If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-007-20511 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.692419,"lon":-80.197308,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: New Sewickley Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 154382 | |
Farm/Lease Name: PER B24 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-09-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.692419 | |
Longitude: -80.197308 |
Date | Event |
---|---|
2017-09-22 | New Permit Application |
2017-11-10 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-07-10 | 2018-07-20 | 5,203 | 15,149,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Customer | Base Fluid and Mix Water | Listed Below | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.000901862 | 1324.14 | ||||
Diethylene glycol | 111-46-6 | 1 | 0.00001432 | 21.024 | ||||
Ethoxylated alcohols | PROPRIETARY | 10 | 0.000143196 | 210.244 | ||||
Ethoxylated alcohols | PROPRIETARY | 10 | 0.000143196 | 210.244 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00147464 | 2165.11 | ||||
Diethylene glycol | 111-46-6 | 1 | 0.00001432 | 21.024 | ||||
Hydrochloric acid | 7647-01-0 | 37 | 0.860998 | 1,264,140.0 | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.000901862 | 1324.14 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00524835 | 7705.77 | ||||
Substituted alkylamine | PROPRIETARY | 1 | 0.000473907 | 695.803 | ||||
Hydrochloric acid | 7647-01-0 | 37 | 0.860998 | 1,264,140.0 | ||||
Calcite | 471-34-1 | 1 | 0.114332 | 167866 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00524835 | 7705.77 | ||||
Formic Acid | 64-18-6 | 10 | 0.000143196 | 210.244 | ||||
Formic Acid | 64-18-6 | 10 | 0.000143196 | 210.244 | ||||
Alcohol Alkoxylates | PROPRIETARY | 5 | 0.00243701 | 3578.09 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.4332 | 16,786,500.0 | ||||
Biotite | 1302-27-8 | 0.1 | 0.0114332 | 16786.5 | ||||
Goethite | 1310-14-1 | 0.1 | 0.0114332 | 16786.5 | ||||
Water | 7732-18-5 | 100 | 86.1062 | 126,424,000.0 | ||||
Amine Triphosphate | PROPRIETARY | 30 | 0.00541117 | 7944.83 | ||||
Isopropanol | 67-63-0 | 5 | 0.00007160 | 105.122 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000143196 | 210.244 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0142172 | 20874.1 | ||||
Diethylene glycol (mono) methyl ether | 34590-94-8 | 20 | 0.000286391 | 420.488 | ||||
Isopropanol | 67-63-0 | 5 | 0.00007160 | 105.122 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00147464 | 2165.11 | ||||
Tar bases, quinolone derivs, benzyl chloride-quatenized | 72480-70-7 | 10 | 0.000143196 | 210.244 | ||||
Apatite | 64476-38-6 | 0.1 | 0.0114332 | 16786.5 | ||||
Aliphatic Hydrocarbon | PROPRIETARY | 30 | 0.0146221 | 21468.5 | ||||
Amine Triphosphate | PROPRIETARY | 30 | 0.00541117 | 7944.83 | ||||
Tar bases, quinolone derivs | 68513-87-1 | 1 | 0.00001432 | 21.024 | ||||
Calcite | 471-34-1 | 1 | 0.114332 | 167866 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0142172 | 20874.1 | ||||
Biotite | 1302-27-8 | 0.1 | 0.0114332 | 16786.5 | ||||
Substituted alkylamine | PROPRIETARY | 1 | 0.000473907 | 695.803 | ||||
Diethylene glycol (mono) methyl ether | 34590-94-8 | 20 | 0.000286391 | 420.488 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.4332 | 16,786,500.0 | ||||
Tar bases, quinolone derivs, benzyl chloride-quatenized | 72480-70-7 | 10 | 0.000143196 | 210.244 | ||||
Alcohol Alkoxylates | PROPRIETARY | 5 | 0.00243701 | 3578.09 | ||||
Tar bases, quinolone derivs | 68513-87-1 | 1 | 0.00001432 | 21.024 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.000491749 | 722 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.000491749 | 722 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000143196 | 210.244 | ||||
Aliphatic Hydrocarbon | PROPRIETARY | 30 | 0.0146221 | 21468.5 | ||||
Goethite | 1310-14-1 | 0.1 | 0.0114332 | 16786.5 | ||||
Apatite | 64476-38-6 | 0.1 | 0.0114332 | 16786.5 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNENERGY RESOURCES LLC | 401,121.00 | 113 | 0.00 | 0 | 4,357.00 | 113 |
2019 | PENNENERGY RESOURCES LLC | 1,114,578.00 | 359 | 0.00 | 0 | 12,425.00 | 359 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 295.83 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 358.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 5.00 Bbl | REUSE (AT WELL PAD) | |
2017 | PENNENERGY RESOURCES LLC | Drill Cuttings | 280.53 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Drill Cuttings | 523.26 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 12.83 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 5.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 9,618.88 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 1.11 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 760.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 40.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 144.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 981.84 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 48.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 147.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 307.65 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Servicing Fluid | 16.82 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 217.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 101.38 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 549.79 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 9,316.49 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Synthetic Liner Materials | 6.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 623.52 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 104.24 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 24.74 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 4.93 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2659816 | Primary Facility | 2017-11-14 | Drilling/Alteration | No Violations Noted | 40' of 16" conductor was cemented in a 20" hole. The cellar 8'x8'.
The site is in good condition. |
2659967 | Primary Facility | 2017-11-14 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan and the construction sequence. Site had been temporarily stabilized and the vegetation had begun to emerge and grow. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had been commenced but was not ongoing at the time of the inspection. Work was underway to implement the secondary containment after completion of setting the conductor pipe. Additionally work was underway to install fencing around the freshwater impoundment, which is currently unlined. |
2663193 | Primary Facility | 2017-11-21 | Drilling/Alteration | No Violations Noted | Conductor is set at 40' and ready for rig. No violations observed. NOVIO |
2670351 | Primary Facility | 2017-12-13 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan contained within the ESCGP. All erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing. Top-hole rig and associated equipment was in the process of being moved offsite. Freshwater impoundment construction had been completed but the impoundment had not been lined. |
2691206 | Primary Facility | 2018-02-02 | Routine/Complete Inspection | No Violations Noted | Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road, however snow accumulation made an evaluation of the erosion controls limited. Earth disturbance and work related to ESX17-007-0006 had commenced. A portion of this pipeline overlaps with the well site and its erosion controls. In the area of overlap the pipeline project's erosion controls are downslope and take precedence over the site's erosion controls. Secondary containment was located onsite, drilling had commenced but was not ongoing. Well development impoundment construction had been completed. Well development impoundment had been lined and put into service. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). |
2703736 | Primary Facility | 2018-03-12 | Drilling/Alteration | No Violations Noted | Rig drilling hole at 3931'. No violations noted. NOVIO |
2705576 | Primary Facility | 2018-03-14 | Drilling/Alteration | No Violations Noted | Rig drilling 7 7/8" hole at 7377'. No violations noted. NOVIO |
2706459 | Primary Facility | 2018-03-16 | Drilling/Alteration | No Violations Noted | Rig drilling 7 7/8" hole at 11,948'. No violations noted. NOVIO |
2708052 | Primary Facility | 2018-03-21 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection for well 007-20510 B24-4H. Secondary containment located onsite and drilling fluid containers located onsite were within tertiary containment. Well development impoundment located onsite and it appeared to be unlined and not in use. Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). |
2708095 | Primary Facility | 2018-03-21 | Drilling/Alteration | No Violations Noted | Patterson 261 drilled to a depth of 13,071', and cemented 13,053' of 5.5" production casing to the surface. |
2757758 | Primary Facility | 2018-07-23 | Routine/Complete Inspection | No Violations Noted | At time of inspection, frac crew and equipment currently on-site. |
2853566 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues. |
For data sources see[8]