X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-20281

Well Details

Well ID: 37-015-20281
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Springfield Township
Operator Name: EOG RESOURCES INC
Well Pad ID: 148456
Farm/Lease Name: GUINAN 2H
License Status:
Spud Date:
Permit Date: 2009-05-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.871398
Longitude: -76.692417

For data sources see[1][2][3]

Well History

Date Event
2009-05-14 New Permit Application
2010-03-16 Permit Renewal Application
2010-04-26 Performed Spud Operation
2011-01-21 Perforation
2011-07-26 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-02-01 2011-02-01 5,492 5,926,326

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-14 Baker Hughes Corrosion Inhibitor Olefin 5.00 0.00008000
Polyoxyalkylenes 30.00 0.00047000
Fatty Acids 10.00 0.00016000
Propargyl alcohol 107-19-7 5.00 0.00008000
Methanol 67-56-1 100.00 0.00156000
Alpha 1427 Baker Hughes Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 7.00 0.00167000
Ethanol 64-17-5 5.00 0.00119000
Glutaraldehyde 111-30-8 30.00 0.00715000
Water 7732-18-5 60.00 0.01
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00238000
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
Ferrotrol 300L Baker Hughes Iron Control Citric acid 77-92-9 70.00 0.00955000
Water Operator Carrier Water 7732-18-5 100.00 86.80
Hydrochloric Acid 10.1-15 Baker Hughes Acidizing
Water 7732-18-5 85.00 1.77
Hydrochloric acid 7647-01-0 15.00 0.31
Frac Sand (All Meshes) CWT Baker Hughes Proppant Quartz 14808-60-7 100.00 11.02
Scaletrol 720 Baker Hughes Scale Inhibitor
Diethylene glycol 111-46-6 5.00 0.00051000
Ethylene glycol 107-21-1 45.00 0.00455000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2010 EOG RESOURCES INC 0.00 0 0.00 0 0.00 0
2011 EOG RESOURCES INC 696,457.00 273 0.00 0 0.00 0
2012 EOG RESOURCES INC 1,041,503.00 366 0.00 0 0.00 0
2013 EOG RESOURCES INC 693,916.00 365 0.00 0 0.00 0
2014 EOG RESOURCES INC 496,447.57 365 0.00 0 0.00 0
2015 EOG RESOURCES INC 373,376.60 365 0.00 0 0.00 0
2016 EOG RESOURCES INC 299,267.76 366 0.00 0 0.00 0
2017 EOG RESOURCES INC 241,267.13 365 0.00 0 0.00 0
2018 EOG RESOURCES INC 218,051.39 365 0.00 0 0.00 0
2019 EOG RESOURCES INC 221,220.04 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 EOG RESOURCES INC Fracturing Fluid Waste 146.00 Tons LANDFILL 8-4630-00010/00
2011 EOG RESOURCES INC Drill Cuttings 146.00 Tons LANDFILL 8-4630-00010/00
2011 EOG RESOURCES INC Produced Fluid 4,626.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EOG RESOURCES INC Drill Cuttings 92.86 Tons LANDFILL 31346244
2011 EOG RESOURCES INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-049-23127
2012 EOG RESOURCES INC Produced Fluid 2,063.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EOG RESOURCES INC Produced Fluid 295.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EOG RESOURCES INC Produced Fluid 437.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EOG RESOURCES INC Produced Fluid 210.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2014 EOG RESOURCES INC Produced Fluid 106.40 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EOG RESOURCES INC Produced Fluid 213.78 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EOG RESOURCES INC Produced Fluid 88.52 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 EOG RESOURCES INC Produced Fluid 110.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 EOG RESOURCES INC Produced Fluid 60.14 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 EOG RESOURCES INC Produced Fluid 119.88 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 EOG RESOURCES INC Produced Fluid 86.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 EOG RESOURCES INC Produced Fluid 217.00 Bbl REUSE (AT WELL PAD)
2017 EOG RESOURCES INC 217.00 Bbl REUSE (AT WELL PAD)
2018 EOG RESOURCES INC Produced Fluid 269.00 Bbl REUSE (AT WELL PAD)
2019 EOG RESOURCES INC Produced Fluid 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EOG RESOURCES INC Produced Fluid 107.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1887161 Primary Facility 2010-05-21 Routine/Complete Inspection No Violations Noted
1890963 Primary Facility 2010-06-11 Drilling/Alteration No Violations Noted Conducted Inspection with DEP expert John Vittitow. Met onsit with EOG Field Drilling Superintendent Robert Dysart, HWD Tool Pusher Mike Bigelow, EOG Wellsite Supervisor Kelly Spoonts, EOG Wellsite Supervisor Kevin Russell and Dallas Morris Tool Pusher Jerry Barnes. HWD Rig #4 rigged up over the hole and drilling operations are suspended, painting in process. HWD Rig #4 is prepared to resume drilling at 4,100'. The planned MTD is 9,133'.
1890993 Primary Facility 2010-06-09 Drilling/Alteration No Violations Noted On location with Doug Welsh to witness BOP test. all test were ok and bop is ok. CASING PROGRAM !!! ran 82 ft 16" casing cemented to surface** ran 379 ft 11 3/4 casing cemented to surface with 15 bbl return*** ran 1400 ft 8 5/8 casing cemented to surface with 30 bbl return to surface.
2169075 Primary Facility 2013-05-10 Routine/Complete Inspection No Violations Noted
2573941 Primary Facility 2017-03-22 Routine/Complete Inspection No Violations Noted One well in production phase. One separator on location. No leaks detected from production equipment. Site restored to minimal contour. Site stable. No violations noted.
2701646 Primary Facility 2018-03-06 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. No violations cited.

For data sources see[8]

References