37-007-20512

Well Details

Well ID: 37-007-20512
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154382
Farm/Lease Name: PER B24
License Status:
Spud Date:
Permit Date: 2017-09-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.692367
Longitude: -80.197317

For data sources see[1][2][3]

Well History

Date Event
2017-09-22 New Permit Application
2017-11-10 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-29 2018-06-06 5,474 14,983,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Calcite 471-34-1 1 0.0946065 134302
Ethoxylated alcohols PROPRIETARY 10 0.000146153 207.478
Water 7732-18-5 100 88.0801 125,038,000.0
Formic Acid 64-18-6 10 0.000146153 207.478
Alcohol Alkoxylates PROPRIETARY 5 0.0022077 3134.03
Diethylene glycol 111-46-6 1 0.00001462 20.748
Hydrotreated Light Distillate 64742-47-8 30 0.0179084 25422.5
Formic Acid 64-18-6 10 0.000146153 207.478
Aliphatic Hydrocarbon PROPRIETARY 30 0.0132462 18804.2
Cinnamaldehyde 104-55-2 10 0.000146153 207.478
Diethylene glycol 111-46-6 1 0.00001462 20.748
Ethoxylated alcohols PROPRIETARY 10 0.000146153 207.478
Aliphatic Hydrocarbon PROPRIETARY 30 0.0132462 18804.2
Hydrochloric acid 7647-01-0 37 0.857144 1,216,790.0
Biotite 1302-27-8 0.1 0.00946065 13430.2
Substituted alkylamine PROPRIETARY 1 0.000596946 847.418
Glutaraldehyde 111-30-8 30 0.00548531 7786.89
Tar bases, quinolone derivs 68513-87-1 1 0.00001462 20.748
Amine Triphosphate PROPRIETARY 30 0.00562202 7980.96
Hydrochloric acid 7647-01-0 37 0.857144 1,216,790.0
Sodium Phosphate, Tribasic 7601-54-9 5 0.000937003 1330.16
Ethylene glycol 107-21-1 40 0.00152162 2160.07
Hydrotreated Light Distillate 64742-47-8 30 0.0179084 25422.5
Ethylene glycol 107-21-1 40 0.00152162 2160.07
Ammonium Persulfate 7727-54-0 100 0.000284589 404
Biotite 1302-27-8 0.1 0.00946065 13430.2
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000292306 414.955
Goethite 1310-14-1 0.1 0.00946065 13430.2
Crystalline silica (Quartz) 14808-60-7 100 9.46065 13,430,200.0
Calcite 471-34-1 1 0.0946065 134302
Sodium Phosphate, Tribasic 7601-54-9 5 0.000937003 1330.16
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000146153 207.478
Goethite 1310-14-1 0.1 0.00946065 13430.2
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000146153 207.478
Substituted alkylamine PROPRIETARY 1 0.000596946 847.418
Apatite 64476-38-6 0.1 0.00946065 13430.2
Tar bases, quinolone derivs 68513-87-1 1 0.00001462 20.748
Isopropanol 67-63-0 5 0.00007308 103.739
Cinnamaldehyde 104-55-2 10 0.000146153 207.478
Amine Triphosphate PROPRIETARY 30 0.00562202 7980.96
Apatite 64476-38-6 0.1 0.00946065 13430.2
Glutaraldehyde 111-30-8 30 0.00548531 7786.89
Crystalline silica (Quartz) 14808-60-7 100 9.46065 13,430,200.0
Ammonium Persulfate 7727-54-0 100 0.000284589 404
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000292306 414.955
Isopropanol 67-63-0 5 0.00007308 103.739
Alcohol Alkoxylates PROPRIETARY 5 0.0022077 3134.03
Water Customer Base Fluid and Mix Water Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 478,016.00 130 0.00 0 2,072.00 130
2019 PENNENERGY RESOURCES LLC 752,774.00 361 0.00 0 2,538.00 361

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 295.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 358.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 137.80 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 325.47 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 423.14 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 12.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 5.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 13,932.65 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 1.11 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 328.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 144.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 451.84 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 35.21 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 147.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 307.65 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 16.82 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 128.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 63.47 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 324.80 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 6,947.07 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 4.75 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 368.38 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 64.82 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 14.63 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 3.51 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2659822 Primary Facility 2017-11-14 Drilling/Alteration No Violations Noted 40' of 16" conductor was cemented in a 20" hole. The cellar 8'x8'.

The site is in good condition.

2659968 Primary Facility 2017-11-14 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan and the construction sequence. Site had been temporarily stabilized and the vegetation had begun to emerge and grow. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had been commenced but was not ongoing at the time of the inspection. Work was underway to implement the secondary containment after completion of setting the conductor pipe. Additionally work was underway to install fencing around the freshwater impoundment, which is currently unlined.
2663197 Primary Facility 2017-11-21 Drilling/Alteration No Violations Noted Conductor is set at 40' and ready for rig. No violations observed. NOVIO
2670247 Primary Facility 2017-12-13 Drilling/Alteration No Violations Noted Rig and equipment demobilizing after cementing 8 5/8" casing. No violations observed. NOVIO
2670352 Primary Facility 2017-12-13 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing. Top-hole rig and associated equipment was in the process of being moved offsite. Freshwater impoundment construction had been completed but the impoundment had not been lined.
2691207 Primary Facility 2018-02-02 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road, however snow accumulation made an evaluation of the erosion controls limited. Earth disturbance and work related to ESX17-007-0006 had commenced. A portion of this pipeline overlaps with the well site and its erosion controls. In the area of overlap the pipeline project's erosion controls are downslope and take precedence over the site's erosion controls. Secondary containment was located onsite, drilling had commenced but was not ongoing. Well development impoundment construction had been completed. Well development impoundment had been lined and put into service. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2701626 Primary Facility 2018-03-06 Drilling/Alteration No Violations Noted Patterson began drilling the bottom section of this well at 2544'. The rig has reached a depth of 6420'.i
2708053 Primary Facility 2018-03-21 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection for well 007-20510 B24-4H. Secondary containment located onsite and drilling fluid containers located onsite were within tertiary containment. Well development impoundment located onsite and it appeared to be unlined and not in use. Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2757760 Primary Facility 2018-07-23 Routine/Complete Inspection No Violations Noted At time of inspection, frac crew and equipment currently on-site.
2853568 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]