If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-01464 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.69945,"lon":-79.77502,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Buffalo Township | |
Operator Name: HERMAN RIEMER GAS CO | |
Well Pad ID: | |
Farm/Lease Name: COGLEY 28 | |
License Status: Plugged and Abandoned | |
Spud Date: | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.699450 | |
Longitude: -79.775020 |
Date | Event |
---|---|
1927-01-01 | Drilling Completion |
1995-08-18 | Old Well |
2018-04-02 | Begin Plugging |
2018-05-01 | Finished Plugging |
2019-02-08 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2005 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | HERMAN RIEMER GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2597716 | Primary Facility | 2017-05-23 | Routine/Partial Inspection | No Violations Noted | |
2712792 | Primary Facility | 2018-03-22 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Dishong was onsite setting up a silt fence to control sediment from earth work. There is a stream just downhill of well and access road. Paperwork was going to be sent in to plug the well. He hopes to move the rig in tomorrow or Saturday, depending on the rain. A bit of work will be needed to allow access for bigger trucks to make it to well. |
2719313 | Primary Facility | 2018-04-10 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection, rig was set up at well and tubing was at bottom (2650'). Well was also logged. A small pit was dug and a liner was sitting next to it (to prevent rainwater from filling up pit and having more liquid to haul away). There were also 2 plastic totes and a 50 bbl poly tank. The entire access road now has a silt fence along it and gravel was added near the main road. Plan is to start cementing tomorrow. |
2719315 | Primary Facility | 2018-04-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection, well has been cemented from TD (2650') up to 1300'. The liner for the pit was in the pit and had to be used. 30 bbls of water was circulated into well ahead of cementing and some oil came to surface. It was all captured in the pit.
Plugging operator will finish cementing once he returns from vacation. |
2729237 | Primary Facility | 2018-05-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection, well has been buried underground. 4 7/8" casing had been shot at 1250' and 50' was pulled out when a big cave occurred. Attempted to pull with 30,000 lbs, but no luck. Casing would not move back down the well either. It was decided to reshoot the casing at 1030'. All of that was pulled out. Casing remaining in well was from 1030'-1200'. Cement was pumped from 1300' up to 200' (was aiming for 300', but none of the cement was taken by formation). Pea gravel was poured from 200' to surface. API was welded on a steel plate and buried underground. Some reclamation needs done, but a bearing needs fixed on equipment. Silt fence will remain in place for the next year to allow ground to settle. |
2739072 | Primary Facility | 2018-06-08 | Administrative/File Review | No Violations Noted |
For data sources see[6]