If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30877 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.674908,"lon":-79.588964,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Gilpin Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: | |
Farm/Lease Name: ROBERT D FRANK JR 1-1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-09-12 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.674908 | |
Longitude: -79.588964 |
Date | Event |
---|---|
2011-09-12 | New Permit Application |
2012-09-05 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 589.00 | 12 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 10,808.00 | 256 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 6,589.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 6,683.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 5,448.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 5,652.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 4,867.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 4,607.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | MDS ENERGY LTD | Fracing Fluid Waste | 975.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1997971 | Primary Facility | 2011-08-23 | Routine/Complete Inspection | No Violations Noted | 200' building inspection |
2097738 | Primary Facility | 2012-08-30 | Routine/Complete Inspection | No Violations Noted | Site construction had been completed. Site construction and E&S controls had been implemented as outlined in the approved E&S plan. All disturbed areas not stabilized with rock had been temporarily stabilized with seed & mulch. Entire access road and well pad had been rocked as outlined in the E&S plan. The operator should closely monitor the site and E&S controls to insure the site remains stable until well development activities are completed. |
2101351 | Primary Facility | 2012-09-19 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well site was in the process of being set up for well stimulation. All access road and site erosion controls had functioned properly during the precipitation on 09/18/12 and there was no evidence of accelerated erosion or sedimentation observed in relation to the access road or well-site. |
2103402 | Primary Facility | 2012-09-28 | Complaint Inspection | No Violations Noted | Drilling had been completed and a service rig was located onsite monitoring flowback operations. The frac impoundment and two baker tanks were located onsite. All erosion controls appeared to have been maintained and were functioning properly. There was no observed evidence of accelerated erosion or sedimentation in relation to the access road or well-site. There was evidence observed of sediment transport and deposit on the vegetation in the neighboring yards both abovestream and downstream the well-site indicating that the sediment transport and deposit was part of the normal runoff flow for the area. According to an onsite conversation with MDS personnel the well-site is to be reclaimed within the next 7-10 days. |
2108275 | Primary Facility | 2012-10-17 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, above grade frac impoundment was in the process of being emptied. Site was being prepped for for final grading and plumbing the well for production. It was noted that th esilt fencing located onsite will be replaced with silt sox until final restoration is completed. |
2248997 | Primary Facility | 2014-02-26 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been restored and the vegetative cover met the 70% uniform coverage criteria. |
2644503 | Primary Facility | 2017-10-06 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
For data sources see[7]