X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31229

Well Details

Well ID: 37-005-31229
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 151874
Farm/Lease Name: AMBROSE
License Status: Active
Spud Date: 2015-03-11
Permit Date: 2015-02-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.860683
Longitude: -79.539183

For data sources see[1][2][3]

Well History

Date Event
2013-09-24 Performed Stage 36 of Stimulation
2013-09-24 Performed Stage 37 of Stimulation
2013-09-24 Performed Stage 38 of Stimulation
2013-09-25 Performed Stage 39 of Stimulation
2013-09-25 Performed Stage 40 of Stimulation
2013-09-25 Performed Stage 41 of Stimulation
2013-09-25 Performed Stage 42 of Stimulation
2015-02-23 New Permit Application
2015-03-11 Performed Spud Operation
2015-03-13 Drilling Completion
2015-04-22 Drilling Completion
2015-07-14 Drilling Completion
2015-08-18 Perforation
2015-09-10 Perforation
2015-09-10 Performed Stimulation
2015-09-11 Perforation
2015-09-11 Performed Stage 1 of Stimulation
2015-09-11 Performed Stage 2 of Stimulation
2015-09-12 Perforation
2015-09-12 Performed Stage 3 of Stimulation
2015-09-12 Performed Stage 4 of Stimulation
2015-09-12 Performed Stage 5 of Stimulation
2015-09-13 Perforation
2015-09-13 Performed Stage 6 of Stimulation
2015-09-13 Performed Stage 7 of Stimulation
2015-09-14 Perforation
2015-09-14 Performed Stage 8 of Stimulation
2015-09-14 Performed Stage 9 of Stimulation
2015-09-15 Perforation
2015-09-15 Performed Stage 10 of Stimulation
2015-09-15 Performed Stage 11 of Stimulation
2015-09-16 Perforation
2015-09-16 Performed Stage 12 of Stimulation
2015-09-16 Performed Stage 13 of Stimulation
2015-09-16 Performed Stage 14 of Stimulation
2015-09-17 Perforation
2015-09-17 Performed Stage 15 of Stimulation
2015-09-17 Performed Stage 16 of Stimulation
2015-09-18 Perforation
2015-09-18 Performed Stage 17 of Stimulation
2015-09-18 Performed Stage 18 of Stimulation
2015-09-18 Performed Stage 19 of Stimulation
2015-09-19 Perforation
2015-09-19 Performed Stage 20 of Stimulation
2015-09-19 Performed Stage 21 of Stimulation
2015-09-19 Performed Stage 22 of Stimulation
2015-09-20 Perforation
2015-09-20 Performed Stage 23 of Stimulation
2015-09-20 Performed Stage 24 of Stimulation
2015-09-20 Performed Stage 25 of Stimulation
2015-09-20 Performed Stage 26 of Stimulation
2015-09-21 Perforation
2015-09-21 Performed Stage 27 of Stimulation
2015-09-21 Performed Stage 28 of Stimulation
2015-09-22 Perforation
2015-09-22 Performed Stage 29 of Stimulation
2015-09-22 Performed Stage 30 of Stimulation
2015-09-22 Performed Stage 31 of Stimulation
2015-09-22 Performed Stage 32 of Stimulation
2015-09-23 Perforation
2015-09-23 Performed Stage 33 of Stimulation
2015-09-23 Performed Stage 34 of Stimulation
2015-09-23 Performed Stage 35 of Stimulation
2015-09-24 Perforation
2015-09-25 Perforation
2015-09-26 Perforation
2015-09-26 Performed Stage 43 of Stimulation
2015-09-26 Performed Stage 44 of Stimulation
2015-09-26 Performed Stage 45 of Stimulation
2015-09-27 Perforation
2015-09-27 Performed Stage 46 of Stimulation
2015-09-27 Performed Stage 47 of Stimulation
2015-09-27 Performed Stage 48 of Stimulation
2016-06-03 Deviated
2016-06-03 Drilled Deeper
2016-06-03 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-10 2015-09-27 6,482 14,708,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI 600P Weatherford Acid Inhibitor Alkyl Pyridine 68391-11-7 1 0.00001543 21.276
Methanol 67-56-1 2.5 0.00003857 53.191
Nonyl Phenol Ethoxylate, Branched 127087-87-0 15 0.000231391 319.147
Pyridine, alkyl derives., quaternized with benzyl chloride 68909-18-2 15 0.000231391 319.147
Dimethylformamide 68-12-2 20 0.000308521 425.53
1-Octanol 111-87-5 5 0.00007713 106.382
1-Decanol 112-30-1 5 0.00007713 106.382
Cinnamaldehyde 104-55-2 15 0.000231391 319.147
Ethylene Glycol 107-21-1 40 0.000617042 851.06
Triethyl Phosphate 78-40-0 2.5 0.00003857 53.191
2-Butoxyethanol 111-76-2 5 0.00007713 106.382
Hydrochloric Acid (15%) FSTI Acid HCL 7647-01-0 15 0.0963488 132890
Sand (Proppant) Keane Proppant Crystalline Silica, Quartz 14808-60-7 100 10.253 14,141,500.0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.000680847 939.063
BIOCLEAR 2000 Weatherford Biocide 2, 2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.00294147 4057.04
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00305012 4206.9
LEB 10X Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00001289 17.776
FFR 730 Nalco Friction Reducer Oxyalkylated alcohol A Proprietary 5 0.00372818 5142.13
SCALE CLEAR 125W Weatherford Scale Inhibitor Phosphonomethylated polyamine,
cmpd. with substituted amine Proprietary 5 - 15
Proprietary 15 0.00107133 1477.64
Ethylene Glycol 107-21-1 60 0.00428532 5910.56
Ammonium Chloride 12125-02-9 2.5 0.000178555 246.273
PGS-214 Rockwater Guar Slurry PGS-214 Proprietary 100 0.000148511 204.835
Water Snyder Brothers Inc Carrier/Base Fluid Water 7732-18-5 100 88.9941 122,746,000.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-09-11 1 Silica Sand 14,708,904 8,487 9,211
2015-09-11 2 Silica Sand 14,708,904 8,284 8,576
2015-09-12 3 Silica Sand 14,708,904 7,920 8,791
2015-09-12 4 Silica Sand 14,708,904 8,059 8,433
2015-09-12 5 Silica Sand 14,708,904 7,929 8,386
2015-09-13 6 Silica Sand 14,708,904 7,810 8,174
2015-09-13 7 Silica Sand 14,708,904 8,363 8,847
2015-09-14 8 Silica Sand 14,708,904 7,727 8,401
2015-09-14 9 Silica Sand 14,708,904 8,044 8,426
2015-09-15 10 Silica Sand 14,708,904 8,222 8,448
2015-09-15 11 Silica Sand 14,708,904 8,235 8,654
2015-09-16 12 Silica Sand 14,708,904 8,283 8,648
2015-09-16 13 Silica Sand 14,708,904 8,164 8,705
2015-09-16 14 Silica Sand 14,708,904 8,350 8,913
2015-09-17 15 Silica Sand 14,708,904 8,232 8,543
2015-09-17 16 Silica Sand 14,708,904 8,059 8,419
2015-09-18 17 Silica Sand 14,708,904 7,643 8,383
2015-09-18 18 Silica Sand 14,708,904 7,458 7,800
2015-09-18 19 Silica Sand 14,708,904 7,596 8,283
2015-09-19 20 Silica Sand 14,708,904 7,524 8,424
2015-09-19 21 Silica Sand 14,708,904 7,358 7,746
2015-09-19 22 Silica Sand 14,708,904 7,336 8,099
2015-09-20 23 Silica Sand 14,708,904 7,682 8,252
2015-09-20 24 Silica Sand 14,708,904 7,544 7,873
2015-09-20 25 Silica Sand 14,708,904 7,600 7,990
2015-09-20 26 Silica Sand 14,708,904 7,456 8,751
2015-09-21 27 Silica Sand 14,708,904 7,685 8,868
2015-09-21 28 Silica Sand 14,708,904 7,758 8,441
2015-09-22 29 Silica Sand 14,708,904 7,728 8,762
2015-09-22 30 Silica Sand 14,708,904 7,310 7,813
2015-09-22 31 Silica Sand 14,708,904 7,298 7,650
2015-09-22 32 Silica Sand 14,708,904 7,381 8,182
2015-09-23 33 Silica Sand 14,708,904 7,735 7,735
2015-09-23 34 Silica Sand 14,708,904 7,291 7,948
2015-09-23 35 Silica Sand 14,708,904 7,306 8,214
2013-09-24 36 Silica Sand 14,708,904 7,267 8,012
2013-09-24 37 Silica Sand 14,708,904 7,128 7,564
2013-09-24 38 Silica Sand 14,708,904 6,991 8,126
2013-09-25 39 Silica Sand 14,708,904 7,097 7,932
2013-09-25 40 Silica Sand 14,708,904 7,451 7,810
2013-09-25 41 Silica Sand 14,708,904 7,285 8,364
2013-09-25 42 Silica Sand 14,708,904 7,092 8,011
2015-09-26 43 Silica Sand 14,708,904 7,593 8,808
2015-09-26 44 Silica Sand 14,708,904 7,045 7,410
2015-09-26 45 Silica Sand 14,708,904 6,882 8,583
2015-09-27 46 Silica Sand 14,708,904 6,867 7,334
2015-09-27 47 Silica Sand 14,708,904 7,059 7,653
2015-09-27 48 Silica Sand 14,708,904 7,062 7,943

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SNYDER BROS INC 180,116.00 31 0.00 0 0.00 0
2016 SNYDER BROS INC 1,164,769.00 366 0.00 0 0.00 0
2017 SNYDER BROS INC 1,203,689.00 365 0.00 0 0.00 0
2018 SNYDER BROS INC 995,758.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 497,132.00 235 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SNYDER BROS INC Fracturing Fluid Waste 53.05 Tons LANDFILL 100585
2015 SNYDER BROS INC Produced Fluid 1,180.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Fracing Fluid Waste 4,000.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Drill Cuttings 532.10 Tons LANDFILL SWF 1025
2015 SNYDER BROS INC Drill Cuttings 707.59 Tons LANDFILL 100585
2015 SNYDER BROS INC Fracing Fluid Waste 1,910.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2015 SNYDER BROS INC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 SNYDER BROS INC Fracing Fluid Waste 9,780.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 9,780.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 4,830.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 210.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 SNYDER BROS INC Produced Fluid 4,830.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 4,686.60 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 1,028.20 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 SNYDER BROS INC Produced Fluid 1,383.11 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 198.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2016 SNYDER BROS INC Produced Fluid 1,353.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SNYDER BROS INC Produced Fluid 2,577.76 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 SNYDER BROS INC Produced Fluid 2,304.66 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Produced Fluid 11,177.94 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Produced Fluid 4,686.60 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 SNYDER BROS INC Produced Fluid 78.40 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 SNYDER BROS INC 7,501.72 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 5,212.72 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 3,527.52 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Produced Fluid 1,027.30 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 9,509.06 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 1,003.10 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 12,567.60 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 230.20 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 4,492.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,038.30 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2352698 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed,the impoundment was properly lined and it contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2354582 Primary Facility 2015-03-19 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2366656 Primary Facility 2015-04-24 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2366814 Primary Facility 2015-04-29 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling. Department site visit w/WQS S. Foulk and C. Witham.
2368646 Primary Facility 2015-05-11 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2377856 Primary Facility 2015-06-09 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2382197 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2390261 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted Drill rig located onsite, drilling for Ambrose 5H was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2441961 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2442051 Primary Facility 2016-01-19 Routine/Complete Inspection No Violations Noted 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok.
2443547 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production units-equipment-tank battery-dike look ok. Contacted Operator to request that a new legible well ID tag be placed on the well.
2480493 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2538008 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2583507 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok.
2589371 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2674089 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection, well 4H drilled and appears equipped for production. Wells 2H, 1H, 3H, 5H, 6H also drilled and appear equipped for production.
2683776 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 4H drilled and appears equipped for production. Wells 1H, 2H, 3H, 5H, 6H also drilled and appear equipped for production.
2709922 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2771434 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment.
2798052 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok.
2821101 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2847436 Primary Facility 2019-02-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 401 psi and the casing pressure was 653 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad.

For data sources see[9]

References