X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20521

Well Details

Well ID: 37-007-20521
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154383
Farm/Lease Name: PER B17
License Status:
Spud Date:
Permit Date: 2017-09-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.802494
Longitude: -80.212664

For data sources see[1][2][3]

Well History

Date Event
2017-09-28 New Permit Application
2018-03-21 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-11 2019-02-18 4,741 13,909,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Chemical(s) Listed Above See Trade Name(s) List Tar bases, quinolone derivs 68513-87-1 1 0.00212337 2905.65
Crystalline silica (Quartz) 14808-60-7 100 12.853 17,588,200.0
Ethylene Glycol 107-21-1 5 0.000893733 1223
Biotite 1302-27-8 0.1 0.012853 17588.2
Hydrochloric acid 7647-01-0 37 0.812763 1,112,200.0
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000130808 179
Ammonium Persulfate 7727-54-0 100 0.000420193 575
Calcite 471-34-1 1 0.12853 175882
Goethite 1310-14-1 0.1 0.0128528 17588
Substituted Alkylamine Proprietary 1 0.00041654 570
Sodium Phosphate, Tribasic 7601-54-9 5 0.000893733 1223
Isopropanol 67-63-0 5 0.00006504 89
Cinnamaldehyde 104-55-2 10 0.000130729 178.892
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000261616 358
Oxyalkylated Alcohol Proprietary 5 0.00208416 2852
Diethylene glycol 111-46-6 1 0.00001315 18
Inorganic Salt Proprietary 10 0.00416905 5705
Formic Acid 64-18-6 10 0.000130808 179
Ethylene glycol 107-21-1 40 0.000523232 716
Apatite 64476-38-6 0.1 0.012853 17588.2
Alcohol Alkoxylates Proprietary 5 0.00212362 2906
Ethoxylated alcohols Proprietary 10 0.000130729 178.892
TRS17888 Tight Rock Solutions Fricition Reducer Oxyalkylated Alcohol Proprietary 5 0.00208416 2852
Inorganic Salt Proprietary 10 0.00416905 5705
Hydrotreated Light Distillate 64742-47-8 30 0.0125064 17114
Substituted Alkylamine Proprietary 1 0.00041654 570
TRS805X Tight Rock Solutions Fricition Reducer Alcohol Alkoxylates Proprietary 5 0.00212362 2906
Aliphatic Hydrocarbon Proprietary 30 0.0127403 17434
BIOC12031A Nalco Biocide Glutaraldehyde 111-30-8 30 0.00648706 8877
TRS3001 Tight Rock Solutions Scale Inhibitor Amine Triphosphate Proprietary 30 0.00536094 7336
Sodium Phosphate, Tribasic 7601-54-9 5 0.000893733 1223
Ethylene Glycol 107-21-1 5 0.000893733 1223
Water Customer Base Fluid and Mix Water Ethylene glycol 107-21-1 40 0.000523232 716
Diethylene glycol 111-46-6 1 0.00001315 18
Hydrochloric acid 7647-01-0 37 0.812763 1,112,200.0
Apatite 64476-38-6 0.1 0.012853 17588.2
Tar bases, quinolone derivs 68513-87-1 1 0.00212337 2905.65
Crystalline silica (Quartz) 14808-60-7 100 12.853 17,588,200.0
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000261616 358
Formic Acid 64-18-6 10 0.000130808 179
Biotite 1302-27-8 0.1 0.012853 17588.2
Ammonium Persulfate 7727-54-0 100 0.000420193 575
Goethite 1310-14-1 0.1 0.0128528 17588
Calcite 471-34-1 1 0.12853 175882
Cinnamaldehyde 104-55-2 10 0.000130729 178.892
Ethoxylated alcohols Proprietary 10 0.000130729 178.892
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000130808 179
Water 7732-18-5 100 84.825 116,076,000.0
Isopropanol 67-63-0 5 0.00006504 89

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drill Cuttings 685.97 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 326.27 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 260.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 510.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 60.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 224.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 1.20 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 3.00 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Filter Socks 0.89 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 43.47 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 230.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,500.97 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 2.70 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2654230 Primary Facility 2017-10-30 Routine/Complete Inspection No Violations Noted On 10/27/2017, WQS Brian MacQuarrie met onsite with Joseph Schwab -Penn Energy for the purpose of conducting a pre- operation inspection. Well permits and ESCGP onsite. All erosion and sedimentation best management practices installed. Site has been stabilized with seed and mulch. No apparent E/S issues.

As a result of this inspection, drilling activities may commence.

2709178 Primary Facility 2018-03-23 Drilling/Alteration No Violations Noted A 16" conductor casing was set at 40' and cemented up into the 8'X8' cellar.
2709970 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection. Work was underway onsite for installation of the sound barrier wall to be located onsite. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2712347 Primary Facility 2018-03-30 Drilling/Alteration No Violations Noted Conductor set, containment in place, sound walls up, ready for rig mobilization. No violations noted. NOVIO
2718464 Primary Facility 2018-04-16 Drilling/Alteration No Violations Noted Highlands rig 9 has cemented 11 3/4" casing to the surface. Currently the rig is setting up to resume drilling after cement wait time.
2721574 Primary Facility 2018-04-16 Drilling/Alteration No Violations Noted Rig ran and cemented 11 3/4" casing, WOC. No violations noted. NOVIO
2742089 Primary Facility 2018-06-15 Routine/Complete Inspection No Violations Noted At time of inspection, rig is not on-site. There are 6 wells on this pad that have been spudded, not yet frac'd. The wells are covered with steel plates, surrounded by gates, and are identified. A sound barrier is installed around the pad perimeter.
2776074 Primary Facility 2018-09-18 Drilling/Alteration No Violations Noted Patterson 259 cemented 11,740' of 5.5" production casing with 21 bbls returned to surface.
2849894 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted At the time of inspection well appears drilled and equipped for production. Seven roll-off frac tanks on-site within secondary containment. Materials and equipment stored on-site within secondary containment. One AST on-site with signage identifying contents. One of the three AST inflow/outflow valve locations did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues.

For data sources see[8]

References