37-007-20399

Well Details

Well ID: 37-007-20399
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 145779
Farm/Lease Name: B2 PER B2-1H
License Status: Active
Spud Date: 2014-06-11
Permit Date: 2013-07-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.721764
Longitude: -80.164781

For data sources see[1][2][3]

Well History

Date Event
2013-07-10 New Permit Application
2014-06-11 Performed Spud Operation
2015-05-07 New Permit Application
2015-06-25 Drilling Completion
2015-09-01 New Permit Application
2016-09-01 Permit Renewal Application
2020-01-29 Deviated
2020-01-29 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-19 2017-01-06 5,191 11,509,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00000182 2.036
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00411007 4598.43
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 9.98625 11,172,800.0
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 87.5559 97,959,200.0
Unigel 5F PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.000335175 375
Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0278364 31143.9
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.00071123 795.737
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00426738 4774.43
Polyethylene Glycol 25322-68-3 60 0.00853475 9548.85
Unihib G GeoSafe Acid Corrosion Inhibitor Thiourea 62-56-6 1 0.00000742 8.304
Formaldehyde 50-00-0 1 0.00000742 8.304
Glycol Ether 112-34-5 60 0.000445332 498.247
Methanol 67-56-1 5 0.00003711 41.521
Acetophenone 98-86-2 1 0.00000742 8.304
Ethoxylated Alcohol 68002-97-1 35 0.000259777 290.644
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.930438 1,040,990.0
Other Chemical(s) Listed Above See Trade Name(s) List Formaldehyde 50-00-0 1 0.00000742 8.304
Polyethylene Glycol 25322-68-3 60 0.00853475 9548.85
Acetophenone 98-86-2 1 0.00000742 8.304
Thiourea 62-56-6 1 0.00000742 8.304
Methanol 67-56-1 5 0.00003711 41.521
Ethoxylated Alcohol 68002-97-1 35 0.000259777 290.644
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00426738 4774.43

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2017 PENNENERGY RESOURCES LLC 784,706.00 287 0.00 0 5,381.00 287
2018 PENNENERGY RESOURCES LLC 771,575.00 354 0.00 0 4,487.00 354
2019 PENNENERGY RESOURCES LLC 634,535.00 355 0.00 0 2,520.00 355

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 PENNENERGY RESOURCES LLC Drill Cuttings 215.24 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,645.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2016 PENNENERGY RESOURCES LLC Drilling Fluid Waste 102.86 Bbl REUSE OTHER THAN ROAD SPREADING
2016 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,645.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 25.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Drill Cuttings 646.50 Tons LANDFILL CID # 28726
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 112.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 5.34 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC 25.47 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC 112.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Produced Fluid 15.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 15.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 25.47 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 37.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 21,191.83 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Synthetic Liner Materials 21.63 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Produced Fluid 7.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Produced Fluid 25,787.64 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 116.60 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 3,979.35 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Servicing Fluid 20.33 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 45.27 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 46.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 114.35 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,667.46 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 549.80 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2225191 Primary Facility 2013-11-26 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2278565 Primary Facility 2014-06-11 Drilling/Alteration No Violations Noted ROCKY MOUNTAIN DRILLING IS INSTALLING THE CELLAR FOR THIS WELL. 40' OF CONDUCTOR PIPE WILL BE CEMENTED. THE SITE IS IN GOOD CONDITION.
2287530 Primary Facility 2014-07-02 Drilling/Alteration No Violations Noted THE CONDUCTOR IS IN. THE WATER IMPOUNDMENT IS BEING LINED. THE SITE IS IN GOOD CONDITION.
2288219 Primary Facility 2014-06-25 Drilling/Alteration No Violations Noted THE CONDUCTOR IS IN. THERE IS NO EQUIPTMENT ON THE PAD.
2288222 Primary Facility 2014-06-11 Drilling/Alteration No Violations Noted ROCKY MOUNTAIN IS INSTALLING THE CELLAR FOT THIS WELL. 40' OF 16" CONDUCTOR WILL THEN BE CEMENTED.
2288875 Primary Facility 2014-06-24 Routine/Complete Inspection No Violations Noted Inspection of this well was concurrent with site inspection. This well targeting the Burkett Shale layer had conductor set, but tophole had not yet been drilled. Cellar was covered by a metal plate. Impoundment was constructed but not lined. Well was properly labeled. All perimeter controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. No erosion or sedimentation issues were apparent.
2381571 Primary Facility 2015-06-23 Drilling/Alteration No Violations Noted HIGHLANDS RIG 9 DRILLED TO 800'. THEY ARE PULLING THE DRILL RODS THEN WILL RUN THIER 113/4" CASING.
2386502 Primary Facility 2015-07-07 Routine/Complete Inspection No Violations Noted
2439224 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted
2480559 Primary Facility 2016-04-22 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE. THE SITE IS IN GOOD CONDITION. INACTIVE STATUS IS PENDING FOR THE WELLS ON THIS PAD.
2518540 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted
2528239 Primary Facility 2016-10-07 Routine/Complete Inspection No Violations Noted
2534416 Primary Facility 2016-10-24 Drilling/Alteration No Violations Noted HIGHLANDS DRILLED THE TOP HOLE OF THIS WELL. PATTERSON IS SETTING UP TO DRILL THE BOTTOM PORTION.

THE SITE IS IN GOOD CONDITION.

2548176 Primary Facility 2016-10-31 Drilling/Alteration No Violations Noted PATTERSON 259 RAN 11,063' OF 5.5" CASING. THE RIG IS DOWN WAITING ON HALIBURTON CEMENTERS.

THE SITE IS IN GOOD CONDITION.

2556724 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted On 1/31/2017, WQS Brian MacQuarrie onsite at unconventional well site. Stimulation activities currently underway. Fracing completed at wells B2-1HUD (Permit No. 37-007-20399) and B2-3H (Permit No. 37-007-20397). Fracing operations continuing at B2-2HUD (Permit No. 37-007-20400) and B2-4H (Permit No. 37-007-20398). Temporary AST onsite to aid with stimulation activities. Secondary containment setup around wells. Two 400 bbl production tanks installed within secondary steel containment structure. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation best management practices installed and maintained. No apparent E/S issues. Snow on ground during inspection.
2561401 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Stimulation activities concluded on Four wells. Equipment moving to B8 well site. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment maintained onsite. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues.
2579566 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted On 4/6/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Four wells in production. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment maintained onsite. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues.
2596956 Primary Facility 2017-05-24 Routine/Complete Inspection No Violations Noted On 5/24/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Four wells in production. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment setup around frac tank. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues.
2624774 Primary Facility 2017-08-11 Routine/Complete Inspection No Violations Noted On 8/11/2017, WQS Brian MacQuarrie onsite to conduct inspection of unconventional well site. Four wells in production. Freshwater impoundment maintained, lined and fenced in. Vegetative cover well established in previously disturbed areas. Erosion and Sedimentation best management practices maintained.
2646725 Primary Facility 2017-10-11 Routine/Partial Inspection No Violations Noted This well and the pad are in good condition.
2666311 Primary Facility 2017-12-01 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two production fluid tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment was located onsite and it was holding freshwater with significant algae growth.
2684128 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. Evaluation of erosion control functionality and maintenance was not feasible due to snow and ice conditions. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it was observed to contain frozen fluids and snow.
2756197 Primary Facility 2018-07-26 Routine/Complete Inspection No Violations Noted This well has been well maintained. The pad is in good condition.
2853874 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]

References