37-007-20427

Well Details

Well ID: 37-007-20427
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 150855
Farm/Lease Name: B4 PER B4-4H
License Status:
Spud Date:
Permit Date: 2014-03-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.780067
Longitude: -80.215769

For data sources see[1][2][3]

Well History

Date Event
2014-03-24 New Permit Application
2014-08-07 Performed Spud Operation
2015-05-17 Drilling Completion
2015-08-27 Perforation
2016-04-28 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-26 2015-09-04 5,264 12,189,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unihib G GeoSafe Acid Corrosion Inhibitor Formaldehyde 50-00-0 1 0.00000698 8.304
Acetophenone 98-86-2 1 0.00000698 8.304
Ethoxylated Alcohol 68002-97-1 35 0.000244228 290.644
Methanol 67-56-1 5 0.00003489 41.521
Glycol Ether 112-34-5 60 0.000418676 498.247
Thiourea 62-56-6 1 0.00000698 8.304
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.3201 13,471,500.0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00301669 3590.02
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.4195 102,844,000.0
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00001540 18.326
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.0195811 23302.6
Dibromoacetonitrile 3252-43-5 5 0.00163176 1941.88
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00979056 11651.3
WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.00134448 1600
Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0243818 29015.7
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.844872 1,005,440.0
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00324203 3858.19

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 134,822.00 32 0.00 0 1,388.00 32
2016 PENNENERGY RESOURCES LLC 583,908.00 340 0.00 0 4,968.00 340
2017 PENNENERGY RESOURCES LLC 461,452.00 345 0.00 0 4,860.00 345
2018 PENNENERGY RESOURCES LLC 306,009.00 324 0.00 0 3,341.00 324
2019 PENNENERGY RESOURCES LLC 267,909.00 335 0.00 0 1,576.00 335

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 PENNENERGY RESOURCES LLC Drill Cuttings 377.57 Tons LANDFILL CID # 28726
2015 PENNENERGY RESOURCES LLC Drill Cuttings 714.07 Tons LANDFILL CID # 28726
2015 PENNENERGY RESOURCES LLC Fracturing Fluid Waste 30.69 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Produced Fluid 582.93 Bbl INJECTION DISPOSAL WELL 34-155-23795
2016 PENNENERGY RESOURCES LLC Produced Fluid 344.24 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Produced Fluid 52.26 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 9,466.21 Bbl REUSE OTHER THAN ROAD SPREADING
2017 PENNENERGY RESOURCES LLC 7.88 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 17.07 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC Servicing Fluid 7.88 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Produced Fluid 36.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 36.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 6,130.32 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 6,973.23 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,448.02 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 48.62 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 103.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 47.98 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 50.88 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,072.13 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 73.44 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2276803 Primary Facility 2014-05-28 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2296847 Primary Facility 2014-08-06 Drilling/Alteration No Violations Noted THE CELLAR IS IN AND THE CONDUCTOR WILL BE INSTALLED 8/7/14
2305450 Primary Facility 2014-09-03 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE AT 2,035. THE RIG IS BEING MOVED. SITE IS OK.
2361500 Primary Facility 2015-04-13 Routine/Complete Inspection No Violations Noted
2369340 Primary Facility 2015-04-02 Drilling/Alteration No Violations Noted THE WELL PAD IS COVERED AND READY FOR A RIG.
2374357 Primary Facility 2015-05-26 Routine/Complete Inspection No Violations Noted
2378738 Primary Facility 2015-05-20 Drilling/Alteration No Violations Noted PATTERSON RAN PRODUCTION CASING, AND IS MOVING OUT. THE PAD IS BEING CLEANED.
2378742 Primary Facility 2015-05-07 Drilling/Alteration No Violations Noted PATTERSON 259 HAS MOVED OVER THIS HOLE TO DRILL THE BOTTOM SECTION. DRILLING HAS NOT STARTED.
2381926 Primary Facility 2015-06-23 Drilling/Alteration No Violations Noted RENEGADE SERVICES IS ON THE SITE TO RUN BOND LOGS.
2381930 Primary Facility 2015-05-28 Drilling/Alteration No Violations Noted THE RIG AND EQUIPTMENT ARE GONE. THE PAD IS BEING CLEANED.
2386516 Primary Facility 2015-07-07 Routine/Complete Inspection No Violations Noted
2401593 Primary Facility 2015-08-24 Routine/Complete Inspection No Violations Noted
2402717 Primary Facility 2015-08-18 Drilling/Alteration No Violations Noted UNIVERSAL HAS STARTED STIMULATION ACTIVITY THIS MORNING.
2410054 Primary Facility 2015-08-26 Drilling/Alteration No Violations Noted THIS WELL IS BEING FRACED.
2410064 Primary Facility 2015-09-16 Drilling/Alteration No Violations Noted THIS WELL HAS BEEN FRACED. THE PLUGS ARE DRILLED OUT AND THE WELL IS READY FOR FLOWBACK.
2410080 Primary Facility 2015-09-09 Drilling/Alteration No Violations Noted FRACING IS COMPLETE. THE SITE IS BEING SET UP FOR FLOWBACK.
2410605 Primary Facility 2015-09-25 Drilling/Alteration No Violations Noted crews are preparing the site for flowback.
2439219 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted
2451647 Primary Facility 2016-02-18 Drilling/Alteration No Violations Noted THIS WELL IS BEING PREPARED FOR VELOCITY TUBING.

THE SITE IS IN GOOD CONDITION.

2461563 Primary Facility 2016-02-23 Drilling/Alteration No Violations Noted TUBING HAS BEEN PUT IN THIS WELL. THE RIG IS GONE.

THE SITE IS IN GOOD CONDITION.

2478954 Primary Facility 2016-04-22 Routine/Complete Inspection No Violations Noted
2501632 Primary Facility 2016-07-11 Routine/Complete Inspection No Violations Noted
2518538 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted
2542670 Primary Facility 2016-11-17 Routine/Complete Inspection No Violations Noted
2555798 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted On 1/27/2017, WQS Brian MacQuarrie onsite at unconventional well site. Meet with Ken Ditty- onsite manager. Deep Well Services onsite fishing coil out of 3H. Four wells drilled and fraced. Secondary containment setup around wells, six frac tanks and two permanent 400 bbl production tanks. AST onsite containing impaired water. Erosion and Sedimentation best management practices installed and maintained. Site stabilized with perrenial vegetative growth. No apparent E/S issues.
2561234 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/17, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign and Erosion and Sedimentation Plan onsite in mailbox. Four wells in production. Two four bbl production tanks installed within secondary steel containment structure. AST set up on pad that was used to store impaired water and used for well stimulation activities. Frac tanks onsite within secondary containment. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas well vegetated. No apparent E/S issues.
2666430 Primary Facility 2017-12-01 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluids tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition.
2687654 Primary Facility 2018-01-29 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2756409 Primary Facility 2018-07-26 Routine/Complete Inspection No Violations Noted This well is in good condition. The pad is clean and has been well maintained. The pad is fenced and locked.