If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21837 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.797806,"lon":-79.904989,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Penn Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148420 | |
Farm/Lease Name: GODFREY UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-04-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.797806 | |
Longitude: -79.904989 |
Date | Event |
---|---|
2011-04-11 | New Permit Application |
2012-02-03 | Performed Spud Operation |
2012-03-08 | Drilling Completion |
2012-05-04 | Perforation |
2013-06-21 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-05-22 | 2012-05-22 | 5,938 | 4,158,664 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Biocide - MC 8650 | Multi-Chem Group | Biocide | Glutaraldehyde | 111-30-8 | 60.00 | 0.00300000 | |
Onter-(non Hazardous) | 40.00 | 0.00200000 | ||||||
Whole Product | ||||||||
Friction Reducer-MC MX 14-5 | Multi-Chem Group | Friction Reducer | Whole Product | |||||
Other- (non hazardous) | 70.00 | 0.04 | ||||||
Hydrotreated Light Distillates (10-30) | 30.00 | 0.01 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 10.84 | |||
Water | Water | 7732-18-5 | 100.00 | 88.66 | ||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00053000 | ||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00 | |||||
Whole Product | ||||||||
Acid - 7.5 HCL Acid | Universal Well Services | Acid | Hydrogen Chloride (31-33) blended dow to 7.5 | 7.50 | 0.03 | |||
Whole Product | ||||||||
Other - (non Hazardous) | 92.50 | 0.37 | ||||||
Acid Inhibitor | Universal Well Services | Corrosion Inhibitor | Ethoxylated Alcohol | 25.00 | 0.00008000 | |||
Diethylene glycol monobutyl ether | 112-34-5 | |||||||
Short Chained Glycol Ether | 50.00 | 0.00016000 | ||||||
Proprietary Blend Surfactant | 25.00 | 0.00008000 | ||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Whole Product | |||||
Onter-(non Hazardous) | 100.00 | 0.01 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | PHILLIPS EXPLORATION INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 352,214.00 | 139 | 0.00 | 0 | 345.49 | 139 |
2014 | XTO ENERGY INC | 856,441.00 | 360 | 0.00 | 0 | 189.14 | 176 |
2015 | XTO ENERGY INC | 547,028.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 369,202.00 | 340 | 0.00 | 0 | 100.68 | 114 |
2017 | XTO ENERGY INC | 371,258.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 270,845.66 | 284 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 234,380.16 | 229 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 2,004.04 Tons | CENT WASTE TRT FAC NPDES | 100403 |
2012 | XTO ENERGY INC | Drill Cuttings | 2,004.04 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | 100403 |
2013 | XTO ENERGY INC | Produced Fluid | 133.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 416.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 60.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 416.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Drilling Fluid Waste | 260.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 955.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 1,141.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 694.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | XTO ENERGY INC | Produced Fluid | 1,141.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 502.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 107.10 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | XTO ENERGY INC | Produced Fluid | 1,013.64 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 4,771.11 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 228.80 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 147.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2014 | XTO ENERGY INC | Produced Fluid | 165.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 165.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 121.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2015 | XTO ENERGY INC | Produced Fluid | 563.20 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 43.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 2,291.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 472.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 619.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 305.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 298.01 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 798.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 795.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 220.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 327.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 127.64 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 232.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 44.20 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2040099 | Primary Facility | 2012-02-03 | Drilling/Alteration | No Violations Noted | |
2040861 | Primary Facility | 2012-02-07 | Drilling/Alteration | No Violations Noted | |
2044857 | Primary Facility | 2012-02-23 | Drilling/Alteration | No Violations Noted | |
2045699 | Primary Facility | 2012-02-28 | Drilling/Alteration | No Violations Noted | |
2048422 | Primary Facility | 2012-02-28 | Routine/Partial Inspection | No Violations Noted | |
2048477 | Primary Facility | 2012-03-05 | Drilling/Alteration | No Violations Noted | |
2060593 | Primary Facility | 2012-04-16 | Routine/Partial Inspection | No Violations Noted | |
2070216 | Primary Facility | 2012-05-22 | Drilling/Alteration | No Violations Noted | |
2077172 | Primary Facility | 2012-06-14 | Routine/Partial Inspection | No Violations Noted | |
2097921 | Primary Facility | 2012-09-06 | Routine/Partial Inspection | No Violations Noted | |
2163780 | Primary Facility | 2013-05-01 | Routine/Partial Inspection | No Violations Noted | |
2699800 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Two wells properly tagged and in production. Two gas processing units and three 400 bbl tanks installed within steel containment structure. No apparent issues. |
For data sources see[8]