If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21583 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.998231,"lon":-79.69025,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Fairview Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-08-26 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.998231 | |
Longitude: -79.690250 |
Date | Event |
---|---|
2008-08-26 | New Permit Application |
2008-09-30 | Performed Spud Operation |
2008-10-03 | Drilling Completion |
2008-11-25 | Perforation |
2010-07-02 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | 1,776.92 | 31 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 8,280.59 | 365 | 9.92 | 365 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 3,116.92 | 365 | 24.16 | 365 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 1,932.31 | 304 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 1,751.99 | 305 | 66.03 | 305 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 1,665.28 | 304 | 9.92 | 304 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 1,125.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 367.53 | 274 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 349.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 1,534.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 912.98 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 1,904.02 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | DANNIC ENERGY CORP | Produced Fluid | 492.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2009 | DANNIC ENERGY CORP | Produced Fluid | 109.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 770.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 126.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 470.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 479.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 170.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | DANNIC ENERGY CORP | Produced Fluid | 457.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2013 | DANNIC ENERGY CORP | Produced Fluid | 113.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2014 | DANNIC ENERGY CORP | Produced Fluid | 546.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 3,360.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2017 | DANNIC ENERGY CORP | Produced Fluid | 444.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2017 | DANNIC ENERGY CORP | Produced Fluid | 257.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2018 | DANNIC ENERGY CORP | Produced Fluid | 103.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2019 | DANNIC ENERGY CORP | Produced Fluid | 658.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1739590 | Primary Facility | 2008-10-02 | Drilling/Alteration | No Violations Noted | |
1891684 | Primary Facility | 2010-06-07 | Routine/Complete Inspection | Violation(s) Noted | |
1897159 | Primary Facility | 2010-07-09 | Compliance Evaluation | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1891684 | 589603 | 06/07/2010 | 2010-06-07 | 78.64 - Inadequate containment of oil tank | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
589603 | 260463 | NOV - Notice of Violation | Comply/Closed | 2010-07-09 |
For data sources see[7]