X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22020

Well Details

Well ID: 37-019-22020
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145088
Farm/Lease Name: CYPHER B UNIT 1H
License Status:
Spud Date:
Permit Date: 2013-01-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.882564
Longitude: -79.749669

For data sources see[1][2][3]

Well History

Date Event
2013-01-31 New Permit Application
2013-04-19 Performed Spud Operation
2013-08-16 Drilling Completion
2014-09-16 Perforation
2015-03-11 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-16 2014-10-10 5,864 5,364,790 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00332953 1680.87
Hydrochloric Acid 7647-01-0 15 0.00292999 1479.17
Other - (non-hazardous) NA 85 0.0754694 38099.8
Hydrochloric Acid 7647-01-0 15 0.00705861 3563.45
Sand (Proppant) Universal Proppant Silica Substrate NA 100 10.3095 5,204,600.0
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00319356 1612.23
Other - (non-hazardous) NA 70 0.00745165 3761.87
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0137725 6952.85
Other - (non-hazardous) NA 92.5 0.772092 389781
Hydrochloric Acid 7647-01-0 7.5 0.0156505 7900.97
Hydrochloric Acid 7647-01-0 7.5 0.0331791 16750.1
Biocide, EC6116A Nalco Biocide Other - (non-hazardous) NA 5 0.00104449 527.3
Polyethylene Glycol 25322-68-3 60 0.0125339 6327.6
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00626696 3163.8
Dibromoacetonitrile 3252-43-5 5 0.00104449 527.3
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0383913 19381.4
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0164534 8306.3
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Formaldehyde 50-00-0 1 0.00000437 2.206
Thiourea 62-56-6 1 0.00000437 2.206
Ethoxylated alcohol 68002-97-1 35 0.000152933 77.206
Methanol 67-56-1 5 0.00002185 11.029
Acetophenone 98-86-2 1 0.00000437 2.206
Short chained glycol ether 112-34-5 60 0.000262171 132.354
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.6802 44,769,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 201,242.00 235 0.00 0 0.00 0
2016 XTO ENERGY INC 79,485.00 228 0.00 0 15.00 54
2017 XTO ENERGY INC 54,330.00 101 0.00 0 5.83 47
2018 XTO ENERGY INC 15,880.09 68 0.00 0 4.17 12
2019 XTO ENERGY INC 41,453.48 152 0.00 0 0.56 31

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 678.73 Tons LANDFILL 100403
2013 XTO ENERGY INC Drill Cuttings 240.00 Tons LANDFILL 101397
2014 XTO ENERGY INC Produced Fluid 95.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 811.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 197.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 1,932.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 1,173.10 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 14,828.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 735.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Fracing Fluid Waste 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 455.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 112.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Fracturing Fluid Waste 0.71 Tons RESIDUAL WASTE TRANSFER FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 192.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,947.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 125.42 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 360.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Other Oil & Gas Wastes 3.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 225.08 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 225.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 123.87 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 373.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 273.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 624.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2160837 Primary Facility 2013-04-23 Drilling/Alteration No Violations Noted
2196987 Primary Facility 2013-08-15 Drilling/Alteration No Violations Noted
2209007 Primary Facility 2013-09-27 Routine/Partial Inspection No Violations Noted
2225470 Primary Facility 2013-11-20 Routine/Partial Inspection No Violations Noted
2271487 Primary Facility 2014-05-13 Routine/Partial Inspection No Violations Noted
2532631 Primary Facility 2016-10-19 Routine/Partial Inspection No Violations Noted
2595779 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted On site for a partial inspection of the Cypher B Unit 1H Well.

Well is drilled & completed, and in production.

Well is attached to production equipment (production tank, GPU, & combustor). Well feeds to a gathering pipeline on site. Well tag in place. Well is fenced & protected with jersey barriers.

Well pad has been restored per the PCSM plans. All temporary E/S controls removed.

2791094 Primary Facility 2018-10-18 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Well protected.

Site has 10 drilled and completed wells. Wells are fenced. Site has 12 production tanks on containment. Site has 10 GPUs on containment. There is 1 combustor on site. There is a pipeline header on the well pad.

2815875 Primary Facility 2018-12-14 Routine/Partial Inspection No Violations Noted On 12/14/2018, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Well site consists of 10 wells in production permit nos. A1H (019-22019), B1H (019-22020), A2H (019-22053), A3H (019-22054), B2H (019-22166), A4H (019-22167), A5H (019-22173), B5H (019-22174), B4H (019-22175) and B3H (019-22176). Production equipment consists of twelve 400 bbl tanks within stainless steel containment structure, 10 GPUs and one TVO. Site well vegetated and maintained. Earth disturbance permit ESX12-019-0161 terminated on 5/19/2017.

For data sources see[8]

References