If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-20334 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.653736,"lon":-76.295592,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Terry Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 149553 | |
Farm/Lease Name: WELLES 3 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-06-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.653736 | |
Longitude: -76.295592 |
Date | Event |
---|---|
2009-06-16 | New Permit Application |
2009-12-13 | Performed Spud Operation |
2013-08-01 | Perforation |
2014-02-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-15 | 2013-09-22 | 7,336 | 6,443,980 | 412,220 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexbreak 145 | PUMPCO | Non-Emulsifier | Coconut oil, Diethanolamide | 068603-42-9 | 10 | 0.00005000 | 0 |
Diethanolamine | 000111-42-2 | 2 | 0.00001000 | 0 | ||||
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 15 | 0.00008000 | 0 | ||||
Water | 007732-18-5 | 65 | 0.00034 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 15 | 0.00008000 | 0 | ||||
SFR-451 | X CHEM | Friction Reducer | Ammonium Acetate | 000631-61-8 | 6 | 0.00409 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 35 | 0.02389 | 0 | ||||
SFR-470 | X CHEM | Friction Reducer | Ethoxylated Alcohol | 068439-50-9 | 5 | 0.00082 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 35 | 0.00574 | 0 | ||||
Alcohol ethoxylate C-10/16 with 6.5 EO | 068002-97-1 | 5 | 0.00082 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 5 | 0.00082 | 0 | ||||
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 15 | 0.00246 | 0 | ||||
Ferriplex 40 | PUMPCO | Iron Control Agent | Water | 007732-18-5 | 60 | 0.00115 | 0 | |
Sodium Hydroxide | 001310-73-2 | 1 | 0.00002000 | 0 | ||||
Sodium Sulfate | 007757-82-6 | 2 | 0.00004000 | 0 | ||||
Trisodium Nitrilotriacetate | 005064-31-3 | 40 | 0.00076 | 0 | ||||
B84, SC30, SFR-451, SFR-470 | X CHEM | Anti-Bacterial Agent, Friction Reducer, Scale Inhibitor | Ethoxylated Alcohol | 068439-50-9 | 0 | 0.06298 | 0 | |
Water | 007732-18-5 | 0 | 0.11571 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.07622 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 0 | 0.06298 | 0 | ||||
Alcohol ethoxylate C-10/16 with 6.5 EO | 068002-97-1 | 0 | 0.06298 | 0 | ||||
Sorbitol Tetraoleate | 061723-83-9 | 0 | 0.01324 | 0 | ||||
Polyacrylamide (Acrylamide, Ammonium Acrylate Copolymer) | 026100-47-0 | 0 | 0.01324 | 0 | ||||
Alcohols, C12-C14-Secondary, Ethoxylated | 084133-50-6 | 0 | 0.01324 | 0 | ||||
Polypropenamide | 910644-97-2 | 0 | 0.06298 | 0 | ||||
Polyethylene Glycol Monooleate | 009004-96-0 | 0 | 0.01324 | 0 | ||||
Ethoxylated Oleylamine | 026635-93-8 | 0 | 0.06298 | 0 | ||||
Sorbitan Monooleate | 001338-43-8 | 0 | 0.07622 | 0 | ||||
Acid HCL | PUMPCO | Acid | Water | 007732-18-5 | 85 | 0.2719 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.04798 | 0 | ||||
B84 | X CHEM | Anti-Bacterial Agent | Ethanol | 000064-17-5 | 4 | 0.00103 | 0 | |
Glutaraldehyde (Pentanediol) | 000111-30-8 | 27 | 0.00694 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 007173-51-5 | 8 | 0.00206 | 0 | ||||
Quaternary Ammonium Compound | 068424-85-1 | 6 | 0.00141 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 67.9572 | 0 | |
Northern White Sand | PUMPCO | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 11.8967 | 0 | |
Plexhib 256 | PUMPCO | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00005000 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00028 | 0 | ||||
Alkenes^ C>10 alpha- | 064743-02-8 | 5 | 0.00002000 | 0 | ||||
Ethoxylated Alcohols^ C14-15 | 068951-67-7 | 30 | 0.00014 | 0 | ||||
Modified Thiourea Polymer | 068527-49-1 | 30 | 0.00014 | 0 | ||||
SC30 | X CHEM | Scale Inhibitor | Sodium Polyacrylate | 009003-04-7 | 100 | 0.00852 | 0 | |
100 Mesh Sand | PUMPCO | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 1.41682 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 18.2876 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 458,279.00 | 65 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 2,114,768.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 1,133,799.00 | 232 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 424,498.00 | 103 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 1,223,015.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,176,213.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 1,025,894.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 4,217.72 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 550.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 1,948.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 12,582.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,823.18 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 444.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 202.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | 147.50 Bbl | REUSE (AT WELL PAD) | ||
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 92.50 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.78 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1883752 | Primary Facility | 2010-05-05 | Drilling/Alteration | No Violations Noted | nomac rig 245 rig @ 11560 ft deep ran 40 ft 20 in casing and 1048 ft of 9 5/8 casing all looks good |
1907025 | Primary Facility | 2010-08-18 | Routine/Complete Inspection | No Violations Noted | did 2 perf and patches at approx 1700 and 1900 ft pumped 63-66 bbl cement behind pipe. 0 psi on annulis |
1909291 | Primary Facility | 2010-08-30 | Routine/Complete Inspection | No Violations Noted | 265 lbs on 9 5/8 casing. going to run temp log to see where next perf and patch will be. |
1909317 | Primary Facility | 2010-08-24 | Routine/Complete Inspection | No Violations Noted | perf @ 1934 and pump 21 bbl cement pipe//// perf @ 1880&1700 pumped 42 bbl cement behind pipe. |
1910594 | Primary Facility | 2010-09-03 | Routine/Partial Inspection | No Violations Noted | |
1911015 | Primary Facility | 2010-09-02 | Routine/Complete Inspection | No Violations Noted | 9 5/8 casing open venting gas |
1911345 | Primary Facility | 2010-09-08 | Routine/Complete Inspection | No Violations Noted | 250 lbs on 9 5/8 casing. rig moving in to drill out cement then going to run logs and then do more perf and squeeze jobs. |
1912072 | Primary Facility | 2010-09-10 | Routine/Complete Inspection | No Violations Noted | perfs @ 1924-1926 6 shots per foot.9 5/8 venting right now then going to do squeeze job after gas is vented. |
1913817 | Primary Facility | 2010-09-15 | Routine/Complete Inspection | No Violations Noted | sept 14 perf @ 5250 pumped 64 bbl cement behind pipe.. sept 15 perfed 5050-5051 6 shots per ft pumped 42 bbl cement behind pipe |
1915411 | Primary Facility | 2010-09-21 | Routine/Complete Inspection | No Violations Noted | sept 16th did squeeze job @ 2300 ft 42 bbl cement sept 20th cement plug 5 1/2 bbl @2000 ft deep |
1990446 | Primary Facility | 2011-07-19 | Routine/Complete Inspection | No Violations Noted | Shut-in. 0 on gauge. 0% combustible gas. |
2061142 | Primary Facility | 2012-04-13 | Drilling/Alteration | No Violations Noted | Mercer 123, on standby, no comp. man |
2063462 | Primary Facility | 2012-04-25 | Routine/Complete Inspection | No Violations Noted | Comp. Man - Charlie Brown, Rig is moving out. Did squeeze work, no surf gas at this time. Prep for a liner. |
2123166 | Primary Facility | 2012-12-10 | Routine/Complete Inspection | No Violations Noted | Bradford, Terrry Twp. |
2126535 | Primary Facility | 2012-12-28 | Routine/Complete Inspection | No Violations Noted | No activity, deep snow covered. |
2160682 | Primary Facility | 2013-04-22 | Routine/Complete Inspection | No Violations Noted | |
2208421 | Primary Facility | 2013-09-26 | Incident- Response to Accident or Event | Pending | : Arrived at the site at 11:20 in response to a (25) gallon spill of an unknown material. Chesapeake reported the spill incident to the Department at 6:42 PM on 9/25/13. The Marcellus incident report indicates the spill occurred as Chesapeake was getting ready to move frac equipment. They were moving a dumpster not on containment and in the process of cleaning it out. The report alleges a liquid leaked out of the container and is most likely water. The liquid impacted the soil around the dumpster and Chesapeake already scraped the soil and staged it on containment for removal |
2225001 | Primary Facility | 2013-11-25 | Follow-up Inspection | Viol(s) Noted & Immediately Corrected | Chesapeake submitted a report to the Department on 11/8/13 in relation to the spill incident that occurred at the site. The report indicates a brine spill of approximately (25) gallons was released to the soil on 9/25/13 while equipment was being moved after completions activities. The report includes a brief description of the incident and post excavation sampling results. The spill was reported to the Department at 6:42 PM on 9/25/13. Chesapeake originally indicated to the Department the spill was most likely water. The Department reviewed the post excavation sampling results on 11/22/13 and concluded that although there may still be some evidence of the spill remaining, there are no compounds of concern above their relevant cleanup standards and there is no need for additional soil remediation with respect to this spill. |
2453809 | Primary Facility | 2016-02-24 | Routine/Complete Inspection | No Violations Noted | |
2571973 | Primary Facility | 2017-03-16 | Routine/Complete Inspection | No Violations Noted | Two Wells in production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted. |
2633725 | Primary Facility | 2017-09-07 | Site Restoration | No Violations Noted | Two Wells in production phase. Two each sand and water separators. Two production water storage tanks. No leaks or corrosion noted on production equipment. Site stable. Site recommended for notice of termination approval. No violations noted. |
2719173 | Primary Facility | 2018-04-17 | Routine/Complete Inspection | No Violations Noted | Arrived at 12:30. Weather: cold and windy. Two producing wells onsite. Two sand separators, 2 GPUs, two produced water tanks. No violations were observed. |
2855915 | Primary Facility | 2019-03-18 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 11:07; the weather was ~35°F, calm, and sunny. A well tender was leaving the pad as I arrived.
There were 2 properly tagged Marcellus wells staged for production. There was some ice and water in the cellars; no bubbling was observed. There were 2 each GPUs, sand separators, and produced water tanks also onsite. There was an infiltration area installed to the west of the pad as depicted in PCSM plans. The majority of the area was greater than 70% vegetative cover or rock-lined and appeared stable. The southeast corner of the cut slope showed large amounts of erosion (Photos #3-5). An orange safety fence was in place above the eroding bank. It is recommended that the southeast corner of the pad be stabilized in order to prevent more slope damage. No violations noted at this time. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2225001 | 683897 | 11/25/2013 | 2013-11-25 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | |
2225001 | 683898 | 11/25/2013 | 2013-11-25 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | |
2225001 | 683899 | 11/25/2013 | 2013-11-25 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[8]