If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-007-20507 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.692639,"lon":-80.197272,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Beaver | |
| Municipality: New Sewickley Township | |
| Operator Name: PENNENERGY RESOURCES LLC | |
| Well Pad ID: 154382 | |
| Farm/Lease Name: PER B24 1H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2017-06-01 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: Yes | |
| Latitude: 40.692639 | |
| Longitude: -80.197272 |
| Date | Event |
|---|---|
| 2017-06-01 | New Permit Application |
| 2018-03-16 | Permit Renewal Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2641002 | Primary Facility | 2017-09-27 | Routine/Complete Inspection | No Violations Noted | On 9/27/2017, WQS Brian MacQuarrie onsite of B24 well site currently under construction. The site sign and mailbox are installed at the site entrance. Well permits and Erosion and Sedimentation Plan inside site mailbox. The access road, raingardens and the temporary Sedimentation basin are installed. Perimeter compost filter sock installed. Crews onsite stoning pad and constructing impoundment. Disturbed areas stabilized with seed and mulch. No apparent E/S issues. |
| 2659963 | Primary Facility | 2017-11-14 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan and the construction sequence. Site had been temporarily stabilized and the vegetation had begun to emerge and grow. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had been commenced but was not ongoing at the time of the inspection. Work was underway to implement the secondary containment after completion of setting the conductor pipe. Additionally work was underway to install fencing around the freshwater impoundment, which is currently unlined. |
For data sources see[5]