penn DOT had dug an earthen ditch out to carry the water to drainage culvert, under Cherry Run Road and into Cherry Run. No adverse effects were noted in Cherry Run except for a small amount of cloudiness in the water which dissipated 20 to 30 feet downstream. Abundant aquatic life was observed in the stream, above, below, and in the area where the mine discharge water was entering Cherry Run. There were no dead fish, frogs, or other aquatic life was observed while onsite. No decrease in the amount of flow from the discharge was observed while onsite. Discharge area will be evaluated the beginning of next week to evaluate whether the discharge is ongoing and if any permanent erosion control measures are required.
1888385 Primary Facility 2010-06-01 Routine/Complete Inspection No Violations Noted Mine discharge from Margaret 11 Mine Vent as a result of drilling the above well was no longer occurring. Observed no additional erosion issues related to the mine water discharge. Observed no adverse effects in Cherry Run, the receiving stream for the mine discharge. Site inspection found no accelerated erosion & sedimentation issues in relation to the access road or well-site. Noted that the fresh water impoundment and below grade drill pits onsite had more than the required two feet of lined freeboard.
1891363 Primary Facility 2010-05-28 Drilling/Alteration No Violations Noted drilling - mine encountered @ 338-342ft resulting in discharge to Cherry Run via mine vent/E&S ok/ID&pit ok
1891365 Primary Facility 2010-06-04 Drilling/Alteration No Violations Noted drilling @ 2280ft/E&S ok/ID&pit ok
1893573 Primary Facility 2010-06-08 Drilling/Alteration No Violations Noted Cementing from TD to KOP
1893574 Primary Facility 2010-06-10 Drilling/Alteration No Violations Noted TD 7644' Preparing to kick off @ 6180'
1894231 Primary Facility 2010-06-10 Drilling/Alteration No Violations Noted Kicking off lateral @ 6180'
1894822 Primary Facility 2010-06-22 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Discharge follow-up.
1894824 Primary Facility 2010-06-23 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Site inspection performed as a follow-up to a drill pit fluid discharge from 06/21/10. Met onsite with EQT representative Brian Welsh. Approximately 2/3 of the contaminated media had been excavated and removed at the time of the inspection. Contaminated media was being contained onsite in covered roll-off boxes. After the excavation of the contaminated media is completed the area will be seeded and mulched. Observed no further discharge of the drill fluids to the UNT to Cherry Run. In addition noted significantly decreased flow in the UNT to Cherry Run. Brian Welsh anticipated completion of remediation activities by the end of 06/25/10. Observed no visible evidence of degradation in Cherry Run at the bridge for Wright Road.
1894826 Primary Facility 2010-06-25 Compliance Evaluation No Violations Noted Discharge remediation work was underway and nearing completion. The vast majority of drill cutting/fluids contaminated media had been scraped up and contained in covered roll-off boxes (12 in total). The areas which had been disturbed to remove the media had been seeded & mulched. The large rip rap located in the rock filter area had been removed, cleaned and put back into place. A small plastic lined sediment trap and rock apron leading from the rock filter to the trap had been built. This small trap is intended to capture any additional runoff which may contain any residual discharge contaminants which may not have been removed, and hold them so that they may be removed and taken or pumped back up to the drill pit. Six hay bales had been placed where the discharge entered the UNT as an additional barrier to prevent any further transport of the discharge contaminants. The E&S plan drawing located onsite was revised to show this additon and initialed by WQS Higgins and EQT representative Brian Welsh while onsite.
1894829 Primary Facility 2010-06-21 Drilling/Alteration Violation(s) Noted Inspection in response to operator providing the Department information on drilling fluids spill
1898194 Primary Facility 2010-07-14 Routine/Complete Inspection No Violations Noted Well stimulation activities were ongoing at the time of the inspection. Fracing had been completed. All below grade pits had more than the required two feet of lined freeboard. Noted that the access road will require upkeep and maintenance after well stimulation activities are completed and all equipment is moved off-site. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. Noted that there did not appear any additional drill fluid contaminated runoff in association with the discharge from later June 2010. The collection basin implemented below the well-site to collect any runoff which may be contaminated with the drill fluids appear to contain normal runoff water. Aquatic life (i.e. frogs) were noted as in this collection pool as were insects. The area which had been affected by the discharge was seeded & mulched and the vegetation had begun to grow.
1903483 Primary Facility 2010-07-13 Routine/Complete Inspection No Violations Noted MARCELLUS - drilling/frac completed - flow-back ongoing/E&S ok/ID&pit ok
1911691 Primary Facility 2010-09-07 Routine/Complete Inspection No Violations Noted Drilling was completed at the time of the inspection. All erosion controls appeared to be functioning properly and no accelerated erosion & sedimentation was observed in relation to the access road or well-site. At the time of the inspection the drill pit was in the process of being closed out and the frac impoundment located onsite was noted as empty.
1919387 Primary Facility 2010-10-13 Routine/Complete Inspection No Violations Noted Drilling had been completed. Met onsite with operator representative Brian Welsh to discuss possible access road erosion control improvements. Agreed that the addition of turnouts and culverts to carry runoff from the high side of the road to the lower side and to break up the amount of water that reaches the bottom of the hill would be proper and effective measures. Mr. Welsh stated that this work will be undertaken the week of October 18th and that once the location of where the culverts and turnouts will be located is determined Mr. Welsh will contact WQS Higgins to review the updated erosion control map for construction and site reclamation.
1929876 Primary Facility 2010-11-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed at the time of the inspection. Noted that the access road erosion controls had been enhanced with rerocking of the collection ditches, and the installation of culverts and stabilized outlets. The area where the frac pit was had been regraded. This area required temporary erosion controls to insure that erosion & sedimentation is minimized through the winter months until the spring growing season.
1967745 Primary Facility 2011-04-20 Routine/Complete Inspection No Violations Noted TA McKee 590271 and TA McKee 590270 were located on the well pad and appeared to be equipped for production. Brine tanks located onsite and appeared to be in sound condition. Frac pit area had been regraded, seeded & mulched. Observed no accelerated erosion or sedimentation in relation to the access road or well-site.
2086162 Primary Facility 2012-07-24 Site Restoration No Violations Noted Drilling was completed on 06/22/10. Wells onsite appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The Department recommends increasing the height of the diked area where the brine tanks are located. There was no accelerated erosion or sedimentation observed in relation to the reclaimed well pad or the access road. It was noted that the access road erosion controls required maintenance so that the controls continue to effectively minimize erosion and sedimentation.
2101389 Primary Facility 2012-09-20 Routine/Complete Inspection No Violations Noted Wells onsite appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The Department recommends increasing the height of the diked area where the brine tanks are located. There was no accelerated erosion or sedimentation observed in relation to the reclaimed well pad or the access road.
2170541 Primary Facility 2013-05-30 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Earthen brine tank containment had been replaced with a metallic constructed containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. The site had been stabilized and the vegetative cover met the 70% uniform coverage criteria.
2434335 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted Unconventional well tagged-in production. Equipment-tanks-dike-E&S controls-well site good.
2555187 Primary Facility 2017-01-25 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located on site within containment. Both tanks and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1885555 587365 05/18/2010 2010-05-18 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling Administrative
1894829 590438 06/21/2010 2010-06-21 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety
1894829 590439 06/21/2010 2010-06-21 201E - Failure to comply with terms and conditions of permit Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
587365 257892 NOV - Notice of Violation Comply/Closed 2010-06-11
587365 264200 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-12 2010-11-12 $10,800.00 $10,800.00
590438 259817 NOV - Notice of Violation Comply/Closed 2010-06-28
590438 264200 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-12 2010-11-12 $10,800.00 $10,800.00
590439 259817 NOV - Notice of Violation Comply/Closed 2010-06-28
590439 264200 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-12 2010-11-12 $10,800.00 $10,800.00