X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22501

Well Details

Well ID: 37-015-22501
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Monroe Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 145182
Farm/Lease Name: YENCHA BRA 2H
License Status:
Spud Date:
Permit Date: 2013-01-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.625803
Longitude: -76.494153

For data sources see[1][2][3]

Well History

Date Event
2013-01-23 New Permit Application
2013-05-16 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-21 2014-06-29 8,828 5,874,410 403,230

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh Sand TRICAN Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.28938 0
GFR-1D TRICAN Friction Reducer Proprietary Anionic Water-Soluble Polymer TRADE SECRET 100 0.01461 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 86.079 0
OilSafe AR (Acid Replacement) HEARTLAND SOLUTIONS Acid Patented Synthetic Acid TRADE SECRET 100 0.26828 0
Chlorine Dioxide TERRA SERVICES Anti-Bacterial Agent Chlorine Dioxide 010049-04-4 100 0.01199 0
Northern White Sand TRICAN Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.3275 0
TS-30 TERRA SERVICES Scale Inhibitor Water 007732-18-5 0 0.01065 0
Proprietary Sodium Polycarboxylate TRADE SECRET 100 0.0092 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 1,486,504.00 146 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 3,003,906.00 351 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 2,125,801.00 356 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,695,302.00 364 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 1,401,944.00 365 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 1,146,213.00 324 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHESAPEAKE APPALACHIA LLC Drill Cuttings 573.37 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR097R017
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 109.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2013 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 1,098.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 13,279.48 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Fracturing Fluid Waste 17.00 Tons LANDFILL 301626
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 5,022.71 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 467.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 64.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,112.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 57.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 337.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 107.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 71.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 59.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 67.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 26.50 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 54.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 148.50 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2144630 Primary Facility 2013-02-27 Routine/Partial Inspection No Violations Noted culvert inspection
2165926 Primary Facility 2013-05-13 Routine/Partial Inspection No Violations Noted
2171283 Primary Facility 2013-05-30 Drilling/Alteration No Violations Noted 20" cond set
2173162 Primary Facility 2013-06-06 Routine/Partial Inspection No Violations Noted
2180653 Primary Facility 2013-07-02 Drilling/Alteration No Violations Noted NOMAC 112, @ 8410'
2182790 Primary Facility 2013-07-08 Routine/Complete Inspection No Violations Noted The PPC plan in the company man’s trailer is dated October of 2012. The master containment plan as an appendix of the PPC plan is (2) pages. The ERP plan is dated April 2010. I surveyed the secondary containment systems at the site and backyard (solid waste processing and handling area) at the site. There was quite a bit of standing water on containment mainly due to the rain event during the inspection. A storage container in the backyard appeared to be right at the (2)’ freeboard requirement of Title 25, Pa. code 78.56. Mr. Groves indicated the fluid in this container is mainly containment water and that it will be sent either today or tomorrow to the Sharer site for treatment and intent for beneficial reuse. The freeboard level will be continuously monitored in the tank.
2363911 Primary Facility 2015-04-23 Routine/Complete Inspection No Violations Noted Arrived on site 13:45, departed 14:10. Weather conditions were cloudy, windy, ~35°F. No Chesapeake representatives were present during the inspection.
2563442 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted
2789027 Primary Facility 2018-10-12 Site Restoration No Violations Noted The operator submitted a Notice of Termination (NOT) which was received by the department October 3, 2018 and which prompted this inspection.

Two wells are staged for production on the Yencha pad: the Yencha 2H well and Three D Acres 2H Well. Two GPUs are on site as well as two Produced water tanks within steel containment with a spray-in liner. Both produced water tanks and containment are in good condition overall. One tank has one small spot of corrosion on it.

Post Construction Stormwater Management (PCSM) is handled by a series of rock-lined channels, rock spreaders and infiltration berms. These appear to be functioning as designed. The side slopes, berms which surround the pad surface, the soil stockpile and infiltration areas near the infiltration berms are all well-vegetated with greater than 70% vegetation. The pad surface has been permitted to remain at full size.

Site is stable.

No violations noted.

I recommend acknowledging the NOT.

For data sources see[8]

References