If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31229 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.860683,"lon":-79.539183,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 151874 | |
Farm/Lease Name: AMBROSE | |
License Status: Active | |
Spud Date: 2015-03-11 | |
Permit Date: 2015-02-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.860683 | |
Longitude: -79.539183 |
Date | Event |
---|---|
2013-09-24 | Performed Stage 36 of Stimulation |
2013-09-24 | Performed Stage 37 of Stimulation |
2013-09-24 | Performed Stage 38 of Stimulation |
2013-09-25 | Performed Stage 39 of Stimulation |
2013-09-25 | Performed Stage 40 of Stimulation |
2013-09-25 | Performed Stage 41 of Stimulation |
2013-09-25 | Performed Stage 42 of Stimulation |
2015-02-23 | New Permit Application |
2015-03-11 | Performed Spud Operation |
2015-03-13 | Drilling Completion |
2015-04-22 | Drilling Completion |
2015-07-14 | Drilling Completion |
2015-08-18 | Perforation |
2015-09-10 | Perforation |
2015-09-10 | Performed Stimulation |
2015-09-11 | Perforation |
2015-09-11 | Performed Stage 1 of Stimulation |
2015-09-11 | Performed Stage 2 of Stimulation |
2015-09-12 | Perforation |
2015-09-12 | Performed Stage 3 of Stimulation |
2015-09-12 | Performed Stage 4 of Stimulation |
2015-09-12 | Performed Stage 5 of Stimulation |
2015-09-13 | Perforation |
2015-09-13 | Performed Stage 6 of Stimulation |
2015-09-13 | Performed Stage 7 of Stimulation |
2015-09-14 | Perforation |
2015-09-14 | Performed Stage 8 of Stimulation |
2015-09-14 | Performed Stage 9 of Stimulation |
2015-09-15 | Perforation |
2015-09-15 | Performed Stage 10 of Stimulation |
2015-09-15 | Performed Stage 11 of Stimulation |
2015-09-16 | Perforation |
2015-09-16 | Performed Stage 12 of Stimulation |
2015-09-16 | Performed Stage 13 of Stimulation |
2015-09-16 | Performed Stage 14 of Stimulation |
2015-09-17 | Perforation |
2015-09-17 | Performed Stage 15 of Stimulation |
2015-09-17 | Performed Stage 16 of Stimulation |
2015-09-18 | Perforation |
2015-09-18 | Performed Stage 17 of Stimulation |
2015-09-18 | Performed Stage 18 of Stimulation |
2015-09-18 | Performed Stage 19 of Stimulation |
2015-09-19 | Perforation |
2015-09-19 | Performed Stage 20 of Stimulation |
2015-09-19 | Performed Stage 21 of Stimulation |
2015-09-19 | Performed Stage 22 of Stimulation |
2015-09-20 | Perforation |
2015-09-20 | Performed Stage 23 of Stimulation |
2015-09-20 | Performed Stage 24 of Stimulation |
2015-09-20 | Performed Stage 25 of Stimulation |
2015-09-20 | Performed Stage 26 of Stimulation |
2015-09-21 | Perforation |
2015-09-21 | Performed Stage 27 of Stimulation |
2015-09-21 | Performed Stage 28 of Stimulation |
2015-09-22 | Perforation |
2015-09-22 | Performed Stage 29 of Stimulation |
2015-09-22 | Performed Stage 30 of Stimulation |
2015-09-22 | Performed Stage 31 of Stimulation |
2015-09-22 | Performed Stage 32 of Stimulation |
2015-09-23 | Perforation |
2015-09-23 | Performed Stage 33 of Stimulation |
2015-09-23 | Performed Stage 34 of Stimulation |
2015-09-23 | Performed Stage 35 of Stimulation |
2015-09-24 | Perforation |
2015-09-25 | Perforation |
2015-09-26 | Perforation |
2015-09-26 | Performed Stage 43 of Stimulation |
2015-09-26 | Performed Stage 44 of Stimulation |
2015-09-26 | Performed Stage 45 of Stimulation |
2015-09-27 | Perforation |
2015-09-27 | Performed Stage 46 of Stimulation |
2015-09-27 | Performed Stage 47 of Stimulation |
2015-09-27 | Performed Stage 48 of Stimulation |
2016-06-03 | Deviated |
2016-06-03 | Drilled Deeper |
2016-06-03 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-10 | 2015-09-27 | 6,482 | 14,708,900 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AI 600P | Weatherford | Acid Inhibitor | Alkyl Pyridine | 68391-11-7 | 1 | 0.00001543 | 21.276 |
Methanol | 67-56-1 | 2.5 | 0.00003857 | 53.191 | ||||
Nonyl Phenol Ethoxylate, Branched | 127087-87-0 | 15 | 0.000231391 | 319.147 | ||||
Pyridine, alkyl derives., quaternized with benzyl chloride | 68909-18-2 | 15 | 0.000231391 | 319.147 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000308521 | 425.53 | ||||
1-Octanol | 111-87-5 | 5 | 0.00007713 | 106.382 | ||||
1-Decanol | 112-30-1 | 5 | 0.00007713 | 106.382 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.000231391 | 319.147 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000617042 | 851.06 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00003857 | 53.191 | ||||
2-Butoxyethanol | 111-76-2 | 5 | 0.00007713 | 106.382 | ||||
Hydrochloric Acid (15%) | FSTI | Acid | HCL | 7647-01-0 | 15 | 0.0963488 | 132890 | |
Sand (Proppant) | Keane | Proppant | Crystalline Silica, Quartz | 14808-60-7 | 100 | 10.253 | 14,141,500.0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.000680847 | 939.063 | |
BIOCLEAR 2000 | Weatherford | Biocide | 2, 2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.00294147 | 4057.04 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00305012 | 4206.9 | |
LEB 10X | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00001289 | 17.776 | |
FFR 730 | Nalco | Friction Reducer | Oxyalkylated alcohol A | Proprietary | 5 | 0.00372818 | 5142.13 | |
SCALE CLEAR 125W | Weatherford | Scale Inhibitor | Phosphonomethylated polyamine, cmpd. with substituted amine Proprietary 5 - 15 |
Proprietary | 15 | 0.00107133 | 1477.64 | |
Ethylene Glycol | 107-21-1 | 60 | 0.00428532 | 5910.56 | ||||
Ammonium Chloride | 12125-02-9 | 2.5 | 0.000178555 | 246.273 | ||||
PGS-214 | Rockwater | Guar Slurry | PGS-214 | Proprietary | 100 | 0.000148511 | 204.835 | |
Water | Snyder Brothers Inc | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.9941 | 122,746,000.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-09-11 | 1 | Silica Sand | 14,708,904 | 8,487 | 9,211 |
2015-09-11 | 2 | Silica Sand | 14,708,904 | 8,284 | 8,576 |
2015-09-12 | 3 | Silica Sand | 14,708,904 | 7,920 | 8,791 |
2015-09-12 | 4 | Silica Sand | 14,708,904 | 8,059 | 8,433 |
2015-09-12 | 5 | Silica Sand | 14,708,904 | 7,929 | 8,386 |
2015-09-13 | 6 | Silica Sand | 14,708,904 | 7,810 | 8,174 |
2015-09-13 | 7 | Silica Sand | 14,708,904 | 8,363 | 8,847 |
2015-09-14 | 8 | Silica Sand | 14,708,904 | 7,727 | 8,401 |
2015-09-14 | 9 | Silica Sand | 14,708,904 | 8,044 | 8,426 |
2015-09-15 | 10 | Silica Sand | 14,708,904 | 8,222 | 8,448 |
2015-09-15 | 11 | Silica Sand | 14,708,904 | 8,235 | 8,654 |
2015-09-16 | 12 | Silica Sand | 14,708,904 | 8,283 | 8,648 |
2015-09-16 | 13 | Silica Sand | 14,708,904 | 8,164 | 8,705 |
2015-09-16 | 14 | Silica Sand | 14,708,904 | 8,350 | 8,913 |
2015-09-17 | 15 | Silica Sand | 14,708,904 | 8,232 | 8,543 |
2015-09-17 | 16 | Silica Sand | 14,708,904 | 8,059 | 8,419 |
2015-09-18 | 17 | Silica Sand | 14,708,904 | 7,643 | 8,383 |
2015-09-18 | 18 | Silica Sand | 14,708,904 | 7,458 | 7,800 |
2015-09-18 | 19 | Silica Sand | 14,708,904 | 7,596 | 8,283 |
2015-09-19 | 20 | Silica Sand | 14,708,904 | 7,524 | 8,424 |
2015-09-19 | 21 | Silica Sand | 14,708,904 | 7,358 | 7,746 |
2015-09-19 | 22 | Silica Sand | 14,708,904 | 7,336 | 8,099 |
2015-09-20 | 23 | Silica Sand | 14,708,904 | 7,682 | 8,252 |
2015-09-20 | 24 | Silica Sand | 14,708,904 | 7,544 | 7,873 |
2015-09-20 | 25 | Silica Sand | 14,708,904 | 7,600 | 7,990 |
2015-09-20 | 26 | Silica Sand | 14,708,904 | 7,456 | 8,751 |
2015-09-21 | 27 | Silica Sand | 14,708,904 | 7,685 | 8,868 |
2015-09-21 | 28 | Silica Sand | 14,708,904 | 7,758 | 8,441 |
2015-09-22 | 29 | Silica Sand | 14,708,904 | 7,728 | 8,762 |
2015-09-22 | 30 | Silica Sand | 14,708,904 | 7,310 | 7,813 |
2015-09-22 | 31 | Silica Sand | 14,708,904 | 7,298 | 7,650 |
2015-09-22 | 32 | Silica Sand | 14,708,904 | 7,381 | 8,182 |
2015-09-23 | 33 | Silica Sand | 14,708,904 | 7,735 | 7,735 |
2015-09-23 | 34 | Silica Sand | 14,708,904 | 7,291 | 7,948 |
2015-09-23 | 35 | Silica Sand | 14,708,904 | 7,306 | 8,214 |
2013-09-24 | 36 | Silica Sand | 14,708,904 | 7,267 | 8,012 |
2013-09-24 | 37 | Silica Sand | 14,708,904 | 7,128 | 7,564 |
2013-09-24 | 38 | Silica Sand | 14,708,904 | 6,991 | 8,126 |
2013-09-25 | 39 | Silica Sand | 14,708,904 | 7,097 | 7,932 |
2013-09-25 | 40 | Silica Sand | 14,708,904 | 7,451 | 7,810 |
2013-09-25 | 41 | Silica Sand | 14,708,904 | 7,285 | 8,364 |
2013-09-25 | 42 | Silica Sand | 14,708,904 | 7,092 | 8,011 |
2015-09-26 | 43 | Silica Sand | 14,708,904 | 7,593 | 8,808 |
2015-09-26 | 44 | Silica Sand | 14,708,904 | 7,045 | 7,410 |
2015-09-26 | 45 | Silica Sand | 14,708,904 | 6,882 | 8,583 |
2015-09-27 | 46 | Silica Sand | 14,708,904 | 6,867 | 7,334 |
2015-09-27 | 47 | Silica Sand | 14,708,904 | 7,059 | 7,653 |
2015-09-27 | 48 | Silica Sand | 14,708,904 | 7,062 | 7,943 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | SNYDER BROS INC | 180,116.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2016 | SNYDER BROS INC | 1,164,769.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SNYDER BROS INC | 1,203,689.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 995,758.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 497,132.00 | 235 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | SNYDER BROS INC | Fracturing Fluid Waste | 53.05 Tons | LANDFILL | 100585 |
2015 | SNYDER BROS INC | Produced Fluid | 1,180.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 4,000.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | SNYDER BROS INC | Drill Cuttings | 532.10 Tons | LANDFILL | SWF 1025 |
2015 | SNYDER BROS INC | Drill Cuttings | 707.59 Tons | LANDFILL | 100585 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 1,910.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3692 |
2015 | SNYDER BROS INC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 9,780.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 9,780.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Produced Fluid | 4,830.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | SNYDER BROS INC | Fracing Fluid Waste | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2015 | SNYDER BROS INC | Produced Fluid | 4,830.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | SNYDER BROS INC | Produced Fluid | 4,686.60 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | SNYDER BROS INC | Produced Fluid | 1,028.20 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2016 | SNYDER BROS INC | Produced Fluid | 1,383.11 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2016 | SNYDER BROS INC | Produced Fluid | 198.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3692 |
2016 | SNYDER BROS INC | Produced Fluid | 1,353.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | SNYDER BROS INC | Produced Fluid | 2,577.76 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | SNYDER BROS INC | Produced Fluid | 2,304.66 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | SNYDER BROS INC | Produced Fluid | 11,177.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SNYDER BROS INC | Produced Fluid | 4,686.60 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2017 | SNYDER BROS INC | Produced Fluid | 78.40 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2017 | SNYDER BROS INC | 7,501.72 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | Produced Fluid | 5,212.72 Bbl | REUSE (AT WELL PAD) | |
2017 | SNYDER BROS INC | 3,527.52 Bbl | REUSE (AT WELL PAD) | ||
2017 | SNYDER BROS INC | Produced Fluid | 1,027.30 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 9,509.06 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 1,003.10 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 12,567.60 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 230.20 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SNYDER BROS INC | Produced Fluid | 4,492.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 1,038.30 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2352698 | Primary Facility | 2015-03-16 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed,the impoundment was properly lined and it contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2354582 | Primary Facility | 2015-03-19 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence tophole drilling. |
2366656 | Primary Facility | 2015-04-24 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2366814 | Primary Facility | 2015-04-29 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. Department site visit w/WQS S. Foulk and C. Witham. |
2368646 | Primary Facility | 2015-05-11 | Routine/Complete Inspection | No Violations Noted | Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2377856 | Primary Facility | 2015-06-09 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2382197 | Primary Facility | 2015-06-22 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2390261 | Primary Facility | 2015-07-16 | Routine/Complete Inspection | No Violations Noted | Drill rig located onsite, drilling for Ambrose 5H was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2441961 | Primary Facility | 2016-01-20 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation. |
2442051 | Primary Facility | 2016-01-19 | Routine/Complete Inspection | No Violations Noted | 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok. |
2443547 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production units-equipment-tank battery-dike look ok. Contacted Operator to request that a new legible well ID tag be placed on the well. |
2480493 | Primary Facility | 2016-05-03 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation. |
2538008 | Primary Facility | 2016-11-18 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation. |
2583507 | Primary Facility | 2017-04-17 | Routine/Complete Inspection | No Violations Noted | Well tagged-on-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok. |
2589371 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids. |
2674089 | Primary Facility | 2017-12-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 4H drilled and appears equipped for production. Wells 2H, 1H, 3H, 5H, 6H also drilled and appear equipped for production. |
2683776 | Primary Facility | 2018-01-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 4H drilled and appears equipped for production. Wells 1H, 2H, 3H, 5H, 6H also drilled and appear equipped for production. |
2709922 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2771434 | Primary Facility | 2018-09-06 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment. |
2798052 | Primary Facility | 2018-11-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok. |
2821101 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2847436 | Primary Facility | 2019-02-26 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 401 psi and the casing pressure was 653 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad. |
For data sources see[9]