If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-007-20412 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.760197,"lon":-80.167083,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: New Sewickley Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 150486 | |
Farm/Lease Name: B3 PER B3-2H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-11-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.760197 | |
Longitude: -80.167083 |
Date | Event |
---|---|
2013-11-12 | New Permit Application |
2014-04-10 | Performed Spud Operation |
2014-05-04 | Drilling Completion |
2014-09-13 | Drilling Completion |
2015-04-14 | Perforation |
2015-06-04 | Newly Drilled |
2016-01-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-05-04 | 2015-05-15 | 5,301 | 10,448,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Hib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00313408 | 3246.14 |
Sand (Proppant) | Sargent | Proppant | Silica | 14808-60-7 | 99.9 | 12.1214 | 12,554,800.0 | |
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00313544 | 3247.54 | |
Water | PennEnergy Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.7841 | 88,851,200.0 | |
LEB 10X | Weatherford | Gel Breaker | Ethylene Glycol | 107-21-1 | 40 | 0.00001219 | 12.624 | |
EC6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00577223 | 5978.61 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.0115445 | 11957.2 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.000962038 | 996.435 | ||||
Unislik ST50 | CESI | Friction Reducer | Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 30 | 0.0235688 | 24411.5 | |
Unihib G | GeoSafe | Acid Corrosion Inhibitor | Thiourea | 62-56-6 | 1 | 0.00000652 | 6.752 | |
Glycol Ether | 112-34-5 | 60 | 0.000391132 | 405.116 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.00022816 | 236.318 | ||||
Methanol | 67-56-1 | 5 | 0.00003259 | 33.76 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000652 | 6.752 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000652 | 6.752 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrogen Chloride | 7647-01-0 | 40 | 0.784691 | 812747 | |
WGA-3 | PfP Technology | Water Viscosifier | Guar Gum | 9000-30-0 | 100 | 0.00120685 | 1250 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNENERGY RESOURCES LLC | 377,255.00 | 105 | 0.00 | 0 | 2,513.00 | 105 |
2016 | PENNENERGY RESOURCES LLC | 852,397.00 | 366 | 0.00 | 0 | 3,970.00 | 366 |
2017 | PENNENERGY RESOURCES LLC | 626,046.00 | 327 | 0.00 | 0 | 2,726.00 | 327 |
2018 | PENNENERGY RESOURCES LLC | 573,675.00 | 349 | 0.00 | 0 | 2,320.00 | 349 |
2019 | PENNENERGY RESOURCES LLC | 522,697.00 | 345 | 0.00 | 0 | 1,669.00 | 345 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 745.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2014 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 745.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2014 | PENNENERGY RESOURCES LLC | Drill Cuttings | 568.76 Tons | LANDFILL | CID # 28726 |
2015 | PENNENERGY RESOURCES LLC | Fracturing Fluid Waste | 61.17 Tons | LANDFILL | CID # 28726 |
2015 | PENNENERGY RESOURCES LLC | Servicing Fluid | 12.00 Bbl | LANDFILL | CID # 28726 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 209.81 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 393.90 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 870.31 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 853.45 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 12,134.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 209.81 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2017 | PENNENERGY RESOURCES LLC | 14.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 2,744.96 Bbl | REUSE (AT WELL PAD) | |
2017 | PENNENERGY RESOURCES LLC | 1,781.15 Bbl | REUSE (AT WELL PAD) | ||
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 14.30 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,157.10 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 28.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 29.35 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 82.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,989.30 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 25.18 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2260622 | Primary Facility | 2014-04-08 | Preoperation Inspection | No Violations Noted | This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1. |
2267279 | Primary Facility | 2014-04-21 | Routine/Complete Inspection | No Violations Noted | The conductor was set for this well targeting the either the Genesee or the Marcellus layer. The inspection for this well was conducted concurrently with the inspection for site number 776908 (inspection report # 2267205). The water impoundment was under construction at time of inspection. All E&S controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. No erosion or sedimentation issues were noted. |
2274999 | Primary Facility | 2014-04-16 | Drilling/Alteration | No Violations Noted | THE CONDUCTOR IS IN. A SOUND WALL IS BEING BUILT. STILL WORKING ON THE PAD. |
2275010 | Primary Facility | 2014-05-06 | Drilling/Alteration | No Violations Noted | HIGHLANDS 7 COMPLETED TOP HOLE AT 2,278'. THE SITE IS OK. |
2275014 | Primary Facility | 2014-04-23 | Drilling/Alteration | No Violations Noted | ROCKY MOUNTAIN DRILLING HAS INSTALLED 40' OF 20" CONDUCTOR PIPE. THE SITE IS OK. |
2276862 | Primary Facility | 2014-05-23 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. RIG HAS MOVED FROM THE SITE. |
2276911 | Primary Facility | 2014-06-03 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. ALL EQUIPTMENT REMOVED. PROTECTIVE COVER IS STILL DOWN. |
2288975 | Primary Facility | 2014-06-12 | Routine/Complete Inspection | No Violations Noted | The tophole was drilled for this well targeting the Genesee layer. The inspection for this well was conducted concurrently with the inspection for site number 776908. The water impoundment was constructed but not lined at time of inspection. All E&S controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. A moderate slip was noted on the topsoil pile but adequate vegetative growth and E&S controls appeared to prevent off-site transport of sediment. |
2297592 | Primary Facility | 2014-08-22 | Routine/Complete Inspection | No Violations Noted | The well targets the Genesee layer. The inspection for this well was conducted concurrently with the inspection for site number 776908. Well was properly labeled. Topsoil pile had adequate vegetative growth. E&S controls were sufficient to prevent off-site transport of sediment. Damp area was noted at corner of containment. Department requests operator ensure containment is adequate to contain residual waste. |
2307359 | Primary Facility | 2014-09-11 | Drilling/Alteration | No Violations Noted | PATTERSON 259 DRILLING HORIZONTAL LEG AT 10,344'. |
2350395 | Primary Facility | 2015-01-20 | Complaint Inspection | No Violations Noted | |
2361481 | Primary Facility | 2015-04-10 | Routine/Complete Inspection | No Violations Noted | |
2365873 | Primary Facility | 2015-04-28 | Routine/Complete Inspection | No Violations Noted | |
2372368 | Primary Facility | 2015-04-02 | Drilling/Alteration | No Violations Noted | THIS WELL HAS BEEN PRESURE TESTED BUT NOT FRACED. AN ABOVE GROUND TANK HAS BEEN CONSTRUCTED, AND A FRESH WATER IMPOUNDMENT IS NEARLY FULL. |
2374344 | Primary Facility | 2015-05-26 | Routine/Complete Inspection | No Violations Noted | |
2381764 | Primary Facility | 2015-06-19 | Routine/Complete Inspection | No Violations Noted | |
2383239 | Primary Facility | 2015-06-29 | Drilling/Alteration | No Violations Noted | THIS WELL IS FRACED AND SHUT-IN. |
2396615 | Primary Facility | 2015-08-04 | Drilling/Alteration | No Violations Noted | FLOWBACK IS COMPLETE. THE PAD IS COVERED AND IN GOOD CONDITION. |
2436856 | Primary Facility | 2015-12-29 | Routine/Complete Inspection | No Violations Noted | |
2449371 | Primary Facility | 2016-01-20 | Routine/Complete Inspection | No Violations Noted | THIS WELL IS DRILLED, FRACED, AND PRODUCING.
THE SITE AND PRODUCTION EQUIPTMENT ARE IN GOOD CONDITION. |
2481819 | Primary Facility | 2016-04-26 | Routine/Complete Inspection | No Violations Noted | THIS WELL HAS BEEN COMPLETED AND IS NOW PRODUCING.
THE SITE IS IN GOOD CONDITION. |
2561316 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | On 2/14/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign installed and maintained. Freshwater impoundment installed and fenced in. Four wells in production. Two four hundred bbl tanks installed and maintained within secondary steel containment structure. Erosion and Sedimentation Best Management practices installed and maintained. Site stabilized in previously disturbed areas around pad and access road with vegetative growth. No apparent E/S issues. |
2665297 | Primary Facility | 2017-11-29 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluid tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Freshwater impoundment located onsite and it contained what appeared to be freshwater. |
2686192 | Primary Facility | 2018-01-12 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined within the E&S Plan contained within the ESCGP. All erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Two brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained fluids. |
2856223 | Primary Facility | 2019-03-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. GPUs within secondary containment. No E&S issues. |
For data sources see[8]