If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30889 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.797089,"lon":-79.633808,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: North Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 147574 | |
Farm/Lease Name: ROGER H CLAYPOOLE ETUX 2M-528 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-11-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.797089 | |
Longitude: -79.633808 |
Date | Event |
---|---|
2011-11-18 | New Permit Application |
2012-05-16 | Performed Spud Operation |
2012-06-06 | Drilling Completion |
2012-07-06 | Perforation |
2014-04-15 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-10 | 2012-07-10 | 6,709 | 156,801 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Super 100NE | Superior Well Services | Surfactant/Foamer | 2-Butoxyethanol | 111-76-2 | 7.00 | 0.69 | |
Isopropanol | 67-63-0 | 30.00 | 2.98 | |||||
ACID INHIBITOR 2 | Superior Well Services | Acid Corrosion Inhibitor | PROPRIETARY | 7.00 | 0.00513000 | |||
Propargyl alcohol | 107-19-7 | 30.00 | 0.02 | |||||
2-Butoxyethanol | 111-76-2 | 30.00 | 0.02 | |||||
Isopropanol | 67-63-0 | 30.00 | 0.02 | |||||
Hydrochloric Acid | Superior Well Services | Cement/Formation Breakdown | Hydrochloric acid | 7647-01-0 | 7.50 | 1.83 | ||
Water | 7732-18-5 | 92.50 | 22.59 | |||||
WFR-3B | Superior Well Services | Friction Reducer | Stoddard solvent | 8052-41-3 | 10.00 | 0.73 | ||
Ethoxylated C12-16 alcohols | 68551-12-2 | 4.00 | 0.29 | |||||
1,2-Propylene glycol | 57-55-6 | 25.00 | 1.83 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 2.20 | |||||
KR-153SL | Superior Well Services | Biocide | Diethylene glycol | 111-46-6 | 3.50 | 0.01 | ||
Ethylene glycol | 107-21-1 | 1.00 | 0.00366000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.07 | |||||
Polyethylene glycol | 25322-68-3 | 50.00 | 0.18 | |||||
SUPER TSC | Superior Well Services | Paraffin & Scale Additive | ANIONIC POLYMER | 10.00 | 0.03 | |||
1,2,4-Butanetricarboxylic acid, 2-phosphono- | 37971-36-1 | 10.00 | 0.03 | |||||
ANIONIC COPOLYMER | 10.00 | 0.03 | ||||||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.18 | |||||
SUPER TSC | Superior Well Services | Scale Control | ||||||
ICP-1000 | Superior Well Services | Iron Control Additive | ANIONIC COPOLYMER | 50.00 | 0.36 | |||
1,2-Propylene glycol | 57-55-6 | 50.00 | 0.36 | |||||
CLAY TREAT LT | Superior Well Services | Clay Control | Choline chloride | 67-48-1 | 80.00 | 0.03 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | SNYDER BROS INC | 37,687.00 | 135 | 0.00 | 0 | 0.00 | 0 |
2013 | SNYDER BROS INC | 52,012.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 33,491.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 26,184.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 21,355.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 17,165.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 14,246.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 13,644.00 | 355 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SNYDER BROS INC | Fracing Fluid Waste | 660.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | SNYDER BROS INC | Drill Cuttings | 109.00 Tons | ON SITE ENCAPSULATION | |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 1,020.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | SNYDER BROS INC | Produced Fluid | 245.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 1,510.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SNYDER BROS INC | Produced Fluid | 248.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2012 | SNYDER BROS INC | Drilling Fluid Waste | 880.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2012 | SNYDER BROS INC | Fracing Fluid Waste | 540.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2012 | SNYDER BROS INC | Drilling Fluid Waste | 2,060.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2012 | SNYDER BROS INC | Produced Fluid | 83.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2013 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | SNYDER BROS INC | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2016 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2019 | SNYDER BROS INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2061357 | Primary Facility | 2012-04-20 | Routine/Complete Inspection | No Violations Noted | Site inspection as a result of a spud notice received on 4/20/2012. At the time of inspection the site construction was finished. The site was temporarily stabilized with mulch. The silt socks were properly installed as outlined in the E&S plan. The Department suggests the Operator add additional clean durable rock behind the drill pit area to stabilize the collection ditch in the event of a precipitation event. At the time of inspection the site ID sign and drill permit were on site. The drill pit onsite was line and appeared to be in sound condition. |
2073127 | Primary Facility | 2012-05-31 | Drilling/Alteration | No Violations Noted | First Class Energy Rig#1 (#8) RD20 shut down at time of inspection. Pit lined and freeboard maintained. |
2130033 | Primary Facility | 2012-12-21 | Site Restoration | No Violations Noted | Site was drilled and equipped for production. No fluid leaks were evident. Brine tanks and production equipment appeared to be in good condition. No erosion or sedimentation issues were noted. The site has been re-graded to its approximate original topography and has greater than 70 percent uniform vegetative cover. |
2174073 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located on-site and they appeared to be in sound condition. Site had been properly restored and the vegetation met the 70% uniform coverage criteria. There was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road. |
2228497 | Primary Facility | 2013-12-10 | Routine/Complete Inspection | No Violations Noted | Tag, 2 tanks, e&s ok. |
2521757 | Primary Facility | 2016-09-23 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production and was properly tagged. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well-site vegetation had achieved 70% uniform vegetative cover. |
2675073 | Primary Facility | 2017-12-27 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, production set equipment and 2 grounded 100 bbl fiberglass tanks look ok. |
2701544 | Primary Facility | 2018-03-06 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. |
For data sources see[8]