If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-013-20011 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.370667,"lon":-78.536,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Blair | |
| Municipality: Juniata Township | |
| Operator Name: LPR ENERGY LLC | |
| Well Pad ID: 146715 | |
| Farm/Lease Name: HODGE UNIT 1H | |
| License Status: | |
| Spud Date: 2011-03-12 | |
| Permit Date: 2009-08-26 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 40.370667 | |
| Longitude: -78.5360 |
| Date | Event |
|---|---|
| 2009-08-26 | New Permit Application |
| 2010-06-22 | Permit Renewal Application |
| 2011-03-11 | Performed Spud Operation |
| 2011-04-11 | Drilling Completion |
| 2011-05-13 | Perforation |
| 2012-07-20 | DEVIATED |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2011-05-13 | 2011-05-13 | 7,187 | 3,542,742 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Base Fluid | Water | 100.00 | 87.78 | |||
| Friction Reducer - Plexslick 921 | Pumpco Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.05 | |||
| Plexaid OS-30 | Pumpco Services | Oxygen Scavenger | ||||||
| Ammonium bisulfite | 10192-30-0 | 0.00900000 | ||||||
| Biocide - Plexcide 24L | Pumpco Services | Biocide | ||||||
| Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.02 | |||||
| Sodium hydroxide | 1310-73-2 | |||||||
| Sand (Proppant) | Pumpco Services | Propping Agent | ||||||
| Quartz | 14808-60-7 | 99.90 | 12.05 | |||||
| Scale Inhibitor - Greenhib 677 | Pumpco Services | Scale Inhibitor | Salt of phosphono-methylated diamine | 25.00 | 0.05 | |||
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2009 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | CHEVRON APPALACHIA LLC | 12,424.00 | 31 | 0.00 | 0 | 0.00 | 0 |
| 2013 | CHEVRON APPALACHIA LLC | 214,216.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | CHEVRON APPALACHIA LLC | 98,303.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2015 | LPR ENERGY LLC | 93,500.26 | 308 | 0.00 | 0 | 0.00 | 0 |
| 2016 | LPR ENERGY LLC | 78,290.27 | 349 | 0.00 | 0 | 0.00 | 0 |
| 2017 | LPR ENERGY LLC | 59,124.00 | 353 | 0.00 | 0 | 0.00 | 0 |
| 2018 | LPR ENERGY LLC | 61,447.00 | 360 | 0.00 | 0 | 0.00 | 0 |
| 2019 | LPR ENERGY LLC | 72,285.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 28.90 Tons | LANDFILL | 101534 |
| 2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,230.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
| 2011 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 440.00 Bbl | LANDFILL | NY STATE #32S11 |
| 2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 70.09 Tons | LANDFILL | 101421 |
| 2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,061.77 Tons | LANDFILL | 100081 |
| 2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
| 2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 391.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,081.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 225.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
| 2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 549.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,635.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2015 | LPR ENERGY LLC | Produced Fluid | 107.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
| 2015 | LPR ENERGY LLC | Produced Fluid | 1,033.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2016 | LPR ENERGY LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
| 2016 | LPR ENERGY LLC | Produced Fluid | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
| 2016 | LPR ENERGY LLC | Produced Fluid | 1,224.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2016 | LPR ENERGY LLC | 203.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 | |
| 2016 | LPR ENERGY LLC | Produced Fluid | 297.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2016 | LPR ENERGY LLC | 78.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | ||
| 2016 | LPR ENERGY LLC | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
| 2017 | LPR ENERGY LLC | Produced Fluid | 203.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
| 2017 | LPR ENERGY LLC | Produced Fluid | 220.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2017 | LPR ENERGY LLC | Produced Fluid | 208.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
| 2017 | LPR ENERGY LLC | 203.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM | |
| 2017 | LPR ENERGY LLC | 208.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
| 2018 | LPR ENERGY LLC | Produced Fluid | 205.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | LPR ENERGY LLC | Produced Fluid | 100.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2018 | LPR ENERGY LLC | Produced Fluid | 919.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
| 2019 | LPR ENERGY LLC | Produced Fluid | 1,841.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1951495 | Primary Facility | 2011-01-14 | Routine/Complete Inspection | No Violations Noted | |
| 1962526 | Primary Facility | 2011-04-01 | Drilling/Alteration | No Violations Noted | |
| 1976238 | Primary Facility | 2011-03-17 | Routine/Complete Inspection | No Violations Noted | |
| 1980398 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | No Violations Noted | |
| 1981940 | Primary Facility | 2011-05-10 | Routine/Complete Inspection | No Violations Noted | |
| 1993529 | Primary Facility | 2011-06-20 | Routine/Complete Inspection | No Violations Noted | |
| 2001269 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | |
| 2004547 | Primary Facility | 2011-08-03 | Routine/Complete Inspection | No Violations Noted | |
| 2024665 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | |
| 2029939 | Primary Facility | 2011-12-28 | Routine/Complete Inspection | No Violations Noted | |
| 2035487 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | |
| 2058957 | Primary Facility | 2012-03-08 | Routine/Complete Inspection | No Violations Noted | |
| 2170036 | Primary Facility | 2013-05-29 | Routine/Complete Inspection | No Violations Noted | |
| 2195998 | Primary Facility | 2013-08-13 | Routine/Complete Inspection | No Violations Noted | |
| 2223650 | Primary Facility | 2013-11-19 | Routine/Complete Inspection | No Violations Noted | |
| 2232607 | Primary Facility | 2013-12-27 | Routine/Complete Inspection | No Violations Noted | |
| 2468190 | Primary Facility | 2016-03-23 | Site Restoration | No Violations Noted | |
| 2784060 | Primary Facility | 2018-10-01 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at LPR Energy's Hodge Unit on October 1, 2018. There is one drilled and producing Marcellus well (013-20011) located on this partially reduced in size well pad. All areas surrounding the well pad are very well vegetated exceeding 70% uniform cover.
No violations noted. |
For data sources see[8]