X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31118

Well Details

Well ID: 37-005-31118
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 147130
Farm/Lease Name: BIBLICAL LIFE INSTITUTE
License Status: Active
Spud Date: 2013-03-19
Permit Date: 2013-01-23
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.743139
Longitude: -79.646708

For data sources see[1][2][3]

Well History

Date Event
2013-01-23 New Permit Application
2013-03-18 Performed Spud Operation
2013-03-26 Drilling Completion
2014-05-21 Perforation
2014-05-21 Performed Stage 1 of Stimulation
2014-05-22 Performed Stage 2 of Stimulation
2017-01-10 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-21 2014-05-22 6,830 170,130 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl Acid (12.5%-18.0%) Nabors Completion and Production Services Bulk Acid Hydrochloric Acid 7647-01-0 16 0.029401 0
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Glycol Ethers 111-46-6 40 0.000364 0
Isopropyl Alcohol 67-63-0 40 0.000364 0
Propargyl Alcohol 107-19-7 40 0.000364 0
Ethoxylated Nonylphenol 68412-54-4 13 0.000118 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00009100 0
Super TSC-LT Nabors Completion and Production Services Paraffin & Scale Additives Propylene Glycol 57-55-6 0 0 0
2 Phosphonobutane 1,2,4 tricarboxlyic acid 37971-36-1 0 0 0
ICP-1000 Nabors Completion and Production Services Iron Control Additives Propylene glycol 57-55-6 50 0.005352 0
Anionic Copolymer Proprietary 50 0.005352 0
KR-153SL Nabors Completion and Production Services Biocides 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.002389 0
Polyethlyene-Glycol 25322-68-3 50 0.005972 0
Super 100 NE Nabors Completion and Production Services Surfactants & Foamers Methyl Alcohol 67-56-1 15 0.018881 0
Isopropyl Alcohol 67-63-0 40 0.050349 0
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine
68139-30-0 15 0.018881 0
Glycol Ether 111-76-2 5 0.006294 0
Nitrogen per MSCF Nabors Completion and Production Services Nitrogen Materials Nitrogen 7727-37-9 100 28.6003 0
Water MDS Energy Development LLC Water Water 7732-18-5 100 52.104 0
Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Crystalline Silica, quartz 14808-60-7 99.9 18.6801 0
Other Ingredients Nabors Completion and Production Services Other Ingredients Proprietary Proprietary 50 0.00267246 0
Anionic Polyacrylamide 910644-97-2 40 0.0393014 0
Proprietary Proprietary 15 0.000801631 0
Dioxane 123-91-1 1 0.00000967 0
Monoethanolamine Proprietary 0.99 0.00134107 0
Water 7732-18-5 48 0.00045347 0
Proprietary Proprietary 2 0.00196539 0
Water 7732-18-5 40 0.0393014 0
Propylene glycol 57-55-6 15 0.0147378 0
Proprietary Proprietary 1 0.00135504 0
Polymer Proprietary 10 0.013545 0
ammonium, (2-Hydroxyethyl)trimethyl-, chloride 67-48-1 80 0.00055233 0
Alkyl Phosphate Ether Proprietary 1 0.00135504 0
Polymer Proprietary 1 0.00135504 0
Solvent Proprietary 1 0.00135504 0
Phosphoric Acid 7664-38-2 0.99 0.00134107 0
2-Butoxyethanol 111-76-2 13 0.000122501 0
Water 7732-18-5 50 0.0677271 0
Water 7732-18-5 80 0.00930042 0
Ammonium salts Proprietary 30 0.040636 0
Proprietary Proprietary 0.99 0.00134107 0
HCL Acid (0%-7.5%) Nabors Completion and Production Services Bulk Acid Hydrochloric Acid 7647-01-0 7 0.011362 0
WFR-3B Nabors Completion and Production Services Friction Reducer Propylene Glycol 57-55-6 25 0.02398 0
Hydrotreated light distillates, non-aromatic, BTEX free 64742-47-8 30 0.028776 0
Mineral Spirits 8052-41-3 10 0.009592 0
Ethoxylated Alcohols 68551-12-2 4 0.003837 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-05-21 1 Sand 106,512 5,411 5,715
2014-05-22 2 Sand 106,512 5,546 5,869

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 MDS ENERGY DEV LLC 0.00 0 0.00 0 0.00 0
2014 MDS ENERGY DEV LLC 41,807.00 150 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 38,936.90 360 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 12,725.60 159 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 24,448.40 327 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 17,867.00 352 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 14,520.00 323 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 MDS ENERGY LTD Produced Fluid 700.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006
2014 MDS ENERGY DEV LLC Fracing Fluid Waste 126.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 MDS ENERGY DEV LLC Fracing Fluid Waste 1,053.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2014 MDS ENERGY DEV LLC Fracing Fluid Waste 838.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 MDS ENERGY DEV LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 MDS ENERGY DEV LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2136274 Primary Facility 2013-02-05 Routine/Complete Inspection No Violations Noted Site was snow covered at time of this pre-operational inspection. Institution of BMPs as outlined in the on-site E&S plan appear adequate to preclude accelerated erosion or off-site transport of sedimentation. All perimeter controls specified in the E&S plan appeared to be properly installed. No erosion or sedimentation issues were noted.
2149814 Primary Facility 2013-03-19 Drilling/Alteration No Violations Noted Moving in on location in preparation to spud in well at time of inspection. First Class Energy rig#11 RD20. Pit lined and freeboard maintained.
2161285 Primary Facility 2013-04-24 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. Drill pit had been regraded.
2177158 Primary Facility 2013-06-21 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road.
2196973 Primary Facility 2013-08-19 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road.
2231746 Primary Facility 2013-12-23 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Well was not equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2275683 Primary Facility 2014-05-30 Routine/Complete Inspection No Violations Noted Well stimulation activities appeared to have been completed, well did not appear to be equipped for production. Seperator and brine tank apparatus located onsite. Site and access road controls had been implemented properly and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road.
2302119 Primary Facility 2014-09-09 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly regraded and restored. Vegetation had begun to take hold and appeared to meet 70% uniform vegetative cover.
2466911 Primary Facility 2016-03-21 Routine/Complete Inspection No Violations Noted Well is tagged-in production. Well head casing-production set-equipment-2-100 bbl tanks look ok.
2595533 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus shut. Well head casing-equipment-2 100 bbl fiberglass tanks look ok.
2766365 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and 2 grounded 100 bbl fiberglass fluid collection tanks look ok.
2821595 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok.

For data sources see[9]

References