X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-23438

Well Details

Well ID: 37-015-23438
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Troy Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155406
Farm/Lease Name: BROADLEAF HOLDINGS (01-115-02) 2H
License Status:
Spud Date:
Permit Date: 2018-08-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.821814
Longitude: -76.789790

For data sources see[1][2][3]

Well History

Date Event
2018-08-30 New Permit Application
2018-12-18 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 1,119,300.30 151 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 28.77 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 740.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.02 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 6.30 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 12,495.83 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 17.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.02 Tons RESIDUAL WASTE TRANSFER FACILITY 101611
2019 REPSOL OIL & GAS USA LLC Produced Fluid 51.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Produced Fluid 521.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Drill Cuttings 92.09 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 7.63 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 166.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Drill Cuttings 1,277.05 Tons LANDFILL 101243
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 24.34 Tons LANDFILL 301358
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 693.80 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.01 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2791336 Primary Facility 2018-10-18 Preoperation Inspection No Violations Noted This inspection fulfills Oil & Gas Act 3258 (a.1) Pre-operation Inspections.

I spoke with Jeff Watts (JL Watts) and Tyrell Wheeler (Repsol) on site. They explained that the heavy equipment (e.g. bulldozers) constructing the pad utilize GPS systems to guide their operators. JLP

2816811 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted At time of inspection, crew were spudding/setting conductor pipe.
2825696 Primary Facility 2019-01-11 Routine/Partial Inspection No Violations Noted Repsol spudded 4 Marcellus wells (photo 1) here in December, 2018. JLP
2851318 Primary Facility 2019-03-11 Drilling/Alteration No Violations Noted At time of inspection, crew was still moving onto well pad and setting up rig.

Will return at a later date when drilling operations begin to perform a complete inspection.

2853932 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted I spoke with Terry Anderson (Repsol) on site. He said they'll be drilling the 4 Marcellus wells on this pad for about 2 more months.

I used an Oakton PCSTestr 35 to get electrical conductivity readings from pooled water on site. A puddle on the secondary containment liner returned 0.23 mS/cm, a puddle in the rock lined ditch near access road returned 0.34 mS/cm. JLP

For data sources see[7]

References