X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22061

Well Details

Well ID: 37-019-22061
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Concord Township
Operator Name: EM ENERGY PA LLC
Well Pad ID: 145193
Farm/Lease Name: MORROW 1MH
License Status:
Spud Date:
Permit Date: 2013-05-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.967847
Longitude: -79.861136

For data sources see[1][2][3]

Well History

Date Event
2013-05-06 New Permit Application
2013-06-12 Performed Spud Operation
2013-09-12 Drilling Completion
2013-12-22 Perforation
2014-08-21 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-22 2014-01-03 5,670 4,996,610 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 XPL 3300 Steve Strba Consulting Inc Friction Reducer Proprietary NA 60 0.0181385 8186.19
Mineral Oil 64742-52-5 60 0.0181385 8186.19
AI-600 Weatherford Acid Inhibitor Isopropyl Alchol 67-63-0 7 0.000160652 72.505
2-Butoxyethanol 111-76-2 7 0.000160652 72.505
N,N-Dimethylformamide 68-12-2 40 0.000918009 414.313
Ethoxylated Nonylphenol 68412-54-4 10 0.000229502 103.578
Cinnamaldehyde 104-55-2 10 0.000229502 103.578
Ethylene Glycol 107-21-1 60 0.00137701 621.469
Triethyl Phosphate 78-40-0 7 0.000160652 72.505
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.000298353 134.652
LEB10X Clearwater Enzamtic Breaker Ethylene Glycol 107-21-1 60 0.000988373 446.069
Water SWN Water / Produced Water H2O + Disolved Salts 7732-18-5 100 92.3892 41,696,700.0
SI-112 Weatherford Scale Inhibitor Ethylene Glycol 107-21-1 40 0.00411906 1859
Sand Keane Sand Crystalline Silica, Quartz 14808-60-7 100 6.87598 3,103,240.0
15% HCl Reagent Acid HCL 7647-01-0 15 0.0959547 43305.9
K Bac -1020 WST Biocide 2,2-Diobrom-3nirilopropionamide 10222-01-2 20 0.00239369 1080.31
Polyethylene glycol 25322-68-3 60 0.00718106 3240.93
FRA-405 Clearwater Friction Reducer Petroleum Distillates 64742-47-8 40 0.0154775 6985.27
Sodium Chloride 7647-14-5 10 0.00386939 1746.32
Alcohols, C-12-16, Ethoxylated 68551-12-2 7 0.00270857 1222.42
Ammonium Chloride 12125-02-9 7 0.00270857 1222.42

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2014 EM ENERGY PA LLC 0.00 0 0.00 0 362.00 26
2015 EM ENERGY PA LLC 511,022.20 230 0.00 0 2,763.81 212
2016 EM ENERGY PA LLC 448,041.03 288 0.00 0 826.69 288
2017 EM ENERGY PA LLC 462,646.72 347 0.00 0 562.53 347
2018 EM ENERGY PA LLC 253,822.21 314 0.00 0 158.45 314
2019 EM ENERGY PA LLC 20,177.58 21 0.00 0 115.41 21

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 EM ENERGY PA LLC Drilling Fluid Waste 1,528.78 Bbl INJECTION DISPOSAL WELL 34-031-27177
2013 EM ENERGY PA LLC Drill Cuttings 1,290.13 Tons LANDFILL 100585
2013 EM ENERGY PA LLC Drilling Fluid Waste 300.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 EM ENERGY PA LLC Fracing Fluid Waste 22.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE OH0987034667
2014 EM ENERGY PA LLC Produced Fluid 31.00 Bbl INJECTION DISPOSAL WELL 34-089-24792
2015 EM ENERGY PA LLC Fracturing Fluid Waste 2.25 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015 EM ENERGY PA LLC Produced Fluid 3,972.87 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EM ENERGY PA LLC Produced Fluid 218.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 EM ENERGY PA LLC Other Oil & Gas Wastes 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 EM ENERGY PA LLC Other Oil & Gas Wastes 47.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Produced Fluid 740.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Produced Fluid 1,373.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 EM ENERGY PA LLC Other Oil & Gas Wastes 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 EM ENERGY PA LLC Produced Fluid 548.00 Bbl REUSE (AT WELL PAD)
2018 EM ENERGY PA LLC Produced Fluid 102.50 Bbl INJECTION DISPOSAL WELL 34-155-24063
2018 EM ENERGY PA LLC Produced Fluid 581.50 Bbl REUSE (AT WELL PAD)
2018 EM ENERGY PA LLC Produced Fluid 148.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Produced Fluid 146.50 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 EM ENERGY PA LLC Produced Fluid 280.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 EM ENERGY PA LLC Produced Fluid 92.50 Bbl INJECTION DISPOSAL WELL 34-155-24079

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2176892 Primary Facility 2013-06-18 Routine/Partial Inspection No Violations Noted
2178901 Primary Facility 2013-06-26 Drilling/Alteration No Violations Noted
2184431 Primary Facility 2013-07-12 Routine/Partial Inspection No Violations Noted
2194793 Primary Facility 2013-08-12 Routine/Partial Inspection No Violations Noted
2205143 Primary Facility 2013-09-13 Drilling/Alteration No Violations Noted
2205152 Primary Facility 2013-09-11 Drilling/Alteration No Violations Noted
2215515 Primary Facility 2013-10-04 Routine/Partial Inspection No Violations Noted
2229264 Primary Facility 2013-12-11 Routine/Partial Inspection No Violations Noted
2336022 Primary Facility 2015-01-15 Routine/Partial Inspection No Violations Noted
2514166 Primary Facility 2016-08-24 Routine/Partial Inspection No Violations Noted
2658530 Primary Facility 2017-11-08 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Permitted wells are drilled, completed, and in production. Well tags in place. Well pad is fenced and locked. Gathering pipeline in place. Production equipment installed on secondary containment.

Operator had service rig on site today, and was currently working on GPU while I was on site.

Site is vegetated. PCSM installed. No E/S control issues noted while on site.

For data sources see[8]

References