If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-007-20427 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.780067,"lon":-80.215769,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: Marion Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 150855 | |
Farm/Lease Name: B4 PER B4-4H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.780067 | |
Longitude: -80.215769 |
Date | Event |
---|---|
2014-03-24 | New Permit Application |
2014-08-07 | Performed Spud Operation |
2015-05-17 | Drilling Completion |
2015-08-27 | Perforation |
2016-04-28 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-26 | 2015-09-04 | 5,264 | 12,189,900 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Unihib G | GeoSafe | Acid Corrosion Inhibitor | Formaldehyde | 50-00-0 | 1 | 0.00000698 | 8.304 |
Acetophenone | 98-86-2 | 1 | 0.00000698 | 8.304 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.000244228 | 290.644 | ||||
Methanol | 67-56-1 | 5 | 0.00003489 | 41.521 | ||||
Glycol Ether | 112-34-5 | 60 | 0.000418676 | 498.247 | ||||
Thiourea | 62-56-6 | 1 | 0.00000698 | 8.304 | ||||
Sand (Proppant) | Sargent | Proppant | Silica | 14808-60-7 | 99.9 | 11.3201 | 13,471,500.0 | |
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00301669 | 3590.02 | |
Water | PennEnergy Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.4195 | 102,844,000.0 | |
LEB 10X | Weatherford | Gel Breaker | Ethylene Glycol | 107-21-1 | 40 | 0.00001540 | 18.326 | |
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.0195811 | 23302.6 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00163176 | 1941.88 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00979056 | 11651.3 | ||||
WGA-3 | PfP Technology | Water Viscosifier | Guar Gum | 9000-30-0 | 100 | 0.00134448 | 1600 | |
Unislik ST50 | CESI | Friction Reducer | Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 30 | 0.0243818 | 29015.7 | |
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrogen Chloride | 7647-01-0 | 40 | 0.844872 | 1,005,440.0 | |
Scale Hib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00324203 | 3858.19 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNENERGY RESOURCES LLC | 134,822.00 | 32 | 0.00 | 0 | 1,388.00 | 32 |
2016 | PENNENERGY RESOURCES LLC | 583,908.00 | 340 | 0.00 | 0 | 4,968.00 | 340 |
2017 | PENNENERGY RESOURCES LLC | 461,452.00 | 345 | 0.00 | 0 | 4,860.00 | 345 |
2018 | PENNENERGY RESOURCES LLC | 306,009.00 | 324 | 0.00 | 0 | 3,341.00 | 324 |
2019 | PENNENERGY RESOURCES LLC | 267,909.00 | 335 | 0.00 | 0 | 1,576.00 | 335 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | PENNENERGY RESOURCES LLC | Drill Cuttings | 377.57 Tons | LANDFILL | CID # 28726 |
2015 | PENNENERGY RESOURCES LLC | Drill Cuttings | 714.07 Tons | LANDFILL | CID # 28726 |
2015 | PENNENERGY RESOURCES LLC | Fracturing Fluid Waste | 30.69 Tons | LANDFILL | CID # 28726 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 582.93 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 344.24 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 52.26 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 9,466.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | PENNENERGY RESOURCES LLC | 7.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 | |
2017 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 17.07 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | PENNENERGY RESOURCES LLC | Servicing Fluid | 7.88 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 36.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | PENNENERGY RESOURCES LLC | 36.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2017 | PENNENERGY RESOURCES LLC | 6,130.32 Bbl | REUSE (AT WELL PAD) | ||
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 6,973.23 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 30.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,448.02 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 48.62 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 103.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 47.98 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 50.88 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 2,072.13 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 73.44 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2276803 | Primary Facility | 2014-05-28 | Preoperation Inspection | No Violations Noted | This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1. |
2296847 | Primary Facility | 2014-08-06 | Drilling/Alteration | No Violations Noted | THE CELLAR IS IN AND THE CONDUCTOR WILL BE INSTALLED 8/7/14 |
2305450 | Primary Facility | 2014-09-03 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE AT 2,035. THE RIG IS BEING MOVED. SITE IS OK. |
2361500 | Primary Facility | 2015-04-13 | Routine/Complete Inspection | No Violations Noted | |
2369340 | Primary Facility | 2015-04-02 | Drilling/Alteration | No Violations Noted | THE WELL PAD IS COVERED AND READY FOR A RIG. |
2374357 | Primary Facility | 2015-05-26 | Routine/Complete Inspection | No Violations Noted | |
2378738 | Primary Facility | 2015-05-20 | Drilling/Alteration | No Violations Noted | PATTERSON RAN PRODUCTION CASING, AND IS MOVING OUT. THE PAD IS BEING CLEANED. |
2378742 | Primary Facility | 2015-05-07 | Drilling/Alteration | No Violations Noted | PATTERSON 259 HAS MOVED OVER THIS HOLE TO DRILL THE BOTTOM SECTION. DRILLING HAS NOT STARTED. |
2381926 | Primary Facility | 2015-06-23 | Drilling/Alteration | No Violations Noted | RENEGADE SERVICES IS ON THE SITE TO RUN BOND LOGS. |
2381930 | Primary Facility | 2015-05-28 | Drilling/Alteration | No Violations Noted | THE RIG AND EQUIPTMENT ARE GONE. THE PAD IS BEING CLEANED. |
2386516 | Primary Facility | 2015-07-07 | Routine/Complete Inspection | No Violations Noted | |
2401593 | Primary Facility | 2015-08-24 | Routine/Complete Inspection | No Violations Noted | |
2402717 | Primary Facility | 2015-08-18 | Drilling/Alteration | No Violations Noted | UNIVERSAL HAS STARTED STIMULATION ACTIVITY THIS MORNING. |
2410054 | Primary Facility | 2015-08-26 | Drilling/Alteration | No Violations Noted | THIS WELL IS BEING FRACED. |
2410064 | Primary Facility | 2015-09-16 | Drilling/Alteration | No Violations Noted | THIS WELL HAS BEEN FRACED. THE PLUGS ARE DRILLED OUT AND THE WELL IS READY FOR FLOWBACK. |
2410080 | Primary Facility | 2015-09-09 | Drilling/Alteration | No Violations Noted | FRACING IS COMPLETE. THE SITE IS BEING SET UP FOR FLOWBACK. |
2410605 | Primary Facility | 2015-09-25 | Drilling/Alteration | No Violations Noted | crews are preparing the site for flowback. |
2439219 | Primary Facility | 2016-01-04 | Routine/Complete Inspection | No Violations Noted | |
2451647 | Primary Facility | 2016-02-18 | Drilling/Alteration | No Violations Noted | THIS WELL IS BEING PREPARED FOR VELOCITY TUBING.
THE SITE IS IN GOOD CONDITION. |
2461563 | Primary Facility | 2016-02-23 | Drilling/Alteration | No Violations Noted | TUBING HAS BEEN PUT IN THIS WELL. THE RIG IS GONE.
THE SITE IS IN GOOD CONDITION. |
2478954 | Primary Facility | 2016-04-22 | Routine/Complete Inspection | No Violations Noted | |
2501632 | Primary Facility | 2016-07-11 | Routine/Complete Inspection | No Violations Noted | |
2518538 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | |
2542670 | Primary Facility | 2016-11-17 | Routine/Complete Inspection | No Violations Noted | |
2555798 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | On 1/27/2017, WQS Brian MacQuarrie onsite at unconventional well site. Meet with Ken Ditty- onsite manager. Deep Well Services onsite fishing coil out of 3H. Four wells drilled and fraced. Secondary containment setup around wells, six frac tanks and two permanent 400 bbl production tanks. AST onsite containing impaired water. Erosion and Sedimentation best management practices installed and maintained. Site stabilized with perrenial vegetative growth. No apparent E/S issues. |
2561234 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | On 2/14/17, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign and Erosion and Sedimentation Plan onsite in mailbox. Four wells in production. Two four bbl production tanks installed within secondary steel containment structure. AST set up on pad that was used to store impaired water and used for well stimulation activities. Frac tanks onsite within secondary containment. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas well vegetated. No apparent E/S issues. |
2666430 | Primary Facility | 2017-12-01 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluids tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition. |
2687654 | Primary Facility | 2018-01-29 | Routine/Complete Inspection | No Violations Noted | Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). |
2756409 | Primary Facility | 2018-07-26 | Routine/Complete Inspection | No Violations Noted | This well is in good condition. The pad is clean and has been well maintained. The pad is fenced and locked. |
For data sources see[8]