37-005-30854

Well Details

Well ID: 37-005-30854
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Madison Township
Operator Name: RIDGEVIEW GAS & OIL INC
Well Pad ID:
Farm/Lease Name: JOSEPH W BISH 1
License Status:
Spud Date:
Permit Date: 2011-08-04
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.970367
Longitude: -79.438561

For data sources see[1][2][3]

Well History

Date Event
2011-08-04 New Permit Application
2011-10-19 Performed Spud Operation
2011-10-25 Drilling Completion
2011-11-10 Perforation
2012-03-23 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 RIDGEVIEW GAS & OIL INC 172.00 14 0.00 0 0.00 0
2012 RIDGEVIEW GAS & OIL INC 3,846.00 365 0.00 0 0.00 0
2013 RIDGEVIEW GAS & OIL INC 2,920.00 365 0.00 0 0.00 0
2014 RIDGEVIEW GAS & OIL INC 2,545.00 365 0.00 0 0.00 0
2015 RIDGEVIEW GAS & OIL INC 2,545.00 365 0.00 0 0.00 0
2016 RIDGEVIEW GAS & OIL INC 1,954.00 365 0.00 0 0.00 0
2017 RIDGEVIEW GAS & OIL INC 1,758.00 365 0.00 0 0.00 0
2018 RIDGEVIEW GAS & OIL INC 1,610.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 RIDGEVIEW GAS & OIL INC Fracing Fluid Waste 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 RIDGEVIEW GAS & OIL INC Drilling Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1991836 Primary Facility 2011-07-27 Routine/Complete Inspection No Violations Noted < 200' from bldg. BOP Required
2012608 Primary Facility 2011-10-21 Drilling/Alteration No Violations Noted cement returns on 7"; Pit & E&S OK
2013037 Primary Facility 2011-10-20 Routine/Complete Inspection No Violations Noted Site had been constructed and erosion controls implemented as outlined in the E&S plan. Noted that the sidewalls for the drill pit located onsite were at approximately a 90 degree angle. In the future the Department recommends that the operator have the drill pit constructed so that the sidewalls be sloped instead of at a 90 degree angle with the bottom of the pit. Drilling had not commenced as of the time of the inspection.
2029893 Primary Facility 2011-12-29 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been regraded and it required temporary stabilization in accordance with 25 PA Code 102.22(b) until the next growing season.
2065370 Primary Facility 2012-05-03 Routine/Complete Inspection No Violations Noted Operating, ID OK