X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22024

Well Details

Well ID: 37-019-22024
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jackson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 144590
Farm/Lease Name: BAILLIE TRUST UNIT 2H
License Status:
Spud Date:
Permit Date: 2013-01-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.760539
Longitude: -80.087092

For data sources see[1][2][3]

Well History

Date Event
2013-01-29 New Permit Application
2013-04-12 Performed Spud Operation
2013-04-24 New Permit Application
2013-07-08 Drilling Completion
2013-09-21 Perforation
2014-08-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-25 2013-10-10 5,566 7,215,890

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Rex Base Fluid Water 7732-18-5 100 89.0931 0
NE-100L ICI Non-Emulsifier Dodecylbenzenesulfonic Acid 27176-87-0 5 0.00007000 0
2-Butoxyethenol 111-76-2 10 0.00015 0
2-Propanol 67-63-0 10 0.00015 0
FRW-200W ICI Friction Reducer Ethylene Glycol 107-21-1 4 0.00256 0
Petroleum Distillate 64742-47-8 30 0.0192 0
Sand Vertex Proppant Silica Sand 14808-60-7 100 9.11222 0
CS-500 SI ICI Scale Inhibitor Ethylene Glycol 107-21-1 10 0.00465 0
Acid FTS Acidizing Hydrochloric Acid 007647-01-0 7.5 0.1197 0
ICI-3240 ICI Bacteriacide Dazomet 533-74-4 24 0.01154 0
Sodium Hydroxide 1310-73-2 4 0.00192 0
CI-150L ICI Corrosion Inhibitor Organic Amine Resin Salt Proprietary 10 0.00027 0
Quaternary Ammonium Compound Proprietary 5 0.00014 0
Dimethylformamide 68-12-2 10 0.00027 0
Isopropanol 67-63-0 30 0.00081 0
Aromatic Aldehyde Proprietary 5 0.00014 0
HVG-1 FTS Gel Clay 14808-60-7 2.5 0.00076 0
Guar Gum 9000-30-0 45 0.01359 0
Surfactant 68439-51-0 2.5 0.00076 0
Petroleum Distillate 64742-47-8 50 0.0151 0
APB-1 FTS Breaker Ammonium Persulfate 7727-54-0 95 0.00046 0
FE-100L ICI Iron Control Citric Acid 77-92-9 55 0.00289 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 RE GAS DEV LLC 67,894.54 35 0.00 0 155.31 35
2014 RE GAS DEV LLC 460,978.86 365 476.56 184 808.99 181
2015 RE GAS DEV LLC 493,887.94 349 0.00 0 1,031.22 349
2016 RE GAS DEV LLC 445,791.39 362 0.00 0 337.25 362
2017 RE GAS DEV LLC 405,156.05 360 0.00 0 175.63 360
2018 PENNENERGY RESOURCES LLC 360,470.75 360 0.00 0 121.00 238
2019 PENNENERGY RESOURCES LLC 324,074.00 350 0.00 0 96.00 62

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 RE GAS DEV LLC Produced Fluid 1,055.40 Bbl INJECTION DISPOSAL WELL 34-155-23732
2013 RE GAS DEV LLC Produced Fluid 1,164.98 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 RE GAS DEV LLC Produced Fluid 420.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 RE GAS DEV LLC Produced Fluid 828.32 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 RE GAS DEV LLC Drill Cuttings 1,335.38 Tons LANDFILL 100585
2013 RE GAS DEV LLC Produced Fluid 375.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2013 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2013 RE GAS DEV LLC Produced Fluid 270.12 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 RE GAS DEV LLC Produced Fluid 401.84 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 RE GAS DEV LLC Produced Fluid 240.49 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 RE GAS DEV LLC Produced Fluid 238.81 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-031-27178
2014 RE GAS DEV LLC Produced Fluid 711.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2014 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-155-24076
2014 RE GAS DEV LLC Produced Fluid 623.53 Bbl INJECTION DISPOSAL WELL 34-151-21179
2014 RE GAS DEV LLC Produced Fluid 840.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2014 RE GAS DEV LLC Produced Fluid 365.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 RE GAS DEV LLC Produced Fluid 1,158.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-24075
2015 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-155-24076
2015 RE GAS DEV LLC Produced Fluid 1,105.15 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2015 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2015 RE GAS DEV LLC Produced Fluid 543.37 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Produced Fluid 124.00 Bbl INJECTION DISPOSAL WELL 34-155-24063
2016 RE GAS DEV LLC Produced Fluid 580.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 RE GAS DEV LLC Produced Fluid 538.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2016 RE GAS DEV LLC Produced Fluid 195.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 RE GAS DEV LLC Produced Fluid 300.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 1,189.00 Bbl REUSE (AT WELL PAD)
2017 RE GAS DEV LLC Produced Fluid 1,014.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 RE GAS DEV LLC Produced Fluid 572.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 380.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 106.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 28.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 114.90 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 512.53 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 28.80 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 218.68 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 121.44 Bbl INJECTION DISPOSAL WELL 34-155-22403

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2157236 Primary Facility 2013-04-12 Routine/Partial Inspection No Violations Noted
2157409 Primary Facility 2013-04-15 Drilling/Alteration No Violations Noted
2166068 Primary Facility 2013-05-08 Routine/Partial Inspection No Violations Noted
2177300 Primary Facility 2013-06-13 Drilling/Alteration No Violations Noted
2247440 Primary Facility 2014-02-13 Routine/Partial Inspection No Violations Noted
2275578 Primary Facility 2014-06-02 Routine/Partial Inspection No Violations Noted
2654764 Primary Facility 2017-10-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well appears to be producing. Well integrity is in good condition, with no signs of any leaks or spills at the site. The wellhead has very minor rust on it which is superficial. A gauge for casing was reading 263 psi. Cellar was filled with gravel. No water present. The well is properly labeled. The Emergency Response sign remains posted at the lease access entrance. There is a tank for condensate and one for water for each well on the pad contained in an earthen dike (12 total). There are 6 line heaters also present. A gas buster is hooked up as well. Pad is fenced in.
2683191 Primary Facility 2018-01-17 Routine/Complete Inspection No Violations Noted On 1/17/2018, WQS Brian MacQuarrie onsite. Site sign posted at access road entrance. Well pad fenced in and locked. Six wells tagged and in production. Twelve 400 bbl tanks ( six production fluids and six condensate) and six GPUs installed within stainless steel secondary containment. Snow on ground during inspection. No apparent issues.
2787481 Primary Facility 2018-10-11 Site Restoration No Violations Noted On 10/11/2018, WQS Brian MacQuarrie onsite for the purpose of conducting a Notice of Termination inspection for ESCGP ESX13-019-0002. Site consists of six producing wells; 1H-019-22023, 2H-019-22024, 4H-019-22025, 3H-019-22030, 5HB-019-22026 and 6HB-019-22067. Tank battery consists of twelve 400 bbl tanks installed within containment. The well site has achieved permanent stabilization according to 25 Pa Code 102.22(a)(2). Therefore, the Notice of Termination request is approved.

For data sources see[8]

References