X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20459

Well Details

Well ID: 37-007-20459
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 151096
Farm/Lease Name: BEAVER PAD 5
License Status: Active
Spud Date:
Permit Date: 2014-09-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.758773
Longitude: -80.217904

For data sources see[1][2][3]

Well History

Date Event
Newly Drilled
2014-09-08 New Permit Application
2015-06-06 Performed Spud Operation
2020-02-26 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-11 2016-07-15 5,016 7,124,250 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.000605477 425
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.1042 60,438,800.0
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.8543 8,320,870.0
Unihibitor G GeoSafe Acid Corrosion Inhibitor Formaldehyde 50-00-0 1 0.00000630 4.424
Thiourea 62-56-6 1 0.00000630 4.424
Ethoxylated Alcohol 68002-97-1 35 0.000220577 154.829
Glycol Ether 112-34-5 60 0.000378133 265.421
Acetophenone 98-86-2 1 0.00000630 4.424
Methanol 67-56-1 5 0.00003151 22.118
TRS 11800, TRS 3001, EC6111A TightRock Solutions Frac Fluid Additives Inorganic Salt Proprietary 10 0.00889702 6245.05
Ethylene Glycol 107-21-1 5 0.000925733 649.796
Hydrotreated Light Distillate 64742-47-8 30 0.0266911 18735.1
Alkyl Alcohol Proprietary 10 0.00889702 6245.05
Oxyalkylated Alcohol Proprietary 5 0.00444851 3122.52
Amine Triphosphate Proprietary 30 0.0055544 3898.78
Glutaraldehyde 111-30-8 30 0.0054403 3818.69
Methanol 67-56-1 1 0.000181343 127.29
Sodium Phosphate, Tribasic 7601-54-9 5 0.000925733 649.796
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.761076 534219
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00000870 6.109

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 PENNENERGY RESOURCES LLC 242,744.00 120 0.00 0 3,750.00 120
2017 PENNENERGY RESOURCES LLC 487,837.00 340 0.00 0 7,845.00 340
2018 PENNENERGY RESOURCES LLC 393,846.00 354 0.00 0 6,443.00 354
2019 PENNENERGY RESOURCES LLC 324,235.00 353 0.00 0 4,395.00 353

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 PENNENERGY RESOURCES LLC Drill Cuttings 670.16 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Fracturing Fluid Waste 24.65 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Produced Fluid 665.29 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Fracturing Fluid Waste 2,895.45 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 1,506.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2016 PENNENERGY RESOURCES LLC Produced Fluid 576.98 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 PENNENERGY RESOURCES LLC Produced Fluid 517.71 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 182.40 Bbl INJECTION DISPOSAL WELL 34-155-21893
2016 PENNENERGY RESOURCES LLC Produced Fluid 12,165.62 Bbl REUSE OTHER THAN ROAD SPREADING
2017 PENNENERGY RESOURCES LLC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC 8.67 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Servicing Fluid 8.67 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Produced Fluid 158.80 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 158.80 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 58,186.01 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC 59,495.98 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 130.64 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 130.64 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,467.19 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 27.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 43.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 25.19 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 44.01 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,021.53 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 105.62 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2305072 Primary Facility 2014-09-05 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2378720 Primary Facility 2015-06-11 Drilling/Alteration No Violations Noted HIGHLANDS RIG 9 LOST THE DRILL BIT, TOP OF FISH @ 2,242'. A PLUG WAS SET FROM 1,875' TO 2,242'. RIG 9 HAS MOVED TO THE NEXT WELL. WHEN THE FLUID RIG FINISHES THE WELL THEY WILL SIDETRACK AROUND THE BIT.
2381744 Primary Facility 2015-06-19 Routine/Complete Inspection No Violations Noted
2390939 Primary Facility 2015-07-08 Drilling/Alteration No Violations Noted TOP HOLE IS DONE. THE RIG IS GONE. THE PAD REMAINS COVERED.
2428030 Primary Facility 2015-11-20 Routine/Complete Inspection No Violations Noted
2434245 Primary Facility 2015-12-02 Drilling/Alteration No Violations Noted PATTERSON 259 DRILLED TO 9,371' AND IS PULLING DRILL PIPE.
2436887 Primary Facility 2015-12-29 Routine/Complete Inspection No Violations Noted
2449325 Primary Facility 2016-01-11 Drilling/Alteration No Violations Noted HORIZONTAL PORTION OF THIS WELL IS COMPLETE, AND THE RIG IS GONE. THE WELL IS COVERED. THE SITE IS IN GOOD CONDITION.
2467243 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted
2468838 Primary Facility 2016-03-23 Drilling/Alteration No Violations Noted A BOND LOG WAS RUN. PRESSURE TESTING ON THE SITE IS ALMOST COMPLETE.

THE PAD IS IN GOOD CONDITION.

2469269 Primary Facility 2016-03-29 Drilling/Alteration No Violations Noted A BOND LOG WAS RUN AND PRESSURE TESTS ARE COMPLETE.

CUD ENERGY SERVICES ARE PREPARING WELLS FOR FRACING.

2477583 Primary Facility 2016-04-20 Drilling/Alteration No Violations Noted THIS WELL HAS BEEN PRESSURE TESTED AND LOGGED. THE WELL IS NOT FRACED.

THE SITE IS IN GOOD CONDITION.

2478913 Primary Facility 2016-04-22 Routine/Complete Inspection No Violations Noted
2480589 Primary Facility 2016-04-06 Drilling/Alteration No Violations Noted THE 2H HAS BEEN PRESSURE TESTED. THE WELL WILL BE FRACED AT A LATER TIME.

THE SITE IS IN GOOD CONDITION.

2501655 Primary Facility 2016-07-11 Routine/Complete Inspection No Violations Noted
2514039 Primary Facility 2016-07-12 Drilling/Alteration No Violations Noted THIS WELL IS BEING FRACED. AT THIS TIME THEY ARE WORKING ON STAGE 2.

THE SITE IS IN GOOD CONDITION.

2521475 Primary Facility 2016-09-21 Routine/Complete Inspection No Violations Noted
2542660 Primary Facility 2016-11-17 Routine/Complete Inspection No Violations Noted
2559987 Primary Facility 2017-02-09 Routine/Complete Inspection No Violations Noted On 2/9/17, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign in place. Erosion and Sedimentation Plan in mailbox. Four wells in production. Two four hundred bbl tanks installed within stainless steel secondary containment. Temporary AST setup onsite used for stimulation of wells. Freshwater impoundment fenced in. Erosion and Sedimentation Best Management Practices installed and maintained including compost filter sock and sediment trap. Site stabilized with vegetative growth. No apparent E/S issues. Light snow covering on ground during inspection.
2564559 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted On 2/24/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign in place. Erosion and Sedimentation Plan in mailbox. Four wells properly tagged and in production. Two four hundred bbl tanks installed within stainless steel secondary containment. Temporary AST containing impaired water removed from site. Four clamshell and one frac tank onsite within secondary containment. Two rolloffs containing residual waste ( plastic liners and hdpe pipe) awaiting disposal. Secondary containment installed around well heads removed. Freshwater impoundment fenced in. Erosion and Sedimentation Best Management Practices installed and maintained including compost filter sock and sediment trap. Site stabilized with vegetative growth. No apparent E/S issues.
2633402 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted On 9/07/2017, WQS Brian MacQuarrie onsite at unconventional well site. Four wells in production. Truck onsite transferring fluids from production tanks. Two 400 bbl tanks in containment. Erosion and Sedimentation best management practices installed and maintained including sediment trap. Majority of site well vegetated. Small area along access road needs to be re-seeded. No apparent E/S issues.
2667469 Primary Facility 2017-12-05 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. The well appeared to be equipped for production. Two brine tanks located onsite within containment. Both the tanks and the containment appeared to be in sound condition. Well development impoundment located onsite and it contained what appeared to contain freshwater.
2687685 Primary Facility 2018-01-29 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it appeared to contain withdrawn water and accumulated precipitation.
2768206 Primary Facility 2018-08-28 Routine/Complete Inspection No Violations Noted This well and all other equipment on the pad are in good condition.

For data sources see[8]

References