If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-007-20523 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.802478,"lon":-80.212519,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Beaver | |
| Municipality: Marion Township | |
| Operator Name: PENNENERGY RESOURCES LLC | |
| Well Pad ID: 154383 | |
| Farm/Lease Name: PER B17 4H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2017-10-17 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 40.802478 | |
| Longitude: -80.212519 |
| Date | Event |
|---|---|
| 2017-10-17 | New Permit Application |
| 2018-03-22 | Performed Spud Operation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2019 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2018 | PENNENERGY RESOURCES LLC | Drill Cuttings | 803.55 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
| 2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 326.27 Bbl | REUSE (AT WELL PAD) | |
| 2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 630.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
| 2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 390.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
| 2019 | PENNENERGY RESOURCES LLC | Filter Socks | 0.89 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
| 2019 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 1.20 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
| 2019 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 3.00 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
| 2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 43.47 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
| 2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 2,036.54 Bbl | REUSE (AT WELL PAD) | |
| 2019 | PENNENERGY RESOURCES LLC | Synthetic Liner Materials | 2.70 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2709204 | Primary Facility | 2018-03-23 | Drilling/Alteration | No Violations Noted | A 16" conductor casing was set at 40' and cemented up into the 8'X8' cellar. |
| 2709975 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection. Work was underway onsite for installation of the sound barrier wall to be located onsite. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). |
| 2712352 | Primary Facility | 2018-03-30 | Drilling/Alteration | No Violations Noted | Conductor set, containment in place, sound walls up, ready for rig mobilization. No violations noted. NOVIO |
| 2715960 | Primary Facility | 2018-04-09 | Drilling/Alteration | No Violations Noted | Rig ready to take pressure readings after drilling 15" hole to 560' and setting 544.93' of 11 3/4" casing, WOC. No violations noted. NOVIO |
| 2742084 | Primary Facility | 2018-06-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, rig is not on-site. There are 6 wells on this pad that have been spudded, not yet frac'd. The wells are covered with steel plates, surrounded by gates, and are identified. A sound barrier is installed around the pad perimeter. |
| 2787618 | Primary Facility | 2018-10-11 | Drilling/Alteration | No Violations Noted | Patterson 259 set 12,259' of 5.5" production casing. The casing was cemented to the surface with 30 bbls returned. |
| 2849899 | Primary Facility | 2019-03-07 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears drilled and equipped for production. Seven roll-off frac tanks on-site within secondary containment. Materials and equipment stored on-site within secondary containment. One AST on-site with signage identifying contents. One of the three AST inflow/outflow valve locations did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues. |
For data sources see[7]