Well ID: 37-005-30621 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.965733,"lon":-79.241125,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Redbank Township | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: FARSTER 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-04-29 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.965733 | |
Longitude: -79.241125 |
Date | Event |
---|---|
2010-04-29 | New Permit Application |
2010-07-06 | Performed Spud Operation |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1896776 | Primary Facility | 2010-07-07 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit onsite and it had more than the required two feet of lined freeboard. E&S plan located onsite. Noted that the silt fencing had not been implemented properly. Specifically it had not been trenched in. Installed in this way the silt fencing will provide little to no minimization of sediment transport. The Department recommends that the operator properly install the fencing as soon as possible before a significant precipitation event. |
1898205 | Primary Facility | 2010-07-07 | Drilling/Alteration | No Violations Noted | drilling/E&S ok/tophole water disch in process/pit&ID ok |
For data sources see[5]