If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31093 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.887942,"lon":-79.451492,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Boggs Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 146928 | |
Farm/Lease Name: GEORGE W COLWELL ETAL 2M-139 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-08-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.887942 | |
Longitude: -79.451492 |
Date | Event |
---|---|
2012-08-23 | New Permit Application |
2013-05-10 | Performed Spud Operation |
2013-05-22 | Drilling Completion |
2013-07-08 | Perforation |
2014-04-14 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-08 | 2013-07-09 | 6,698 | 159,439 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Ethoxylated Nonylphenol | 68412-54-4 | 13 | 0.000118 | 0 |
Isopropyl Alcohol | 67-63-0 | 40 | 0.000363 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 40 | 0.000363 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00009100 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000363 | 0 | ||||
ICP-1000 | Nabors Completion and Production Services | Iron Control Additives | Propylene glycol | 57-55-6 | 50 | 0.0057 | 0 | |
Anionic Copolymer | Proprietary | 50 | 0.0057 | 0 | ||||
Water | SNYDER BROTHERS INC | Water | Water | 7732-18-5 | 100 | 48.7565 | 0 | |
Super 100 NE | Nabors Completion and Production Services | Surfactants & Foamers | Isopropyl Alcohol | 67-63-0 | 40 | 0.052919 | 0 | |
Methanol | 67-56-1 | 15 | 0.019845 | 0 | ||||
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine |
68139-30-0 | 15 | 0.019845 | 0 | ||||
Glycol Ether | 111-76-2 | 5 | 0.006615 | 0 | ||||
HCL Acid (0%-7.5%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 7.5 | 0.011844 | 0 | |
Water | 7732-18-5 | 92.5 | 0.146072 | 0 | ||||
PA Specific 40/70 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Titanium Oxide | 13463-67-7 | 0.1 | 0.011836 | 0 | |
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 11.8242 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.130196 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.011836 | 0 | ||||
HCl Acid (12.5%-18.0%) | Nabors Completion and Production Services | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.028898 | 0 | |
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | Solvent | Proprietary | 1 | 0.001323 | 0 | |
Water | 7732-18-5 | 50 | 0.066149 | 0 | ||||
Phosphoric Acid | 7664-38-2 | 100 | 0.001323 | 0 | ||||
Water | 7732-18-5 | 40 | 0.038394 | 0 | ||||
Proprietary | Proprietary | 2 | 0.00192 | 0 | ||||
ammonium, (2-Hydroxyethyl)trimethyl-, chloride | 67-48-1 | 80 | 0.00053 | 0 | ||||
Proprietary | Proprietary | 100 | 0.132298 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000436 | 0 | ||||
Monoethanolamine | Proprietary | 100 | 0.001323 | 0 | ||||
Water | 7732-18-5 | 60 | 0.00308 | 0 | ||||
Water | 7732-18-5 | 80 | 0.004466 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 13 | 0.000118 | 0 | ||||
Dioxane | 123-91-1 | 1 | 0.00000900 | 0 | ||||
Polymer | Proprietary | 1 | 0.001323 | 0 | ||||
Proprietary | Proprietary | 1 | 0.001323 | 0 | ||||
Propylene glycol | 57-55-6 | 15 | 0.014398 | 0 | ||||
Alkyl Phosphate Ether | Proprietary | 1 | 0.001323 | 0 | ||||
Proprietary | Proprietary | 15 | 0.00077 | 0 | ||||
Demineralized Water | 7732-18-5 | 50 | 0.000331 | 0 | ||||
Proprietary | Proprietary | 50 | 0.002566 | 0 | ||||
Polymer | Proprietary | 10 | 0.01323 | 0 | ||||
Anionic Polyacrylamide | 910644-97-2 | 40 | 0.038394 | 0 | ||||
Water | 7732-18-5 | 87.5 | 0.140477 | 0 | ||||
Ammonium salts | Proprietary | 100 | 0.02646 | 0 | ||||
WFR-3B | Nabors Completion and Production Services | Friction Reducer | Hydrotreated light distillates, non-aromatic, BTEX free | 64742-47-8 | 30 | 0.028795 | 0 | |
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.004799 | 0 | ||||
Ethoxylated alcohols | 68002-97-1 | 15 | 0.014398 | 0 | ||||
Nitrogen per MSCF | Nabors Completion and Production Services | Nitrogen Materials | Nitrogen | 7727-37-9 | 100 | 32.3874 | 0 | |
PA Specific 30/50 mesh Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.44322 | 0 | |
Aluminum Oxide | 1344-28-1 | 1.1 | 0.070946 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00645 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00645 | 0 | ||||
KR-153SL | Nabors Completion and Production Services | Biocides | Polyethlyene-Glycol | 25322-68-3 | 50 | 0.002791 | 0 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.001116 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | SNYDER BROS INC | 27,878.00 | 140 | 0.00 | 0 | 0.00 | 0 |
2014 | SNYDER BROS INC | 36,120.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | SNYDER BROS INC | 24,060.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 17,488.00 | 344 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 13,949.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 13,899.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 12,585.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | SNYDER BROS INC | Drill Cuttings | 117.00 Tons | ON SITE ENCAPSULATION | |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 1,260.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
2013 | SNYDER BROS INC | Produced Fluid | 290.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | SNYDER BROS INC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 470.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 1,520.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW006 |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 380.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2013 | SNYDER BROS INC | Fracing Fluid Waste | 460.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | SNYDER BROS INC | Produced Fluid | 176.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | SNYDER BROS INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2016 | SNYDER BROS INC | Produced Fluid | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SNYDER BROS INC | Produced Fluid | 66.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | 66.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2018 | SNYDER BROS INC | Produced Fluid | 74.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2104691 | Primary Facility | 2012-10-03 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan. There were two issues with the controls as implemented. First the sediment trap installed at the end of the well-site collection ditch had disturbed area after the outflow of the trap. This would significantly reduce the effectiveness of the trap in minimizing the transport of sediment. Secondly the access road did not have enough culverts installed to effectively convey runoff off the access road. After a phone converstation with the operator and a field visit by the operator, the operator determined that a third culvert will be installed above the residence and measures will be implemented to insure that any runoff conveyed will not be directed toward the residence and the sediment trap will be extended so that it outlets to an undisturbed area. |
2106293 | Primary Facility | 2012-10-10 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan. The sediment trap implemented adjacent to the well pad had been extended out to the undisturbed area and an additional culvert had been implemented on the access road as discuessed via phone with a Snyder Brothers representative on 10/03/12. The E&S controls as implemented should effectively minimize accelerated erosion or sedimentation, provided the controls are properly maintained. |
2139598 | Primary Facility | 2013-02-12 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S controls had been implemented as outlined in the onsite E&S plan. There was no observed evidence of accelerated erosion or sedimentation in relation to the access road or well-site. |
2177840 | Primary Facility | 2013-06-25 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed. Drill pit located onsite and it contained fluids and drill cuttings. Drill pit had more than the required two feet of lined freeboard. There was no observed evidence of accelerated erosion or sedimentation in relation to the access road or well-site. |
2205355 | Primary Facility | 2013-09-18 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
2360271 | Primary Facility | 2015-04-10 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tanks located onsite and they appeared to be in sound condition. Site had been effectively restored and the vegetative cover met 70% uniform coverage. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
For data sources see[8]