X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-21666

Well Details

Well ID: 37-015-21666
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Wilmot Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148903
Farm/Lease Name: MOBEAR 5H
License Status: INACTIVE
Spud Date:
Permit Date: 2011-05-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.600153
Longitude: -76.245683

For data sources see[1][2][3]

Well History

Date Event
2011-05-12 New Permit Application
2011-05-17 Performed Spud Operation
2011-11-18 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-09 2013-03-14 7,605 4,389,880 239,310

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SC30 X CHEM Scale Inhibitor Sodium Polyacrylate 009003-04-7 100 0.00831 0
SFR-451 X CHEM Friction Reducer Ammonium Acetate 000631-61-8 6 0.00259 0
Petroleum Distillate Hydrotreated Light 064742-47-8 35 0.01511 0
Northern White Sand PUMPCO Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 10.439 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 76.1675 0
Plexhib 256 PUMPCO Corrosion Inhibitor Alkenes^ C>10 alpha- 064743-02-8 5 0.00002000 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00021 0
Ethoxylated Alcohols^ C14-15 068951-67-7 30 0.00011 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00004000 0
Modified Thiourea Polymer 068527-49-1 30 0.00011 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 11.7553 0
100 Mesh Sand PUMPCO Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.28608 0
Acid HCL PUMPCO Acid Hydrochloric Acid 007647-01-0 15 0.03616 0
Water 007732-18-5 85 0.20489 0
Plexbreak 145 PUMPCO Non-Emulsifier 2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) 000111-76-2 15 0.00006000 0
Coconut oil, Diethanolamide 068603-42-9 10 0.00004000 0
Diethanolamine 000111-42-2 2 0.00001000 0
Methanol (Methyl Alcohol) 000067-56-1 15 0.00006000 0
Water 007732-18-5 65 0.00026 0
B84, SC30, SFR-451, SFR-470 X CHEM Anti-Bacterial Agent, Friction Reducer, Scale Inhibitor Sorbitol Tetraoleate 061723-83-9 0 0.02404 0
Sorbitan Monooleate 001338-43-8 0 0.06317 0
Alcohol ethoxylate C-10/16 with 6.5 EO 068002-97-1 0 0.03913 0
Alcohols ethoxylated C12-16 068551-12-2 0 0.03913 0
Polypropenamide 910644-97-2 0 0.03913 0
Proprietary Surfactant TRADE SECRET 0 0.06317 0
Water 007732-18-5 0 0.10328 0
Polyethylene Glycol Monooleate 009004-96-0 0 0.02404 0
Ethoxylated Oleylamine 026635-93-8 0 0.03913 0
Alcohols, C12-C14-Secondary, Ethoxylated 084133-50-6 0 0.02404 0
Ethoxylated Alcohol 068439-50-9 0 0.03913 0
Polyacrylamide (Acrylamide, Ammonium Acrylate Copolymer) 026100-47-0 0 0.02404 0
Ferriplex 40 PUMPCO Iron Control Agent Water 007732-18-5 60 0.00086 0
Sodium Hydroxide 001310-73-2 1 0.00001000 0
Sodium Sulfate 007757-82-6 2 0.00003000 0
Trisodium Nitrilotriacetate 005064-31-3 40 0.00058 0
SFR-470 X CHEM Friction Reducer Ethoxylated Alcohol 068439-50-9 5 0.00152 0
Alcohols ethoxylated C12-16 068551-12-2 5 0.00152 0
Quaternary Ammonium Chloride (Ammonium Chloride) 012125-02-9 15 0.00455 0
Alcohol ethoxylate C-10/16 with 6.5 EO 068002-97-1 5 0.00152 0
Petroleum Distillate Hydrotreated Light 064742-47-8 35 0.01061 0
B84 X CHEM Anti-Bacterial Agent Glutaraldehyde (Pentanediol) 000111-30-8 27 0.00732 0
Ethanol 000064-17-5 4 0.00108 0
Didecyl Dimethyl Ammonium Chloride 007173-51-5 8 0.00217 0
Quaternary Ammonium Compound 068424-85-1 6 0.00149 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 2,233,869.00 274 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 1,573,451.00 364 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 1,091,463.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 2,579.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 599.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 3,580.26 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 67.50 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 1.30 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 205.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 101.50 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 109.70 Tons LANDFILL 301626
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 1.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 1.30 Tons CENT WASTE TRT FAC NPDES PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 52.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 107.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1978325 Primary Facility 2011-06-07 Drilling/Alteration No Violations Noted Nomac 112. Curent depth 2050.
1990449 Primary Facility 2011-07-18 Routine/Complete Inspection No Violations Noted No venting off of 9 5/8 or 13 3/8. 100psi on production string.
2082609 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted
2086715 Primary Facility 2012-07-25 Follow-up Inspection No Violations Noted On site w/ Eric Rooney to collect gas samples. Also Shawna, SAIC and Chris, Rods Prod Serv. Annuli were shut in Monday 7/23/12 at 11 AM. 0 pressure and 0 gas on all annuli, no samples taken.
2179874 Primary Facility 2013-07-01 Routine/Complete Inspection No Violations Noted
2194487 Primary Facility 2013-08-09 Routine/Complete Inspection No Violations Noted Inspection for 'Inactive Well Status' application.
2378495 Primary Facility 2015-06-12 Routine/Complete Inspection No Violations Noted Arrived on site at 10:15 and departed at 10:50. Weather conditions were sunny and ~80° F. No Chesapeake representatives were present during the inspection.
2591728 Primary Facility 2017-05-09 Routine/Complete Inspection No Violations Noted Two Wells in production phase. Two each sand and water separators. No leaks detected. Site stable. No violations noted.
2725406 Primary Facility 2018-05-02 Routine/Complete Inspection No Violations Noted Two wells staged for production phase. Two each sand and water separators. Dump line wrapped in insulation. No leaks detected from production equipment. No violations noted.
2829642 Primary Facility 2019-01-17 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 13:10; the weather was ~25°F and calm.

There were 2 properly tagged Marcellus wells staged for production. The well cellars were filled with water and partially frozen; no bubbling was observed. There were 2 GPUs and sand separators onsite. There was also 1 produced water tank onsite and in secondary containment.

The pad remained full size. Areas around the pad were greater than 70% vegetative cover and appeared stable. No E&S issues were observed. PCSM also appeared to be installed (Photo #1).

No violations noted.

For data sources see[8]

References