Well ID: 37-005-30453 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.70583,"lon":-79.409228,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Plumcreek Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 149401 | |
Farm/Lease Name: T A MCKEE 590271 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.705830 | |
Longitude: -79.409228 |
Date | Event |
---|---|
2009-09-10 | New Permit Application |
2010-05-25 | Performed Spud Operation |
2010-06-22 | Drilling Completion |
2010-07-10 | Perforation |
2010-12-02 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | EQT PROD CO | 227,895.00 | 156 | 0.00 | 156 | 0.00 | 0 |
2011 | EQT PROD CO | 329,992.00 | 365 | 0.00 | 181 | 0.00 | 181 |
2012 | EQT PROD CO | 237,619.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EQT PROD CO | 185,768.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EQT PROD CO | 151,061.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 127,820.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 121,788.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 104,225.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 93,725.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 81,327.00 | 285 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | EQT PROD CO | Drilling Fluid Waste | 62.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | EQT PROD CO | Produced Fluid | 343.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | 34-121-2-3995 |
2010 | EQT PROD CO | Drilling Fluid Waste | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | EQT PROD CO | Produced Fluid | 526.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2010 | EQT PROD CO | Produced Fluid | 4,391.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-167-28466 |
2010 | EQT PROD CO | Produced Fluid | 182.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-167-28462 |
2010 | EQT PROD CO | Drilling Fluid Waste | 280.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | EQT PROD CO | Produced Fluid | 814.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-121-24037 |
2011 | EQT PROD CO | Produced Fluid | 425.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-167-28466 |
2011 | EQT PROD CO | Produced Fluid | 112.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | EQT PROD CO | Produced Fluid | 685.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EQT PROD CO | Produced Fluid | 780.00 Bbl | INJECTION DISPOSAL WELL | 34-083-24137 |
2011 | EQT PROD CO | Produced Fluid | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-059-24067 |
2011 | EQT PROD CO | Produced Fluid | 119.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
2012 | EQT PROD CO | Produced Fluid | 119.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2012 | EQT PROD CO | Produced Fluid | 306.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2012 | EQT PROD CO | Produced Fluid | 27.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | EQT PROD CO | Produced Fluid | 66.00 Bbl | INJECTION DISPOSAL WELL | 34-167-29577 |
2012 | EQT PROD CO | Produced Fluid | 1,611.00 Bbl | INJECTION DISPOSAL WELL | 34-083-24137 |
2012 | EQT PROD CO | Produced Fluid | 757.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EQT PROD CO | Produced Fluid | 51.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2012 | EQT PROD CO | Fracing Fluid Waste | 5.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EQT PROD CO | Produced Fluid | 161.00 Bbl | INJECTION DISPOSAL WELL | 34-167-28466 |
2013 | EQT PROD CO | Produced Fluid | 1,950.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Produced Fluid | 81.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013 | EQT PROD CO | Produced Fluid | 112.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2013 | EQT PROD CO | Produced Fluid | 224.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | EQT PROD CO | Produced Fluid | 1,067.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Produced Fluid | 429.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2015 | EQT PROD CO | Produced Fluid | 102.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3097 |
2015 | EQT PROD CO | Fracing Fluid Waste | 51.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Produced Fluid | 103.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | EQT PROD CO | Produced Fluid | 317.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2015 | EQT PROD CO | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-007-23262 |
2015 | EQT PROD CO | Produced Fluid | 1,301.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 1,086.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 102.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3097 |
2016 | EQT PROD CO | Produced Fluid | 67.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 472.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | EQT PROD CO | Produced Fluid | 284.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 30.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 760.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | 360.00 Bbl | REUSE (AT WELL PAD) | ||
2017 | EQT PROD CO | 65.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 65.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | 284.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 24.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | Produced Fluid | 175.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 87.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 817.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | EQT PROD CO | Produced Fluid | 80.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | EQT PROD CO | Produced Fluid | 556.78 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 130.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 160.01 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 628.91 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 44.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1885555 | Primary Facility | 2010-05-18 | Drilling/Alteration | Violation(s) Noted | Moving on location; conductor set; no notification |
1887971 | Primary Facility | 2010-05-21 | Drilling/Alteration | No Violations Noted | spud called - rigging-up/E&S ok/ID&pit ok |
1888023 | Primary Facility | 2010-05-28 | Routine/Complete Inspection | No Violations Noted | Met onsite with operator representative Brian Welsh. Mine discharge eminating from Margaret 11 Mine Vent as a result of ongoing drilling of the above listed well was observed. After the most previous occurrence Penn DOT had dug an earthen ditch out to carry the water to drainage culvert, under Cherry Run Road and into Cherry Run. No adverse effects were noted in Cherry Run except for a small amount of cloudiness in the water which dissipated 20 to 30 feet downstream. Abundant aquatic life was observed in the stream, above, below, and in the area where the mine discharge water was entering Cherry Run. There were no dead fish, frogs, or other aquatic life was observed while onsite. No decrease in the amount of flow from the discharge was observed while onsite. Discharge area will be evaluated the beginning of next week to evaluate whether the discharge is ongoing and if any permanent erosion control measures are required. |
1888385 | Primary Facility | 2010-06-01 | Routine/Complete Inspection | No Violations Noted | Mine discharge from Margaret 11 Mine Vent as a result of drilling the above well was no longer occurring. Observed no additional erosion issues related to the mine water discharge. Observed no adverse effects in Cherry Run, the receiving stream for the mine discharge. Site inspection found no accelerated erosion & sedimentation issues in relation to the access road or well-site. Noted that the fresh water impoundment and below grade drill pits onsite had more than the required two feet of lined freeboard. |
1891363 | Primary Facility | 2010-05-28 | Drilling/Alteration | No Violations Noted | drilling - mine encountered @ 338-342ft resulting in discharge to Cherry Run via mine vent/E&S ok/ID&pit ok |
1891365 | Primary Facility | 2010-06-04 | Drilling/Alteration | No Violations Noted | drilling @ 2280ft/E&S ok/ID&pit ok |
1893573 | Primary Facility | 2010-06-08 | Drilling/Alteration | No Violations Noted | Cementing from TD to KOP |
1893574 | Primary Facility | 2010-06-10 | Drilling/Alteration | No Violations Noted | TD 7644' Preparing to kick off @ 6180' |
1894231 | Primary Facility | 2010-06-10 | Drilling/Alteration | No Violations Noted | Kicking off lateral @ 6180' |
1894822 | Primary Facility | 2010-06-22 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Discharge follow-up. |
1894824 | Primary Facility | 2010-06-23 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Site inspection performed as a follow-up to a drill pit fluid discharge from 06/21/10. Met onsite with EQT representative Brian Welsh. Approximately 2/3 of the contaminated media had been excavated and removed at the time of the inspection. Contaminated media was being contained onsite in covered roll-off boxes. After the excavation of the contaminated media is completed the area will be seeded and mulched. Observed no further discharge of the drill fluids to the UNT to Cherry Run. In addition noted significantly decreased flow in the UNT to Cherry Run. Brian Welsh anticipated completion of remediation activities by the end of 06/25/10. Observed no visible evidence of degradation in Cherry Run at the bridge for Wright Road. |
1894826 | Primary Facility | 2010-06-25 | Compliance Evaluation | No Violations Noted | Discharge remediation work was underway and nearing completion. The vast majority of drill cutting/fluids contaminated media had been scraped up and contained in covered roll-off boxes (12 in total). The areas which had been disturbed to remove the media had been seeded & mulched. The large rip rap located in the rock filter area had been removed, cleaned and put back into place. A small plastic lined sediment trap and rock apron leading from the rock filter to the trap had been built. This small trap is intended to capture any additional runoff which may contain any residual discharge contaminants which may not have been removed, and hold them so that they may be removed and taken or pumped back up to the drill pit. Six hay bales had been placed where the discharge entered the UNT as an additional barrier to prevent any further transport of the discharge contaminants. The E&S plan drawing located onsite was revised to show this additon and initialed by WQS Higgins and EQT representative Brian Welsh while onsite. |
1894829 | Primary Facility | 2010-06-21 | Drilling/Alteration | Violation(s) Noted | Inspection in response to operator providing the Department information on drilling fluids spill |
1898194 | Primary Facility | 2010-07-14 | Routine/Complete Inspection | No Violations Noted | Well stimulation activities were ongoing at the time of the inspection. Fracing had been completed. All below grade pits had more than the required two feet of lined freeboard. Noted that the access road will require upkeep and maintenance after well stimulation activities are completed and all equipment is moved off-site. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. Noted that there did not appear any additional drill fluid contaminated runoff in association with the discharge from later June 2010. The collection basin implemented below the well-site to collect any runoff which may be contaminated with the drill fluids appear to contain normal runoff water. Aquatic life (i.e. frogs) were noted as in this collection pool as were insects. The area which had been affected by the discharge was seeded & mulched and the vegetation had begun to grow. |
1903483 | Primary Facility | 2010-07-13 | Routine/Complete Inspection | No Violations Noted | MARCELLUS - drilling/frac completed - flow-back ongoing/E&S ok/ID&pit ok |
1911691 | Primary Facility | 2010-09-07 | Routine/Complete Inspection | No Violations Noted | Drilling was completed at the time of the inspection. All erosion controls appeared to be functioning properly and no accelerated erosion & sedimentation was observed in relation to the access road or well-site. At the time of the inspection the drill pit was in the process of being closed out and the frac impoundment located onsite was noted as empty. |
1919387 | Primary Facility | 2010-10-13 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed. Met onsite with operator representative Brian Welsh to discuss possible access road erosion control improvements. Agreed that the addition of turnouts and culverts to carry runoff from the high side of the road to the lower side and to break up the amount of water that reaches the bottom of the hill would be proper and effective measures. Mr. Welsh stated that this work will be undertaken the week of October 18th and that once the location of where the culverts and turnouts will be located is determined Mr. Welsh will contact WQS Higgins to review the updated erosion control map for construction and site reclamation. |
1929876 | Primary Facility | 2010-11-23 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed at the time of the inspection. Noted that the access road erosion controls had been enhanced with rerocking of the collection ditches, and the installation of culverts and stabilized outlets. The area where the frac pit was had been regraded. This area required temporary erosion controls to insure that erosion & sedimentation is minimized through the winter months until the spring growing season. |
1967745 | Primary Facility | 2011-04-20 | Routine/Complete Inspection | No Violations Noted | TA McKee 590271 and TA McKee 590270 were located on the well pad and appeared to be equipped for production. Brine tanks located onsite and appeared to be in sound condition. Frac pit area had been regraded, seeded & mulched. Observed no accelerated erosion or sedimentation in relation to the access road or well-site. |
2086162 | Primary Facility | 2012-07-24 | Site Restoration | No Violations Noted | Drilling was completed on 06/22/10. Wells onsite appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The Department recommends increasing the height of the diked area where the brine tanks are located. There was no accelerated erosion or sedimentation observed in relation to the reclaimed well pad or the access road. It was noted that the access road erosion controls required maintenance so that the controls continue to effectively minimize erosion and sedimentation. |
2101389 | Primary Facility | 2012-09-20 | Routine/Complete Inspection | No Violations Noted | Wells onsite appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The Department recommends increasing the height of the diked area where the brine tanks are located. There was no accelerated erosion or sedimentation observed in relation to the reclaimed well pad or the access road. |
2170541 | Primary Facility | 2013-05-30 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Earthen brine tank containment had been replaced with a metallic constructed containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. The site had been stabilized and the vegetative cover met the 70% uniform coverage criteria. |
2434335 | Primary Facility | 2015-12-17 | Routine/Complete Inspection | No Violations Noted | Unconventional well tagged-in production. Equipment-tanks-dike-E&S controls-well site good. |
2555187 | Primary Facility | 2017-01-25 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located on site within containment. Both tanks and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1885555 | 587365 | 05/18/2010 | 2010-05-18 | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | Administrative | |
1894829 | 590438 | 06/21/2010 | 2010-06-21 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | |
1894829 | 590439 | 06/21/2010 | 2010-06-21 | 201E - Failure to comply with terms and conditions of permit | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
587365 | 257892 | NOV - Notice of Violation | Comply/Closed | 2010-06-11 | |||
587365 | 264200 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-12 | 2010-11-12 | $10,800.00 | $10,800.00 |
590438 | 259817 | NOV - Notice of Violation | Comply/Closed | 2010-06-28 | |||
590438 | 264200 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-12 | 2010-11-12 | $10,800.00 | $10,800.00 |
590439 | 259817 | NOV - Notice of Violation | Comply/Closed | 2010-06-28 | |||
590439 | 264200 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-12 | 2010-11-12 | $10,800.00 | $10,800.00 |