Well Details

Well ID: 37-005-30663
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146481
Farm/Lease Name: ROBERT J HEPFL ETUX 1-55
License Status:
Spud Date:
Permit Date: 2010-06-16
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.871075
Longitude: -79.504658

For data sources see[1][2][3]

Well History

Date Event
2010-06-16 New Permit Application
2010-10-27 New Permit Application
2011-01-07 Performed Spud Operation
2011-01-13 Drilling Completion
2011-03-29 Perforation
2013-05-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2011 SNYDER BROS INC 45,014.00 169 0.00 0 0.00 0
2012 SNYDER BROS INC 40,677.00 361 0.00 0 0.00 0
2013 SNYDER BROS INC 31,158.00 364 0.00 0 0.00 0
2014 SNYDER BROS INC 23,338.00 361 0.00 0 0.00 0
2015 SNYDER BROS INC 20,158.00 356 0.00 0 0.00 0
2016 SNYDER BROS INC 16,621.00 353 0.00 0 0.00 0
2017 SNYDER BROS INC 14,416.00 359 0.00 0 0.00 0
2018 SNYDER BROS INC 12,197.00 355 0.00 0 0.00 0
2019 SNYDER BROS INC 11,615.00 352 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 SNYDER BROS INC Produced Fluid 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 SNYDER BROS INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-049-23127
2011 SNYDER BROS INC Produced Fluid 320.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2014 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1941058 Primary Facility 2011-01-05 Drilling/Alteration No Violations Noted Rig not yet on location at time of inspection.
1941631 Primary Facility 2011-01-07 Drilling/Alteration No Violations Noted Waiting on cement at time of inspection. Information per drillers log and cement tickets: 62' of 13 3/8" conductor set in 17 1/2" hole and sanded in. 168' of 9 5/8" casing set in 202' 12 1/4" hole and cemented with 80 sacks of "A" containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 11:38 01-07-11. Per First Class Energy rep, cement basket run on second joint from surface at approximately 84'. Cement fell approximately 9' after truck left location.
1943108 Primary Facility 2011-01-11 Drilling/Alteration No Violations Noted Drilling 6 1/4" hole at 1900' of proposed 6852' TD at time of inspection. Information per drillers log and cement tickets: 926' of 20 lb/ft 7" casing set in 990' of 8 7/8" hole and cemented with 200 sacks of "A" containing 3% CACL2 & 1/4# flake (yield=1.18 cu ft/sk). Cement returns to surface realized with plug landing at 14:24 01-10-11. On 01-11-11 tested BOP at 350 psi for 15 min.
1949845 Primary Facility 2011-01-27 Routine/Complete Inspection No Violations Noted Well is drilled. Site ID sign and E&S plan located. Pit is on-site / appears to be in sound condition. There is no evidence of accelerated erosion and sedimentation on the well site or the access road.
2046893 Primary Facility 2012-03-01 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, and the fill and cut slopes had vegetation which met the 70% uniform coverage criteria. There were several small erosion ditches observed on the fill slope side of the well pad. The Department is requesting that the to address this issue the operator scarify the unvegetated portion and seed & mulch the remainder of the well pad to alleviate the runoff causing the minor erosion.
2082438 Primary Facility 2012-07-11 Site Restoration No Violations Noted At the time of inspection the well was and equipped for production. The site is restored meeting the 70% uniform vegetative coverage criteria. No accelerated erosion or sedimentation in relation to the access road or well pad area at the time of inspection.
2165376 Primary Facility 2013-05-10 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located on-site and they appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2381583 Primary Facility 2015-06-23 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road Due to recent precipitation events the operator should consider actions to address access road erosion control maintenance and repair.
2571272 Primary Facility 2017-03-14 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[7]